2025-06-12
11 months ago
|
NR.SHIFT
|
Peny Prasetyo
|
364-FN3
|
ganti VCB 2
|
pabrikasi support kabel, cover panel, torque terminasi kabel power, test open close vcb, cleanup ruangan vcb2
|
|
2025-06-12
11 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
364-LD3
|
Service dan repair
|
Check service dan test open close
|
|
2025-06-12
11 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
364-LD2
|
Service dan repair
|
Service,repair dan test damper
|
|
2025-06-12
11 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
364-LD1
|
Service dan repair
|
Service repair dan adjust Damper actuator Continue check by mechanic
|
|
2025-06-12
11 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
433-BE1
|
Activated speed sensor
|
Activated speed sensor result ok ( RIZAL & ANDRI )
|
|
2025-06-12
11 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-BC7
|
Install AUTO grease pump
|
Install AUTO grease pump ( JAJAT & DADANG )
|
|
2025-06-12
11 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
MAIN-GATE-ACCES-CONTROL
|
Inspection electrical and welding tools
|
Inspection electrical and welding tools of PT Sentra AnekaTama found 1 extention cable is not safe no cover and welding machine failure also ground cable failure, PT Truba Jaga Cita, PT RMP all tagging green color ( ADI & TRUBA SUTRI & TRUBA SUSILO )
|
|
2025-06-12
1 year ago
|
NR.N2-OH
|
Yurizal Rachman
|
364-BC5
|
Check dan service
|
Check service dan test safety device
|
|
2025-06-12
1 year ago
|
NR.N2-OH
|
Yurizal Rachman
|
364-BC4
|
Check dan service
|
Check service dan test safety device
|
|
2025-06-12
1 year ago
|
NR.N2-OH
|
Yurizal Rachman
|
364-BC3
|
Check dan service
|
Check service dan test safety device
|
|
2025-06-12
1 year ago
|
NR.N2-OH
|
Yurizal Rachman
|
364-BC2
|
Check dan service
|
Chwck service dan test safety device
|
|
2025-06-12
1 year ago
|
NR.N2-OH
|
Yurizal Rachman
|
364-BC1
|
Check dan service
|
Check service dan test safety device
|
|
2025-06-11
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L3C-RE1-&-L1C-TR1
|
Cleaning Rec dan Tripper Batu bara
|
Cleaning All ( PLC, Drive, MC, Cabin) ( JAJAT & DADAMG )
|
|
2025-06-11
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-OF-PLANT-BUILDING-&-MAIN-GATE
|
Inspection electrical and welding tools
|
Inspection electrical and welding tools of PT Mujur Manggana Megah, Plant building connected cable power portable lamp 10 units also tagging green color, Truba Jaga Cita, all tagging with green color ( ADI & TRUBA SUTRI & TRUBA SUSILO )
|
|
2025-06-11
1 year ago
|
NR.N2-OH
|
Hendro Supramono
|
464-1T1
|
Koneksi dan Terminasi MV kabel
|
Koneksi dan Terminasi MV kabel dengan 3M
|
|
2025-06-10
1 year ago
|
NR.N2-OH
|
Yurizal Rachman
|
394-BE1
|
Pre check service safety device
|
Precheck safety device
|
|
2025-06-10
1 year ago
|
NR.N2-OH
|
Yurizal Rachman
|
364-RM1
|
364 RM 1 T1 T2
|
364 RM1 T1 T2 Replace thermocouple inlet Rawmill 2 eah
|
|
2025-06-10
1 year ago
|
NR.N2-OH
|
Yurizal Rachman
|
364-BF2
|
364 BF2 service solenoid purging
|
Check purging Repair 1 purging ngowos bersihkan membran
|
|
2025-06-10
1 year ago
|
NR.SHIFT
|
Peny Prasetyo
|
364-FN3
|
ganti VCB 2
|
disconect cable power, bongkar panel LBS & pindahankan ke gudang er4 bawah, pabrikasi support panel VCB2
|
|
2025-06-10
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
MECHANICAL-AFR-&-MAIN-GATE
|
Inspection electrical & welding tools
|
Do inspection electrical and welding tools of mechanical AFR also make 1 unsafe electrical tools because not full fill requirement safety and INDOPORLEN, tagging green color ( ADI & TRUBA SUTRI & TRUBA TRI SUSILO )
|
|
2025-06-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-BV3
|
Install Motor cooling Back actuator
|
Install Blower to Motor Back actuator ( MUHAIMIN & ANDRI )
|
|
2025-06-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WS-PLANT-BUILDING-&-MAIN GATE
|
Inspection electrical & welding tools
|
Inspection electrical and welding tools of plant buildinng also repare extantion cable and grinding machine because cable grounding of make danger note for grinhding machine and extantion cable because are bot safety and failure. Inspection electrical and welding of suplier at main gate, Inspection jack hamer of CIVACON. all tagging green color ( ADI & TRUBA SUTRI & TRUBA TRI )
|
|
2025-06-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
PMR Service Analyser IKGA- repare Rel + adjusment Sensor
|
Replace Rel, Cleaning Probe, Calibration Sensor ( RIZAL & ANDRI )
|
|
2025-06-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-L63-RM1
|
PMR Service Critical Motor & LSR RM&CM1
|
Clean up motor and filter motor. Measure vibration-noise-temperature FS & LS motor. Add grease 25 times & 30 times for FS & LS motor until vibration below 4 mm/s and noise below 2 gE ( MUHAIMIN & EVE RAYHAN )
|
|
2025-06-09
1 year ago
|
NR.N2-OH
|
Yurizal Rachman
|
364-BF1
|
Check Purging
|
Check solenoid purging kondisi kerja semua Clean up box panel
|
|
2025-06-09
1 year ago
|
NR.N2-OH
|
Yurizal Rachman
|
364-BE1
|
Check Motion
|
Check motion detector kondisi visual masih OK
|
|
2025-06-09
1 year ago
|
NR.N2-OH
|
Yurizal Rachman
|
363-RM1
|
Disconnect dan discouple pressure transmitter
|
Disconnect dan discouple All pressure transmitter area Raw Mill
|
|
2025-06-09
1 year ago
|
NR.N2-OH
|
Yurizal Rachman
|
364-BC3
|
Service dan repair sensor ML
|
Repair box yg lepas Repair cable gland Simulasi sensor result good
|
|
2025-06-09
1 year ago
|
NR.N2-OH
|
Yurizal Rachman
|
364-BC2
|
Check,repair dan simulasi sensor ML
|
Repaire cable gland,repair box mau lepas,simulasi sensor ML result good
|
|
2025-06-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-PLANT-BUILDING
|
Inspection electrical and welding tools
|
Inspection extention cable 9 unit tagging with green color, repare 3 unit extention cable because cable grounded loose also replace male and female connector ( ADI )
|
|
2025-06-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
364-RM1-PT-CIVACON
|
Inspection electrical and welding tools
|
Inspection electrical and welding tool, tagging green color ( FIRMAN & DADANG )
|
|
2025-06-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
TENT-&-TOILET-OH
|
Install lighting lamp
|
Install lighting lamp for 2 tent and toilet beside work shop nr1, tent OH near work shop mechanic and L63 RM1 ( IMAN & MUHAIMIN & ANDRI & FIRMAN & DADANG )
|
|
2025-06-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Check dan complete PMR dan WBI
|
Complete data check sheet PMR analyzer L63 2K1-L63 2K2-L63 2K3-483 2K1-463 2K1-443 2K1-423 2K1; PMR IR TAD-CCTV-T Scanner-Camera Burner for June 1st weeks. For 423 2K1 complete month April & May 2025 ( ADI & EVE IDAM ) & JAJAT )
|
|
2025-06-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-FA2
|
Prepare instalation Drive 483-FA2 + Prepare Drawing Diagram + IO needed
|
Prepare drawing diagram and IO needed also instalation drive 483 FA2 ( AGUS & FIRMAN & MUHAIMIN & EVE IQBAL )
|
|
2025-06-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR Service Analyser Coal Mill NAR1
|
Clean up flange, sample line, filter sample line, filter balston, diaphragm pump, dryer gas from dirty of coal. Check humidity sensor and filter sensor, result filter ok ( ADI & EVE IDAM )
|
|
2025-06-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-RF2
|
Issue often stop because speed switch failure
|
Service sensor speed switch, test function result ok ( RIZAL & ANDRI )
|
|
2025-06-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
Issue lighting lamp 6th to north TV off
|
Replace lighting lamp with spare lamp, do test on lighting lamp result ok lamp on ( FIRMAN & DADANG )
|
|
2025-06-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3-&-ER4--&-423-BF1
|
PMR Clean Up MCC ER All Area Kiln Nar1, Motor Area 423-BF1
|
Clean up MCC ER3 & ER4 top and bottom floor, filter cabinet, electric room from dirty of dust use brush and vacuum cleaner. Also mop floor top and bottom. Also area motor 423 BF1 ( JAJAT & AIMAN )
|
|
2025-06-03
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR Service Analyser Preheater & IKGA N1
|
Clean up flange, filter sample line, sample line, diaphragm pump, filter balston, dryer gas pump from dirty of dust. Check humidity sensor and inspection filter result filter ok ( AGUS & ANDRI & EVE IQBAL )
|
|
2025-06-03
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-FN1
|
Replace lighting lamp
|
Replace lighting lamp with spare lamp test on result lighting lamp on ( FIRMAN & DADANG )
|
|
2025-06-03
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-&-473-CC1
|
PMR Service Crit Motor & LSR KL & Cooler
|
Clean up motor and filter motor. Measure vibration-noise-temperature FS & LS motor. Add grease 25 times and 30 times for FS & LS make vibration below 4 mm/s, noise below 2 gE ( MUHAIMIN & EVE IDAM )
|
|
2025-06-03
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Complete stop log PMR
|
Complete stop log PMR, scan data for AUDIT API send to Mr. Jajat ( JAJAT & ADI )
|
|
2025-06-02
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Check Portable electric Tools EL01
|
Inspection electrical and welding tools total 29 units tagging blue color ( electrical tools: 25 units, welding tools: 4 units ) ( ADI & EVE IDAM )
|
|
2025-06-02
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR Service CEMS
|
Clean up motor purge air unit and filter purge air-unit swivel window T/R & R of dust hunter, flange with tube dust hunter-alignment dust hunter result ok-transducer A & B flowsic 100-CEMS room-filter cabinet of MCS 100 E-gas room of CEMS from dirty of dust ( RIZAL & ANDRI )
|
|
2025-06-02
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-&-473-CC1
|
PMR Service Critical Motor & LSR Kiln & Cooler 1
|
Clean up motor and filter motor, measure vibration-noise-temperature FS & LS motor. Add grease 20 times and 25 times for FS & LS motor make vibration below 4 mm/s, noise below 2 gE ( MUHAIMIN & EVE IDAM )
|
|
2025-06-02
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-L63-RM1
|
PMR Service Critical Motor & LSR RM & CM1
|
Clean up motor and filter motor, measure vibration-noise-temperature FS & LS motor. Add grease 20 times and 30 times for FS & LS motor make vibration below 4 mm/s, noise below 2 gE ( AGUS & DADANG )
|
|
2025-05-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
PMR ampere kiln check cycle how many periode of month at weekly
|
Check sheet result found 3 file: PMS 463 KL1 frequency 120 days, PMR MV motor frequency 120 days, Speed Calibration frequency 1 years ( ADI & EVE IDAM )
|
|
2025-05-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-SX1.M1
|
Top up grease
|
Do top up grease of L63 SX1 M1. Measure vibration-noise FS & LS result normal
|
|
2025-05-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
-L63-LQ1.M1
|
Top up grease
|
Do top up grease of L63 LQ1 M1. Measure vibration-noise FS & LS result normal ( MUHAIMIN & FIRMAN & DADANG )
|
|
2025-05-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L3A-BC1
|
Repair sensor ML
|
Check at local, found propeller sensor broken, service propeller at work shop. Install sensor ML at local test function result ok ( RIZAL & ANDRI & EVE IQBAL )
|
|
2025-05-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR Service Analyser Coal Mill NAR1
|
Clean up flange, sample line, filter sample, diaphragm pump, filter balston, dryer gas pump from dirty of coal. Check humidity sensor and filter humidity sensor, result filter ok ( ADI & EVE IDAM )
|
|
2025-05-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER4
|
Specification PMR MCC load ,Check I/O&UPS ER4 NAR1
|
Check temperature and ampere for trafo cable at ER4 result ok. Put spare battery UPS 20 each at ER4 ( FIRMAN & MUHAIMIN & DADANG )
|
|
2025-05-28
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Fabrication cover for battery
|
Do fabrication cover battery ( FIRMAN & DADANG )
|
|
2025-05-28
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Complete Data, All Doc PMR, WBI, Data API Foto Copy PDF Adi, ZT, EVE Idam, Farchan
|
Complete data PMR & WBI for month 2025 from January until May 2025 continue scan all data send to Mr.Jajat email. Complete data check clean up MCC ER3-ER4-ER5-ER6 from december 2024 until may 2025 ( ADI & JAJAT & FARCHAN & EVE IDAM )
|
|
2025-05-28
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
WBI Elect & Ins & Check I/O CM,Sump T&T
|
Do WBI Elect & Ins & Check I/O CM,Sump T&T. Measure vibration-noise-temperature FS & LS motor. Write not normal vibration and noise motor ( RIZAL & ANDRI & EVE IQBAL )
|
|
2025-05-28
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR Service Analyser Preheater & IKGA N1
|
Clean up flange, probe, filter probe, sample line, diaphragm pump, filter baltson, dryer gas pump from dirty of dust. Check filter humidity sensor, result filter ok ( RIZAL & ANDRI & EVE IQBAL )
|
|
2025-05-27
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CCR
|
NAR 2 Install / Reconnect Operator NAR2 Section Kiln Area
|
Prepare ALL connection LAN (PC-CCTV,APC) , Pulling cable Radio, Prepare PC Unit, Cleaning Filter Server , dismantling table + accessories ex NAR 2 ( AGUS & JAJAT & ADI & FIRMAN & MUHAIMIN & ANDRI & DADANG & EVE IDAM & EVE IQBAL )
|
|
2025-05-27
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Complete data check sheet PMR & WBI month of may 2025
|
Complete data for preparing AUDIT API ( JAJAT & ADI )
|
|
2025-05-27
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
CCTV WS off
|
Still observation, test Signal Ok, confirm IT ( AGUS & ADI & DADANG )
|
|
2025-05-27
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-&-473-CC1
|
PMR Service Critical Motor & LSR KL & Cooler
|
Clean up area motor and filter motor. Measure vibration-noise-temperature free side and load side motor. Add grease 10 times for FS & LS until vibration & noise normal ( MUHAIMIN & EVE IQBAL & EVE IDAM )
|
|
2025-05-27
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR Service CEMS
|
Clean up motor and filter purge air unit, swivel window T/R & R dust hunter, and flange with tube dust hunter, alignment dust hunter, transducer A &B flowsic 100, CEMS room and filter cabinet MCS 100 E also gas bottle room from dirty of dust ( FIRMAN & ANDRI )
|
|
2025-05-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CCR
|
NAR 2 Install / Reconnect Operator NAR2
|
Do install and reconnect cable power for Operator Nr2 at CCR ( JAJAT & AGUS & RIZAL & ANDRI & FIRMAN & MUHAIMIN & ADI & DADANG )
|
|
2025-05-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Make notification WBI electric and instrumentation bottom blending-cooler-clinker silo
|
Make notification for WBI electric and instrumentation bottom blending-cooler-clinker silo ( ADI & EVE IDAM )
|
|
2025-05-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
TPM complete Data Dashboard
|
Complete data dash board TPM L63 FN1 & L63 IP1. Print out at put at dash board work shop. Make safety file TPM also print out and put at dash board TPM work shop ( ADI & EVE IQBAL )
|
|
2025-05-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-CT1
|
Install Indication Flow Meter
|
Install indication flow meter, result ok ( RIZAL & ANDRI )
|
|
2025-05-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-L63-RM1
|
PMR Service Critical Motor & LSR RM&CM1
|
Clean up area motor and filter motor. Measure vibration-noise-temperature motor free and load side. Add grease 20 times-30 times for FS & LS. Replace 3 unit carbon brush at 363 MD1 because actual long are short information from Mr.Najib CBM (MUHAIMIN & EVE IDAM )
|
|
2025-05-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FN4
|
Repare Power Greasing
|
Make reparing power greasing 473 FN4, replace power supply input 110-220 VAC and output 24 VDC, test function AUTO Grease motor result ok ( MUHAIMIN & DADANG )
|
|
2025-05-23
1 year ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
443-CT1
|
Flow meter value is not indication at CCR
|
Found card error at control flow meter advise need to replace ( MUHAIMIN & DADANG )
|
|
2025-05-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
453-PF1
|
Repare Solenoid Purging system
|
Install Water trap and Regulator ( RIZAL & ANDRI )
|
|
2025-05-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
413-3B1-&-413-3B2-&-473-CC1-&-493-3B1
|
WBI Elec & Ins & Check I/O & S Pump Blending , Cooler, Clinker Silo
|
Do WBI area bottom blending-cooler-clinker silo. Measure vibration-noise-temperature FS & LS motor, write unnormal condition ( JAJAT & ADI )
|
|
2025-05-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-BF1.-T1-AND-T2
|
Issue indication temperature low at CCR
|
Repare connection at sensor, result indication temperature normal ( RIZAL & ANDRI )
|
|
2025-05-22
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1-SUMP-PUMP
|
Fix for Power Sump Pump Coal Mill HS
|
Make fix connection power supply coal mill at HS room ( MUHAIMIN )
|
|
2025-05-22
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FN4
|
Issue AUTO grease is not working
|
Check at location found there is no power for AUTO grease motor. Replace power supply 220 VAC to 24 VDC, test function result ok ( MUHAIMIN )
|
|
2025-05-22
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FA5-TEMPARATURE-FS
|
Issue indication temperature abnormal
|
Clean up sensor and tighten cable because found untighten cable sensor, result indication temperature back to normal ( RIZAL & ANDRI )
|
|
2025-05-22
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1-T1
|
Issue indication temperature abnormal
|
Check at site, found cable at sensor is not tight, tighten cable sensor result indication temperature normal ( RIZAL & ANDRI )
|
|
2025-05-22
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-FN1
|
Support testing AUTO Balancer
|
Do support testing AUTO Balancer ( AGUS & FIRMAN & JAJAT )
|
|
2025-05-22
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER4
|
Observation replace battery UPS ER-04 2402 need replace 6 unit
|
Replace battery UPS ER-04 2402 6 unit ( AGUS & FIRMAN & DADANG )
|
|
2025-05-22
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG
|
Cleaning area HRG and install level imodification
|
Cleaning area HRG inside and outside room, filter at outside HRG room, PLC HRG from dirty of dust use instrument air supply and hand blower. Install level modification at WTP of HRG test indication al PLC already appear ( RIZAL & ADI & MUHAIMIN & ANDRI & DADANG & JAJAT )
|
|
2025-05-21
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Completing data check sheet WBI month of may 2025
|
Do completing data sheet WBI month of may 2025 ( ADI )
|
|
2025-05-21
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
Install control sump pump
|
Install control sump pump. test function result ok ( FIRMAN & DADANG )
|
|
2025-05-21
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-HC1-
|
Check Hoist Crane RM
|
Check hoist crane at raw mill, adjust brake test function ok clean up area motor, rail continue test function motor move south-north-up and down result ok ( AGUS & FIRMAN & DADANG )
|
|
2025-05-21
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-WF1
|
Issue replace belt
|
Check sensor BD, test indication at CCR. Do calibration zero and span result ok ( RIZAL & MUHAIMIN & ANDRI )
|
|
2025-05-21
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-BF1
|
Modification temperature sensor for T1 and T2
|
Modification temperature T1 and T2. Replace temperature transmitter 2 each result indication temperature normal at CCR ( RIZAL & ANDRI & MUHAIMIN )
|
|
2025-05-21
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
Re check and tidy up lighting lamp 8th floor
|
Re check lighting lamp at pre heater 8th floor connect cable short at panel, test function result ok ( FIRMAN & DADANG )
|
|
2025-05-21
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
413-3B1-&-413-3B2-&-473-CC1
|
Cleaning up panel I/O area blending & cooler
|
Clean up I/O panel area blending-cooler-water spray kiln from dirty of dust use rag and hand blower ( JAJAT & ADI & EVE ANDRE )
|
|
2025-05-21
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-FN1
|
Support Auto Balancer ,install sensor
|
Support AUTO Balancer. Install sensor ( AGUS & FIRMAN & DADANG )
|
|
2025-05-20
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CCR
|
Pulling cable AC server room to CCR
|
Pulling cable power AC server room to CCR ( AGUS & FIRMAN & MUHAIMIN )
|
|
2025-05-20
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SCB
|
Connected cable power motor and test run
|
Do connected cable power motor and test run result ok ( AGUS & FIRMAN & MUHAIMIN )
|
|
2025-05-20
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SC6
|
Repaire propeller motion because broken
|
Repaire propeller motion at motor. Result ok ( AGUS & FIRMAN & MUHAIMIN )
|
|
2025-05-20
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
Activation Re-track probe
|
Do activation re-track for analyzer IKGA. Test re-track and insert probe result ok ( RIZAL & ADI & ANDRI & DADANG )
|
|
2025-05-20
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-IP1
|
Activation indication Low Temp CO2 liquid (DI- Pulling cable to Room Hydraulic)
|
Pulling cable digital input for indication low temperature heater CO2 liquid from control to I/O panel L63 HS1 continue connected cable white and brown. Test signal from heater control to I/O panel result ok blinking ( RIZAL & ADI & ANDRI & DADANG )
|
|
2025-05-20
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-FA2
|
Support Instalation motor and alignment
|
Do support alignment motor from CBM. Install AUTO grease motor. Measure data vibration 2 mm/s, noise 1 gE after alignment from CBM ( AGUS & FIRMAN & MUHAIMIN )
|
|
2025-05-20
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-FN1
|
Support Instalation Auto Balancer
|
Do support instalation AUTO Balancer, found existing AUTO Balancer is bad condition suspected because fire case when kiln just start up and motor 443 FN1 is not starting full, when existing AUTO Balancer bring to work shop and measure resistance 9.5 ohm ( AGUS & FIRMAN & MUHAIMIN )
|
|
2025-05-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Make data Kiln-RM-CM for shut down-off-PM 2025
|
Do make data for KILN-RM-CM shut down-idle-PM-off save at D: as Data Kiln-RM-CM shut down-idle-PM-off 2025 ( JAJAT, ADI )
|
|
2025-05-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Inspection electrical & welding tools of PT CIVACON
|
Inspection electrical and welding tools, tagging with green color ( ADI, DADANG )
|
|
2025-05-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-IP1
|
CO2 system install heater temperature
|
Measure distance cable for analog input and digital input from heater control to I/O pnel L63 HS1 needed cable 30 meter ( JAJAT, ADI )
|
|
2025-05-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-CC1
|
Cleaning Motor cooller Fan
|
Do cleaning motor area cooler from dirty of dust ( JAJAT, ADI, DADANG )
|
|
2025-05-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-FN1
|
Finishing area motor
|
Continue painting area TPM L63 FN1 ( DADANG )
|
|
2025-05-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Create Permit Replace Auto Balancer 443-FN1
|
Do create permit job replace AUTO Balancer ( ADI, EVE IQBAL )
|
|
2025-05-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-AC1
|
Issue there is jumper cable of roof switch
|
service stick of roof switch, remove jumper cable at I/O panel after normal condition ( RIZAL, ANDRI, EVE IQBAL )
|
|
2025-05-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-FA2
|
Observation data motor for base-frame-high shaft-diameter shaft
|
Do observation data base-frame-high shaft also diameter shaft, dismantle motor bring to work shop replace bearing motor 6217-C3 ( AGUS, FIRMAN, MUHAIMIN )
|
|
2025-05-16
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
413-3B1-&-3B2
|
Cross check level blending
|
Cross check indication level with production team compare with indication level at local result same ( RIZAL & ANDRI )
|
|
2025-05-16
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Observation Auto Balancer, Check coil winding
|
Do observation Auto Balancer. Check coil winding ( AGUS & FIRMAN & DADANG )
|
|
2025-05-16
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
TPM-L63-FN1 & L63 IP1
|
Completing data AM and data dash board and sign safety for CO2 systems.
|
Print out also laminating and install at dash board work shop for AM and for data TMP at dash board local and at tank of CO2 Systems for sign safety ( ADI & EVE IQBAL)
|
|
2025-05-16
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-FN1-&-L63-IP1
|
TPM area id CM and CO2 system
|
Clean up area motor use instrument air supply, also equipment cleaning for stair, plat form, cable tray. tank of CO2 system. Re painting yellow color for wall of foundation motor, grey for stair and iron around base foundation motor and fence of CO2 system ( JAJAT & AGUS & RIZAL & ADI & EVE IQBAL & FIRMAN & MUHAIMIN & ANDRI & AIMAN & DADANG )
|
|
2025-05-15
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-FA2
|
Issue high vibration and noise, add grease Mitigation WBI CBM Finding Add Greasing
|
Add grease motor 10 times-25 times & 30 times result not good still high vibration up 4 mm/s & noise up 2 gE ( MUHAIMIN & EVE IQBAL )
|
|
2025-05-15
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Completing check sheet PMR month of May
|
Completing data check sheet PMR analyser and PMR IR TAD-T scanner-CCTV-Camera Burner for 2nd weeks ( JAJAT & ADI )
|
|
2025-05-15
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Observation Auto Balancer
|
Do clean up AUTO Balancer at work shop ( AGUS & FIRMAN & MUHAIMIN )
|
|
2025-05-15
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR Service Analyser Coal Mill NAR1
|
Clean up flange, sample line, dryer gas pump, filter sample line, diaphragm pump, filter balston, humidity sensor from dirty of coal. Check filter humidity sensor result still ok no need replace filter ( RIZAL & ANDRI )
|
|
2025-05-15
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3-&-ER4-
|
PMR Clean Up MCC ER All Area Kiln Nar1
|
Clean up MCC ER3 & ER4, filter cabinet, also electric room top and bottom from dirty of dust use brush and vacuum cleaner ( AIMAN )
|
|
2025-05-15
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1-463-KL1-BURNER-FLOOR
|
PMR Service temperature IR TAD-CCTV-T scanner & pyrometer NAR1
|
Clean up lens of CCTV-IR TAD-T scanner-Camera burner from dirty of dust. Note value IR TAD show 946 degree celcius after clean up ( ADI & EVE IQBAL )
|
|
2025-05-15
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-LQ1-ROOM
|
Replace lighting lamp
|
Replace lighting lamp, test on result lamp on ( FIRMAN & DADANG )
|
|
2025-05-13
1 year ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
423-BF1-PDT-2001
|
Issue indication pressure low (1.4 mbar)
|
Cleaning Line ( east side Blocking), Done , result indication pressure 10,8 mbar ( AGUS & FIRMAN & MUHAIMIN & EVE IQBAL )
|
|
2025-05-14
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-L63-RM1
|
PMR Service Critical Motor & LSR RM & CM1
|
Clean up area motor and filter motor. Measure vibration-noise-temperature FS and LS. Add grease 15 times-20 times & 30 times for FS & LS. Write ampere and voltage motor at ER3 & ER4 for actual motor ( MUHAIMIN & EVE IQBAL )
|
|
2025-05-14
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-BL9-& 483 BL2 & L63 MD1
|
Mitigation WBI CBM Finding Add Greasing
|
Add grease around 10 times until 25 times until vibration below 4 mm/s motor issue high vibration ( MUHAIMIN & EVE IQBAL )
|
|
2025-05-14
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CCR
|
Finishing / Instalation support server rack mounts
|
Installing rack mount server at CCR ( DADANG & FIRMAN )
|
|
2025-05-14
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Observation Auto Balancer
|
Clean up AUTO Balancer at work shop (AGUS & FRIMAN )
|
|
2025-05-14
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Do Form /Calibration Speed /Critical Motor Cooller
|
Make form calibration speed and damper at work shop continue print out. Completing data check sheet form calibration speed and damper for year 2025 ( JAJAT & ADI )
|
|
2025-05-14
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-SR1.P2
|
Issue indication pressure low at CCR, Relocation pressure Transmiter (Replace Pressure Transmiter)
|
Replace pressure transmitter and relocation pressure transmitter result indication pressure normal at CCR ( RIZAL & ANDRI & EVE ANDRE )
|
|
2025-05-13
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-BF1.-T1-AND-T2
|
Cross Check temperature T1 & T2
|
Cross check indication temperature T1 & T2 compare with CCR reading result ok ( AGUS & FIRMAN & MUHAIMIN )
|
|
2025-05-13
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CCR
|
Observation support server rack mounts
|
Make support server rack mounts at work shop ( ANDRI & DADANG )
|
|
2025-05-13
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-&-473-CC1
|
PMR Service Crit Motor & LSR KL & Cooler
|
Clean area motor and filter motor. Measure vibration-noise-temperature FS and LS. Add grease 10 times for FS and LS and write data ampere-voltage actual motor at ER5 & ER4. Replace AUTO grease motor at 473 FA3 ( MUHAIMIN & ADI & EVE IQBAL )
|
|
2025-05-13
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-LQ1.T2
|
Issue value often error make raw mill off
|
Replace sensor temperature with spare unit becuase suspected original sensor temperature not long enough, result different temperature only 8 degree celcius ( AGUS & FIRMAN )
|
|
2025-05-13
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3
|
PMR Service Clean up MCC ER3 NAR1
|
Clean up MCC of ER3, filter cabinet also electric room top and bottom from dirty of dust use brush and vacuum cleaner ( AIMAN )
|
|
2025-05-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER5-&-ER6
|
PMR Clean Up MCC ER All Area Kiln Nar1
|
Clean up MCC ER 5 top also bottom floor & ER6, filter cabinet from dirty of dust use brush and vacuum cleaner ( AIMAN )
|
|
2025-05-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CCR
|
New Operator NAR 2 ( Install lamp Server , Install Power , dismantling Power +Install LAN)
|
Install lamp server and power of lamp server, dismantling power and installation LAN cable ( AGUS & FIRMAN & DADANG & MUHAIMIN & JAJAT & RIZAL & ADI & ANDRI & EVE IQBAL )
|
|
2025-05-09
1 year ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
463-2K1
|
Connect cable job final task EVE + Activation Emergency retract (simulation dan test)
|
Connect cable for final task and activation emergency retract ( do simulation and test result ok ) ( EVE RIQBAL & RIZAL & ANDRI )
|
|
2025-05-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Tidy Up data vs realisation ( API Audit)
|
Completing check sheet PMR and WBI for 2025 until May 2nd weeks, also take sign for every form. Replace data 423 2K1 PMR service because wrong form refill check sheet and take sign. Print out original form for PMR analyzer and WBI hoist crane ( JAJAT & ADI )
|
|
2025-05-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-AC2
|
Check indication R1
|
Do cross check signal R1 from local to CCR result ok ( MUHAIMIN )
|
|
2025-05-08
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CCR
|
New Operator NAR 2 secure cable + prepare connect cable power + LAN
|
Secure panel. pulling cable display, instalation power cable & prepare LAN 8 bundle at work shop do test result ok - standing monitor ( AGUS & FIRMAN & DADANG & MUHAIMIN & JAJAT & RIZAL & ADI & ANDRI )
|
|
2025-05-08
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
PT-PINCURAN-MAS
|
Inspection electrical tools
|
Do inspection electrical of PT PINCURAN MAS total 24 units tagging with green color
|
|
2025-05-08
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
Connect cable job final task EVE
|
Do connect cable for final task of final task EVE ( JAJAT & RIZAL )
|
|
2025-05-08
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-BF1
|
Air Regulator Bocor
|
Replace 3 membran with spare unit, clean up ohter membran. Test function result ok membran purging ( RIZAL & EVE IQBAL & ANDRI )
|
|
2025-05-08
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3-&-ER4-
|
PMR Clean Up MCC ER All Area Kiln Nar1
|
Clean up MCC ER 3 & ER4 top also bottom floor, filter cabinet from dirty of dust use brush and vacuum cleaner ( AIMAN )
|
|
2025-05-08
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR Service Analyser Coal Mill NAR1
|
Clean up sample line, filter sample line, balston filter, dryer gas pump, humidity sensor from dirty of coal.Check filter humidity sensor result ok ( ADI & MUHAIMIN )
|
|
2025-05-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
Pulling cable for final task + Re-program DCS
|
Pulling cable for final task and re-program DCS ( EVE IQBAL & JAJAT )
|
|
2025-05-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
BURNER-FLOOR-&-443-PH1
|
Do certification flow meter diesel at burner floor and pre heater
|
Do certification flow meter diesel at burner floor and pre heater ( RIZAL & ANDRI )
|
|
2025-05-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Tidy UP data PMR dan WBI All Area
|
Completing data check sheet for PMR analyzer L63 2K1-L63 2K2-L63 2K3-483 2K1-463 2K1-443 2K1-423 2K1 for month april & may 2025, PMR camera burner-t scanner-IR TAD-CCTV for month of may 2025, WBI top blending-CT-PH-kiln, bottom blending-kiln-cooler-clinker silo, feed bin-RM-bag filter-dust transport, CM-BC transport-truck lift-reclaimer coal for may & april 2025 ( JAJAT & ADI )
|
|
2025-05-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L3A-BC1
|
Repair sling switch sensor ML
|
Replace sling for switch sensor, do test sensor result ok ( MUHAIMIN & DADANG )
|
|
2025-05-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR Service Analyser
|
Clean up probe, flange, sample line, filter probe, diaphragm pump, filter balston, dryer gas pump, humidity sensor from dirty of dust. Check filter humidity sensor result ok ( MUHAIMIN & DADANG )
|
|
2025-05-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Observation FO cable way to WS NAR 1
|
Temporary activated LAN way ( AGUS & FIRMAN )
|
|
2025-05-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-CC1-&-443-PH1
|
Grounding antidote to evil spirits coal dozing N1 dan Preheater N1 value more than 5 ohm
|
Re-Check ,result still finish need root ( AGUS & FIRMAN & EVE IQBAL )
|
|
2025-05-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-PF1
|
Issue reading coal high at CCR compare from process
|
Adjust corection factor result reading coal ok ( RIZAL & MUHAIMIN & EVE IQBAL )
|
|
2025-05-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-CT1
|
Solenoid no 18 for water bakcward direction
|
Make good direction of solenoid valve for water. Test function from CCR result ok ( RIZAL & MUHAIMIN & EVE IQBAL )
|
|
2025-05-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
AREA-NR1
|
Certification antidote to evil spirits
|
Do Certification antidote to evil spirits ( AGUS )
|
|
2025-05-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Install box server and connect cable
|
Install box server at work shop also connect cable server ( FIRMAN & DADANG )
|
|
2025-05-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-&-473-CC1
|
PMR Service Crit Motor & LSR KL & Cooler
|
Clean up area motor and filter motor. Measure vibration-noise-temperature FS & LS. Add grease motor from 15 times-25 times-30 times FS & LS motor ( MUHAIMIN & EVE IQBAL )
|
|
2025-05-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR Service CEMS
|
Clean up filter purge unit motor & filter, swivel window T/R & R for dust hunter also flange with tube and alignment T/R & R, transducer A & B flowsic, CEMS room and bottle gas room from dirty of dust ( RIZAL & ANDRI )
|
|
2025-05-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Tidy up spare part di WS NAR1,also completing data motor survey energi bahaya Nr1
|
Tidy up spare part at work shop. Completing data motor survey energi bahaya for area blending top & bottom-pre heater-coal mill-cooler-clinker silo-truck lift & reclaimer motor base on data WBI at that area ( JAJAT & ADI )
|
|
2025-05-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Tidy Up, Spare Part di WS NAR1,also completing data motor survey energi bahaya Nr1
|
Tidy up spare part at work shop. Completing data motor survey energi bahaya for area feedbin-raw mill-bag filter. Data motor base on WBI at that area ( JAJAT & ADI )
|
|
2025-05-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
BURNER-FLOOR
|
483-BU1 Replace ELCB Welding Burner
|
Replace ELCB welding at burner floor ( FIRMAN & DADANG )
|
|
2025-05-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-L63-RM1
|
PMR Service Critical Motor & LSR RM&CM1
|
Clean up area motor and filter motor. Measure vibration-noise-temperature FS & LS. Add grease motor from 15 times-25 times-30 times FS & LS motor ( MUHAIMIN )
|
|
2025-05-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
NAROGONG-1
|
Certification antidote to evil spirits
|
Do certification antidote to evil spirits ( AGUS )
|
|
2025-05-02
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
Install bright lamp
|
Install bright lamp at stair of CT, test on ok ( FIRMAN & DADANG )
|
|
2025-05-02
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
Inspection electric and welding tools of PT Truba Jaga Cita
|
Inspection electric and welding tools of PT Truba Jaga Cita ( Firman )
|
|
2025-05-02
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-FA7
|
Install cover give for AS motor become room air sirculation
|
Install cover give for AS as room sirculation for air ( FIRMAN & DADANG )
|
|
2025-05-02
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SCA
|
Continue install lamp
|
Install bright lamp, test on result ok ( FIRMAN & MUHAIMIN & DADANG )
|
|
2025-05-02
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
BURNER-FLOOR
|
Replace drain air tank
|
Replace drain for air tank at burner ( RIZAL & ANDRI )
|
|
2025-05-02
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3-&-ER4-
|
Clean up MCC area
|
Clean up ER 3 & ER 4 top also bottom and MCC panel also filter cabinet from dirty of dust use brush and vacuum cleaner ( IMAN )
|
|
2025-05-02
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Completing check sheet WBI Elect & Ins & Check I/O CM,Sump T&T. make notification abnormal finding
|
Completing file check sheet WBI Elect & Ins & Check I/O CM,Sump T&T also make notification for abnormal finding for vibration & noise motor
|
|
2025-05-02
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
Trouble shooting O2 high
|
Trouble shooting for reading O2 high result ok ( RIZAL & EVE IQBAL & ANDRI )
|
|
2025-05-02
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-CT1
|
Replace solenoid valve no 18
|
Replace solenoid valve no 18 result ok ( MUHAIMIN & EVE IQBAL )
|
|
2025-04-29
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-FN1
|
Observation failure AUTO BALANCER
|
Pulling cable from MCC ER4 to local, do connection. Result ok ( RIZAL & JAJAT & ANDRI )
|
|
2025-04-29
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR service CEMS
|
Clean up area CEMS room and bottle gas room from dirty of dust use brush. Check value of CEMS analyser reading result ok specially for MCS 100 E reading temperature heater result ok . Completing data check sheet 423 2K1 ( ADI & EVE IQBAL )
|
|
2025-04-28
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Completing data TPM 443 EL1
|
Do completing data TPM 443 EL1, print out and put at dash board TPM ( EVE IQBAL )
|
|
2025-04-28
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-FN1
|
Check cable AUTO BALANCER reference to normal test to NR2
|
Check cable AUTO balancer reference to normal test to Nr2 result ok ( AGUS & FIRMAN & DADANG )
|
|
2025-04-28
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
CEMS NAR1 Trouble Shooting
|
Replace heater control, trafo CEMS. Pulling cable from MCC to trafo also from output trafo to CEMS room. Conect cable at CEMS room, trafo and MCC. Test on result ok ( RIZAL & ADI & MUHAIMIN & AGUS & JAJAT & EVE IQBAL & FIRMAN & ANDRI & DADANG )
|
|
2025-04-28
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
-463-KL1-&-473-CC1
|
PMR Service Critical Motor & LSR RM&CM1
|
Clean up area motor and filter motor. Measure vibration-noise-temperature FS and LS motor. Add grease 15 times-20 times and 30 times for FS and LS motor ( MUHAIMIN & EVE IQBAL )
|
|
2025-04-25
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-BE1
|
Check/Replace sensor Turbo Coupling
|
Do check sensor turbo coupling, found oil leakage ( AGUS & MUHAIMIN )
|
|
2025-04-25
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-FN1
|
Test Auto Balancer
|
Do test AUTO balancer result ok ( JAJAT & RIZAL & ANDRI )
|
|
2025-04-25
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-LQ1-T2-&-T3
|
Tidy up cable temperature sensor
|
Tidy up cable temperature sensor T2 & T3 ( RIZAL & ANDRI & ADI )
|
|
2025-04-25
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1
|
Fabrication transfer hot air motor from man drive
|
Fabrication transfer hot air motor from main drive ( FIRMAN & DADANG )
|
|
2025-04-25
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-FN1
|
Replace Cell Robicon
|
Replace cell robicon ( AGUS & FIRMAN & AIMAN )
|
|
2025-04-25
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
BOTTOM-BLENDING-KILN-COOLER-CLINKER-SILO
|
WBI Elec & Ins & Check I/O & S Pump Bl,C
|
Do WBI Elec & Ins & Check I/O & S Pump Bl,C, measure vibration-noise -temperature write abnormal condition at file ( ADI & EVE IQBAL )
|
|
2025-04-24
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
413-BF3
|
Issue leakage at membran
|
Check found membran bad condtion replace membran 5 each. Test run result ok no leakage ( RIZAL & ANDRI )
|
|
2025-04-24
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-BF1
|
Check indication ML issue abnormal
|
Simulation sensor ML at local and check indication at CCR. Clean up sensor ML test simulation result ok ( RIZAL & EVE IQBAL & ANDRI )
|
|
2025-04-24
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1
|
Observation or fabrication for transfer hot air from main drive
|
Fabrication for transfer hot air from main drive to reduce high temperature winding. Install at local, observation reading temperature winding motor ( FIRMAN & DADANG )
|
|
2025-04-24
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-L63-RM1-&-463-KL1-&-473-CC1
|
PMR Critical Motor Kiln/RM
|
PMR critical motor Kiln and RM. Clean up area motor and filter motor. Measure vibration-noise-temperature add grease from 15 times, 25 times and 30 times fore FS and LS ( AGUS & MUHAIMIN )
|
|
2025-04-24
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-2K2
|
Repare Analizer
|
Replace key pard analyzer and sensor O2. Test calibration zero and span O2 result ok ( RIZAL & ANDRI & EVE IQBAL )
|
|
2025-04-24
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-FN1
|
AUTOABALANCER; 1 cable coil any indication short to ground, 2. Cable sensor at fix side abnormal speed value13000 RPM
|
On AUTOBALANCER replace breaker because when try to On trip. Test on AUTOBALANCER result ok ( RIZAL & EVE IQBAL & ANDRI )
|
|
2025-04-24
1 year ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
ER3-&-ER4-&-L63-RM1-&-BURNER-FLOOR
|
PMR Clean Up MCC ER All Area Kiln Nar1 + Cleaning Lamp area CM -Burner
|
PMR Clean Up MCC ER 3 top and bottom and ER6, clean up filter panel and MCC; and room electrical room from dirty of dust with brush and vacuum cleaner result ok + Cleaning Lamp area CM -Burner use equipment cleaning tools result ok ( AIMAN )
|
|
2025-04-24
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1-423-EP1-463-KL1
|
WBI Elec & Ins & Check I/O GCT, EP,PH&KL
|
WBI Elec & Ins & Check I/O GCT, EP,PH&KL. Clean area motor, measure vibration, noise and temperature free and load side. Write at file inspection for all data
|
|
2025-04-24
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Scan check sheet analyser month march 25 and april 25
|
Scan all check sheet analyser month march 25 and april 25 send by email to Mr.Jajat
|
|
2025-04-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1
|
Fabrication or install blower
|
Fabrication blower at work shop and install at local. Test run result ok ( FIRMAN & DADANG )
|
|
2025-04-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-BV3
|
Issue position manual but when AUTO show zero
|
Service L63 BV3, test from CCR result ok ( RIZAL & EVE IQBAL & ANDRI )
|
|
2025-04-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1
|
Cross check value for temperature-ampere-KW
|
Cross check value for Temp-Amp-KW compare from local and CCR result ok ( AGUS & MUHAIMIN )
|
|
2025-04-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
PMR-&-WBI-MOTN-MARCH-TO-APRIL-2025
|
Completing data PMR and WBI month March to April 2025
|
Completing data check sheet for PMR analyzer L63 2K1-L63 2K2-L63 2K3-483 2K1-463 2K1-443 2K1-423 2K1; PMR critical motor RM-CM-KILN-COOLER; WBI Top Blending-CT-PH-KILN; WBI Feed Bin-RM-CT-Dust Transport-BF for month March until April 2025 ( ADI & EVE IQBAL )
|
|
2025-04-21
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-FN1
|
Replace vibration sensor issue burned
|
Replace vibration sensor AUTOBALANCER with spare result ok ( RIZAL & MUHAIMIN & DADANG & ANDRI & JAJAT )
|
|
2025-04-21
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
Issue can not AUTO
|
Make analyzer AUTO result ok ( RIZAL & ANDRI )
|
|
2025-04-21
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FA2-P1
|
Cross check issue indication at CCR to big compare local
|
Adjust indication with zero adjust result ok ( RIZAL & ANDRI )
|
|
2025-04-21
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1-&-463-KL1-&-L33-BC2-&-BURNER-FLOOR
|
PMR CCTV, IR TAD, Kiln Scanner, Camera burner
|
Clean lens CCTV-IR TAD-Kiln Scanner from dirty of dust. Clean up panel of oil and water trap and panel control camera burner from dirty of oil and dust also panel instrument air out side from dirty of dust use hand blower and cloth ( ADI & EVE IQBAL )
|
|
2025-04-17
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-WI1-V1
|
Issue leakage at solenoid valve
|
Replace tubing copper tubing-connector tubing, also S/V test run result ok ( RIZAL & EVE IQBAL & JAJAT & ANDRI )
|
|
2025-04-17
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-FN1
|
Support test AUTO BALANCER
|
Support test AUTO BALANCER ( JAJAT & RIZAL & EVE IQBAL & ANDRI )
|
|
2025-04-17
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG
|
Install plat form for HRG or WTP and commisioning HRG
|
Install plat form HRG or WTO and commisioning HRG ( RIZAL & JAJAT & EVE IQBAL & ANDRI )
|
|
2025-04-17
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-EL1
|
Support PT LOUSER instalation wire rope
|
Support PT LOUSER instalation wire rope ( AGUS & FIRMAN )
|
|
2025-04-17
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-FN2,-FN3,-FN4-
|
Test signal S
|
Test signal S for 493 FN3 & FN4, replace contactor emergency stop test run signal S result ok ( ADI & MUHAIMIN & DADANG )
|
|
2025-04-17
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-AC2-&-AC4-R1
|
Roof switch R1 signal S and G top position often blinking
|
Test signal roof switch R1 at 493 AC2 & AC4, clean up area sensor add WD 40 for stick test run result ok Test signal S for 493 AC2, AC3 and AC4 result ok ( MUHAIMIN & ADI & DADANG )
|
|
2025-04-16
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CCR
|
Relocation new operator KILN1 and FM1
|
Relocation new operator for cable VEGA-power supply monitor-LAN. Test on monitor result ok ( JAJAT & AGUS & MUHAIMIN & ADI & DADANG )
|
|
2025-04-16
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1
|
Support GEAR BOX instalation and finisshing instalation 363 MD!
|
Do support gear box instalation and finishing instalation 363 MD1 ( AGUS & FIRMAN & DADANG )
|
|
2025-04-16
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
333-EH1
|
Rewiring control hoist feed bin
|
Rewiring control hoist belt feed 333 EH1 ( FIRMAN & EVE IQBAL )
|
|
2025-04-16
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-FN1
|
Check cable vibration and sensor vibration
|
Check cable for vibration AUTOBALANCER, repare separated cable result ok. Check vibration sensor at AUTOBALANCER ( RIZAL & ADI & ANDRI )
|
|
2025-04-16
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG-
|
Install plat form for HRG or WTP
|
Install plat form HRG or WTP ( RIZAL & ANDRI & ADI )
|
|
2025-04-15
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1
|
Temperature winding T5 & T6 are error
|
Repare connection result value back to normal ( AGUS & MUHAIMIN )
|
|
2025-04-15
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-AS2
|
Welding point is burned
|
Replace cable welding that are burned with spare cable ( FIRMAN & DADANG )
|
|
2025-04-15
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SGC-&-393-SGB
|
Relocation proximity
|
Relocation proximity ( ANDRI & EVE IQBAL )
|
|
2025-04-15
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-CC1-&-GLASS-INSPECTION-COMPARTEMENT-
|
Light lamp at cooler are off and glass inspection are not clear
|
Clean up area inspection grate cooler from dirty of dust, replace 1 limit switch because bad condition also install 1 stick limit switch. Test on lamp result ok from compartemen 1 to 7 ( JAJAT & ADI & ANDRI & DADANG )
|
|
2025-04-15
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1
|
Pulling cable and instalation support cable temperature bearing motor 6P x 0.75mm around 30 meter
|
Pulling cable for bearing temperature motor from locat to panel I/O also do connection cable at local and panel I/O ( AGUS & JAJAT & MUHAIMIN & ADI & DADANG )
|
|
2025-04-14
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1
|
Rewiring control VCS
|
Rewiring control VCS ( AGUS & MUHAIMIN )
|
|
2025-04-14
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-BC1
|
Connect cable power
|
Connect cable motor ( FIRMAN & DADANG )
|
|
2025-04-14
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-HE1
|
Repare hoise Raw Mill
|
Repare hoist of raw mill ( FIRMAN & DADANG )
|
|
2025-04-14
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG
|
Disconnect pipe for Hydraugent & O2
|
Do disconnect pipe for H2 & O2 ( RIZAL & ANDRI )
|
|
2025-04-14
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-BL7-&-483-BL9
|
Check function of EASY LUB
|
Re-fill grease test result ok ( RIZAL & ANDRI )
|
|
2025-04-14
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-L63-RM1
|
PMR Service Critical Motor & LSR RM & CM1 make sure heater function
|
Make sure heater function result ok ( FIRMAN & DADANG )
|
|
2025-04-14
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG
|
Modification control pump clorine
|
Do modification control pump of clorine at HRG, also add silicone for outside BLUEBOX panel ( JAJAT & ADI )
|
|
2025-04-11
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CLEANING-LCS-PANEL-ALL-AREA-TYRE-KILN-&-473-CC1
|
LCS outside very dirtyof dust
|
Cleaning LCS panel area Tyre Kiln and 473 CC1 use putty knife, soft brush, rag, vector from dirty of dust ( JAJAT & ADI & IMAN )
|
|
2025-04-10
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1
|
Rewiring control VCS
|
Do rewiring control VCS ( AGUS & MUHAIMIN )
|
|
2025-04-10
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG
|
Install HRG Capasitor + Observation Condensate
|
Replace new one (6 EA) ( FIRMAN & DADANG )
|
|
2025-04-10
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
453-PF1-&-483-PF1
|
Cleaning, test LC, oil drum
|
Cleaning oil drum 453 PF1 also add oil omala 300 adjust gap. Test LC found 1 bad condition. Replace LC test load from person weight 6 person. Re test 483 PF1 because CF original 5 change to 0 after load use ( RIZAL & ANDRI & ADI )
|
|
2025-04-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-AC1
|
Service roof for SW
|
Service roof for SW result ok ( FIRMAN & DADANG )
|
|
2025-04-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FA2
|
Reverse rotation and install cover bar
|
Make swap cable power motor test run result ok. Install cover for bar ( FIRMAN & DADANG )
|
|
2025-04-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-MD1-&-473-FN7
|
Motor position to ware house for repairing
|
Send motor to ware house for repairing ( FIRMAN & DADANG )
|
|
2025-04-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-PF1-SG8
|
Solenoid abnormal
|
Do test solenoid valve function result 1 no good condition. Replace S/V with spare test run result ok ( RIZAL & ANDRI & ADI )
|
|
2025-04-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-PF1
|
Cleaning, test LC, oil drum
|
Cleaning area Pfister Feeder from dust coal with instrument air, take oil drum OMALA 300 bring to local clean up cap of oil drum check condition oil still ok. Do adjusment gap also add oil result ok. Test load cell response with test weight result ok ( RIZAL & ANDRI & ADI )
|
|
2025-04-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-PF1
|
Issue value ampere fluctuation
|
Found polarity cable tacho backward. Make good connection polarity cable also tighten cable at motor do test run motor after install v-belt result ok. Test pfister feeder with load and no load result ok ( RIZAL & ADI & ANDRI )
|
|
2025-03-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
V93-EH1
|
LCS damaged
|
Replace LCS, Done ( DADANG & RADIFAN )
|
|
2025-03-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-SG5
|
Issue abnomarly function ( can not operated from CCR )
|
Service sensor, reposition tube. Test from DCS result ok ( RIZAL & ANDRI )
|
|
2025-03-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-FA2
|
Install motor and base plate
|
Repainting base plate with black color. Prepare nut for motor, install motor ( MUHAIMIN & FIRMAN & AGUS & ADI & DADANG )
|
|
2025-03-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-BF1
|
Issue some membran abnormal
|
Replace membran for bag filter test on result ok ( RIZAL & MUHAIMIN & ANDRI )
|
|
2025-03-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
Dismalting All sensor Gear Box RM NAR 1
|
Dismantling all sensor gear box 363 RM NR1 ( RIZAL & ANDRI )
|
|
2025-03-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1-M2
|
Install Motor +Fabrication Filter Housing + (commisioning)
|
Install Motor +Fabrication Filter Housing + (commisioning) ( AGUS & FIRMAN & MUHAIMIN & DADANG )
|
|
2025-03-26
1 year ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR service analyzer
|
Clean up probe, flange, filter probe, sample line, diapghragm pump, filter balston, dryer gas pump from dirty of dust. Check humidity sensor result ok ( RIZAL & ANDRI )
|
|
2025-03-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1,-423-BF1,-443-CT1,FEED-BIN
|
WBI electrical & instrumentation panel I/O feed bin; Heater motor damaged
|
Found 1 heater motor off 1 unit replace heater motor at 363 FN2 with spare lamp test on result ok
|
|
2025-03-11
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
Lighting off at Top bucket 393 BE1; 433 BF2; 433 RF2
|
Replace lighting at preheater. Test on result ok ( AGUS & MUHAIMIN & FIRMAN & DADANG )
|
|
2025-03-11
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
MAIN-GATE-ACCES-CONTROL
|
Check inspection tools of PT INDOPORLEN
|
Check inspection electrical tools of PT INDOPORLEN total 13 unit tagging red color ( ADI & EVE IQBAL )
|
|
2025-03-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-AC3
|
Check motor connection or observation
|
Issue Speed Monitor (Motor can't move). Take picture data motor send to Mr.Jajat ( ADI & MUHAIMIN & DADANG )
|
|
2025-03-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FN7
|
Test run and install seding motor
|
Test PDMA. Install cover room of motor. Wait mechanic couple coupling( AGUS & FIRMAN & ANDRI )
|
|
2025-03-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-LD1
|
Issue motor heavy for open and close
|
Discouple load from motor test 0% to 100% result ok. Issue mechanical load to heavy for move open and close order to mechanic servicing gate ( JAJAT & RIZAL & ADI & MUHAIMIN & DADANG )
|
|
2025-03-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-FN2-FN3-FN4-FN5-RF1
|
Finding push button stop to DCS abnormal
|
Replace contact PB stop at FN4 & FN3 test measure resistance result not ok but for FN2 & FN5 test measure resistance result ok also for RF1 result ok ( MUHAIMIN & ADI & JAJAT & RIZAL & DADANG )
|
|
2025-03-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-2K1
|
Sample line not enough 4 meter due flange probe move to north side
|
Add sample line 4 meter at flange probe ( RIZAL & EVE RAMADAN )
|
|
2025-03-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FA2.C1
|
Replace module soft stater
|
Replace module soft stater ( RIZAL & MUHAIMIN & ADI & DADANG )
|
|
2025-03-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
333-WF1-UNTIL-333-WF4
|
Observation for calibration zero and span
|
Do calibration zero and span ( RIZAL & ANDRI )
|
|
2025-03-04
1 year ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
L63-RM1
|
WBI Elect & Ins & Check I/O CM,Sump T&T
|
WBI elec & ins also check I/O CM, sump T&T ( ADI & EVE IQBAL )
|
|
2025-03-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FA2
|
Disconnect motor and acceories
|
Disconnect motor, dismantling v-belt and base plate. Issue will rewinding motor because spare motor have difference frame almost 4 cm ( MUHAIMIN & EVE RAMADAN & DADANG )
|
|
2025-03-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FN7
|
Connect motor and accecories
|
Connect cable motor and accecories ( AGUS & FIRMAN & DADANG )
|
|
2025-03-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-FN3
|
Test run and install V-belt
|
Install V-belt and do test run result ok ( MUHAIMIN & DADANG & EVE RAMADAN )
|
|
2025-03-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR service analyzer
|
Clean up flange, sample line, filter probe, dryer gas pump, diaphragm pump. filter balston from dirty of coal. Check humidity sensor replace filter humidity at L63 2K1 & L63 2K3 ( ADI & EVE IQBAL )
|
|
2025-03-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-SR1
|
Connect cable power
|
Connect cable power ( MUHAIMIN & DADANG)
|
|
2025-03-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-BV3
|
Observation instalation for back actuator
|
Do observation install back actuator ( FIRMAN & DADANG )
|
|
2025-03-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
TENT-OH
|
Dismalting Lamp Tend + Accecories RMK NAR 1 Area
|
Dismantling lamp of tent and accecories bring to work shop ( All crew electric Nr1 )
|
|
2025-03-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-&-473-CC1
|
PMR Service Crit Motor & LSR KL & Cooler
|
Clean area motor and filter motor. Measure vibration, noise and temperature free and load side motor. Add grease for 30 times for free and load side motor ( AGUS )
|
|
2025-03-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Completing data PMR and WBI month January & March 2025
|
Completing data check sheet PMR analyzer IKGA-PH-CEMS & CM, PMR service critical motor RM-KILN-CC-CM, PMR IR TAD-T Scanner-CCTV-Pyrometer, WBI TOP & Bottom Blending-CT=PH-KILN-Cooler-Clinker SIlo month January & March 2025 ( ADI )
|
|
2025-03-04
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-FA6
|
Continue finding abnormaly
|
Check abnormaly at motor. Result ok ( RIZAL & MUHAIMIN & EVE RAMADAN & ANDRI )
|
|
2025-03-04
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
433-SG8
|
Connect limit switch
|
Connected limit switch ( RIZAL & EVE RAMADHAN & ANDRI )
|
|
2025-03-04
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FN7
|
Prepare replace motor
|
Preparing for replace motor ( AGUS & FIRMA & DADANG & EVE FAJAR )
|
|
2025-03-04
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR service analyzer
|
Clean up area probe, filter probe, sample line, filter balston, dryer gas, diaphragm pump from dirty of dust ( ADI & EVE IQBAL )
|
|
2025-03-03
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
E1-COMMISSIONING-ALL-AREA
|
COMMISSIONING-ALL AREA
|
Do re commissioning all area result ok ( ALL Crew Electric )
|
|
2025-03-03
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-FA6-&-393-FA7
|
Issue hot surface motor of FA6 and wrong round motor of FA7
|
Move cable power at 393 FA7 result round motor ok but found 1 instrument air tank at output leakage so decided not use any more for tank SMC adjust output for air result ok . 393 FA6 dismantle motor test on no load result ok ( RIZAL & MUHAIMIN & ANDRI )
|
|
2025-03-03
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
383-MD1-M1
|
Clean up motor
|
Clean up area motor ( FIRMAN & DADANG )
|
|
2025-03-03
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-L63-RM1
|
PMR Service Critical Motor & LSR RM&CM1
|
Clean area motor. Measure vibration, noise and temperature free and load side motor. Add grease for 10 times for free and load side motor ( AGUS & MUHAIMIN )
|
|
2025-03-03
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L3A-BC1-&-473-FA1-TO-473-FAA
|
Issue oil seeping from motor and take out battery for AUTO grease
|
Check actual there is seeping oil from motor. Clean up body motor. Found 1 tank AUTO grease 473 FA4 low level replace with full level. Take out all battery of AUTO grease ( MUHAIMIN & ADI )
|
|
2025-02-28
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1-&-WORK-SHOP
|
Make name addressing panel I/O area preheater also clean up panel I/O 3C1-2RB-72. Write data 463 MD1
|
Install name addressing panel I/O at 3rd and 8th floor. Clean up panel I/O 3C1-2RB-72 from dust. Completing data 463 MD1 for clean up carbon brush room and measure long carbon brush ( ADI )
|
|
2025-02-27
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
313-3B1;-313-3B2;-363-RM1;-333-AC1;-333-WF
|
Install sign WARNING panel I/O and name addressing panel I/O area 493 AC1-313 3B2-443 PH1
|
Install sign WARNING front of panel I/O area area west and east blending also area 363 RM1-333 WF1 and 333 AC. Put name addressing panel I/O area preheater & west blending ( ADI & TRUBA SUTRI & TRUBA HERU )
|
|
2025-02-26
1 year ago
|
NR.N1-OH
|
Wahyu Adi Triono
|
443-PH1
|
Sign WARNING at panel I/O pre heater
|
Installing sign WARNING at panel I/O area pre heater also put name addressing panel I/O area preheater ( ADI & EVE PUTRI & TRUBA SUTRI )
|
|
2025-02-24
1 year ago
|
NR.N1-OH
|
Wahyu Adi Triono
|
443-PH1-AND-MAIN-GATE-ACCESS-CONTROL
|
Clean up panel I/O area pre heater and inspection electrical tools of PT QUADRO
|
Clean up panel I/O area pre heater found some panel I/O there are no sign WARNING take sign warning at safety officer 10 units. Inspection electrical tools of PT QUADRO total 5 units ( ADI & TRUBA SUTRI & EVE PUTRI )
|
|
2025-02-21
1 year ago
|
NR.N1-OH
|
Wahyu Adi Triono
|
ER3-&-ER4
|
Blackout power and manuver power
|
Clean up 2 unit trafo and top panel also clean up top panel all panel electric room. Megger output cable VCB write result at form. Clean up area electric rom from dust. Megger new instalation input DS result ok ( PENY-MUHAIMIN-ADI)
|
|
2025-02-19
1 year ago
|
NR.N1-OH
|
Wahyu Adi Triono
|
443-PH1
|
Inspection welding tools of PT TRUBA JAGA CITA because welding cable is not safe due open
|
Covering open welding cable with red insulation and put wood for welding cable from site to welding machine because many water ( ADI & TRUBA SUTRI )
|
|
2025-02-19
1 year ago
|
NR.N1-OH
|
Wahyu Adi Triono
|
MAIN-GATE-ACCES-CONTROL
|
Inspection electrical & welding tools of PT QUADRO-PT JANTAN SETIA SAKTI & PT KAD
|
Inspection electrical & welding tools of PT QUADRO totals 5 units of electrical tools-PT JANTAN SETIA SAKTI totals 3 units of electrical also 1 unit of welding & PT KAD totals 2 units of electrical tools ( ADI & TRUBA HERU & TRUBA SUTRI )
|
|
2025-02-18
1 year ago
|
NR.N1-OH
|
Wahyu Adi Triono
|
MAIN-GATE-ACCES-CONTROL
|
Inspection electrical tools of PT INDO BARA
|
Inspection electrical tools of PT INDO BARA, note 1 extention cable is full fell standard of SBI because cable only 2 core ( ADI & TRUBA HERU & TRUBA SUTRI )
|
|
2025-02-17
1 year ago
|
NR.N1-OH
|
Wahyu Adi Triono
|
MAIN-GATE-ACCES-CONTROL
|
Inspection electrical & welding tools of PT Indo Bara & PT Quadro
|
Inspection electrical & welding tools of PT Indo Bara & PT Quadro ( ADI & TRUBA HERU & TRUBA SUTRI )
|
|
2025-02-14
1 year ago
|
NR.N1-OH
|
Wahyu Adi Triono
|
MAIN-GATE-ACCES-CONTROL
|
Inspection electrical & welding tools of PT BOVERI INDONESIA & PT TRUBA JAGA CITA
|
Inspection electrical & welding tools of PT BOVERI INDONESIA totals 1 unit equipment electrical tools & PT TRUBA JAGA CITA total 8 unit electrical tools
|
|
2025-02-13
1 year ago
|
NR.N1-OH
|
Wahyu Adi Triono
|
MAIN-GATE-ACCES-CONTROL
|
Inspection electrical and welding tools of PT BOVERI INDONESIA & PT TRUBA JAGA CITA
|
Inspection electrical and welding tools of PT BOVERI INDONESIA total equipment electrical tools 14 unit & PT TRUBA JAGA CITA welding tools 8 unit tagging red color ( ADI & TRUBA HERU )
|
|
2025-02-12
1 year ago
|
NR.N1-OH
|
Wahyu Adi Triono
|
MAIN-GATE-ACCES-CONTROL
|
Inspection electrical tools of PT SUPRA
|
Inspection electrical tools of PT SUPRA total 1 equipment for grinding machine tagging red color ( ADI & TRUBA HERU )
|
|
2025-02-11
1 year ago
|
NR.N1-OH
|
Wahyu Adi Triono
|
MAIN-GATE-ACCES-CONTROL
|
Inspection electrical tools of PT TRUBA JAGA CITA
|
Inspection electrical tools of PT TRUBA JAGA CITA totals 1 unit ( ADI & TRUBA SUTRI & TRUBA HERU )
|
|
2025-02-10
1 year ago
|
NR.N1-OH
|
Wahyu Adi Triono
|
MAIN-GATE-ACCES-CONTROL
|
Inspection electrical & welding tools of PT INDOPORLEN-PT CIVACON-PT TRUBA JAGA CITA-PT TOTAL PRIME ENGINEERING
|
Inspection electrical & welding tools of PT INDOPORLEN-PT CIVACON for electrical tools totals 16 unit welding tools 4 unit cable welding + and cable welding - 4 unit-PT TRUBA JAGA CITA totals 10 unit welding tools, PT TOTAL PRIME ENGINEERING totals totals electrical 2 unit ( ADI & TRUBA HERU & TRUBA SUTRI )
|
|
2025-02-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-CC1
|
Check equipment and electric support ( BROOK, CABLE )
|
Equipment 2 Eah (brook) acceptabe to operate 1 eah still repare, a few cable not acceptable (Rejected) ( FIRMAN & AGUS & RIZAL )
|
|
2025-02-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
MAIN-GATE-ACCES-CONTROL
|
Inspection electrical and welding tools of PT MBL & PT SHINAGAWA
|
Inspection electrical and welding tools: PT MBL totals 46 equipment tagging red color, PT Shinagawa totals 6 equipment tagging red color ( MUHAIMIN & ADI & TRUBA HERU )
|
|
2025-02-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
BURNER-FLOOR
|
Replace breaker 100 A to 125 A
|
Replacing breaker to 125 A ( AGUS & FIRMAN )
|
|
2025-02-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-PU1
|
Continue fabrication box and control, install module CCR, pulling cable MCC (final check )
|
Test Signal , Test Running , test fungtion SP/PV of drive interlock ( AGUS & JAJAT )
|
|
2025-02-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-CC1
|
Repare or modified breaker brook
|
Repare breaker for Brook ( FIRMAn & DADANG )
|
|
2025-02-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
TOILET-&-TENT-OH
|
Install lamp and connector tent also toilet also support electric connection
|
Install lamp and connector for tent also toilet also support electric connection ( AGUS & RIZAL & AIMAN & FIRMAN & ANDRI & DADANG & JAJAT )
|
|
2025-02-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
MAIN-GATE-ACCES-CONTROL
|
Inspection electrical & welding tools of PT INDOPORLEN-PT TRUBA JAGA CITA-PT SHINAGAWA
|
Inspection electrical and welding tools: PT Truba Jaga Cita: 5 welding tools, PT Shinagawa totals 45, PT Indoporlen totals 30 tools ( ADI & ANDRI & AIMAN )
|
|
2025-02-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-HOIST-CRANE
|
Check hoist crane
|
Check hoist crane raw mill ( FIRMAN & ANDRI )
|
|
2025-02-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-CC1
|
Check brook at cooler
|
Check brook at cooler ( AGUS & DADANG )
|
|
2025-02-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-PU1
|
Continue fabrication box and control, install module CCR, pulling cable MCC
|
Pulling cable MCC at ER3 ( AGUS & FIRMAN & ANDRI )
|
|
2025-02-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
Issue winci 8th sag when take of load
|
Check brake of winci test ok ( AGUS & DADANG )
|
|
2025-02-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
TOILET-&-TENT-OH
|
Observation bright lamp for toile & tent OH
|
Install bright lamp for tent and toilet OH ( RIZAL & FIRMAN & ANDRI & DADANG & AIMAN )
|
|
2025-02-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Prepare lamp 5 each for OH
|
Make 5 set lamp for OH ( MUHAIMIN & ADI )
|
|
2025-02-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-RF2
|
Issue from production ask activated empty bin
|
Pulling cable, inject power for proses empty bin ( JAJAT & RIZAL & DADANG )
|
|
2025-02-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-PU1
|
Fabrication panel and control. Install module CCR and pulling cable MCC
|
Pulling Back /Pulling new kabel power kontrol dan kontrol to IO N-31-4 , Modul control DCS sudah dibuat, Addresing done ( AGUS & FIRMAN & AIMAN & EVE PUTRI & EVE FARHANSYAH & JAJAT )
|
|
2025-02-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
SUPRA
|
Inspection electrical and welding machine of SUPRA
|
Inspection electrical tools of SUPRA tagging red color ( RIZAL & DADANG )
|
|
2025-02-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
PINCURAN-MAS-&-JANTAN-SETIA-SAKTI
|
Inspection electrical and welding machine of Pincuran Mas & Jantan Setia Sakti
|
Inspection electrical tools of Pincuran Mas 13 tools tagging red color. Inspection electrical & welding tools of PT JANTAN SETIA SAKTI total welding 8 each & electrical 27 each all tagging red color ( ADI & MUHAIMIN )
|
|
2025-02-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-PU1
|
Fabrication panel and control continue install MCC, pulling cable
|
Pulling cable MCC. Install MCR at ER3. Make labelling cable control ( AGUS & FIRMAN & DADANG )
|
|
2025-02-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
453-PF1-&-483-PF1
|
Elimination pfister feeder such as wrapping, disconnect, lock mechanical force
|
Do eliminationpfister feeder also wraping, disconnect , lock mechanical force ( RIZAL EVE PUTRI + EVE FARHANSYAH, JAJAT )
|
|
2025-02-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Cleaning facility car
|
Clean up facility car ( AIMAN )
|
|
2025-02-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Prepare permit OH every location and arrange people OH
|
Arrange people for OH. Make permit job for OH every location such as Feed bin - RM; PH-Kiln-CT-Blending; CM-Cooler-Burner Floor-Clinker Silo (RIZAL & JAJAT & EVE PUTRI & EVE FARHANSYAH )
|
|
2025-02-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
TRUBA-JAGA-CITA;-PINCURAN-MAS
|
Inspection electrical and welding machine
|
Inspection electrical and welding machine . Note for winci machine belong PT TUBA JAGA CITA must replace emergency stop because is not holding when on for safety reason and tagging red color. Inspection electrical tools of PINCURAN MAS tagging with red color ( MUHAIMIN & ADI )
|
|
2025-02-04
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-BC5-
|
Observation replace lighting lamp power off
|
Replace lighting lamp power result ok ( AGUS & ANDRI )
|
|
2025-02-04
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-PU1
|
Fabrication panel and control
|
Fabrication panel and control at work shop ( FIRMAN & DADANG )
|
|
2025-02-04
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1
|
Clean up area motor and carbon brush room
|
Clean up area motor and carbon brush room also winding motor from dirty of dust ( ADI & MUHAIMIN )
|
|
2025-02-04
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1-& 473 FA7
|
Replace AUTO grease motor
|
Replace AUTO grease motor with full level, test on result ok ( MUHAIMIN & ADI )
|
|
2025-02-04
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-&-473-CC1
|
PMR Service Crit Motor & LSR KL & Cooler
|
PMR Service Crit Motor & LSR KL & Cooler. Clean up area and filter motor. Measure vibration-noise-temperature FS & LS motor. Add grease from 8 times -15 times & 25 times for FS & LS motor ( MUHAIMIN & ADI )
|
|
2025-02-04
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR service CEMS
|
PMR service CEMS. Clean up area motor purge air unit and filter motor, swivel window T/R & R for dust hunter also flange with tube do alignment dust hunter, transducer A & B for flowsick 100, CEMS room and gas room area also filter cabinet MCS 100 E ( RIZAL & EVE PUTRI & EVE FARHANSYAH )
|
|
2025-02-03
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
LIC-RE1&-L1C-BC5-&-L1C-BC6
|
Info lighting lamp hopper coal off and observation lamp off at BC
|
Replace lighting lamp. Test on result ok ( AGUS & FIRMAN & DADANG )
|
|
2025-02-03
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-L63-CM1-463-KL1-473-CC1
|
PMR critical motor LSR RM & CM & KILN & COOLER
|
PMR critical motor LSR RM & CM & KILN & COOLER. Clean up area and filter motor. Measure vibration-noise-temperature FS & LS motor. Add grease from 8 times -15 times & 25 times for FS & LS motor ( MUHAIMIN & EVE PUTRI )
|
|
2025-02-03
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR service analyzer
|
PMR service analyzer. Clean up flange, probe, filter probe, sample line, diaphragm pump, filter balston from dirty of dust. Check humidity sensor replace filter if found bad condition ( RIZAL & ANDRI )
|
|
2025-02-03
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
TPM activity
|
Print out file TPM 443 EL1 and do laminating. Install file TPM at dash board also put dash board at 8th flloor ( ADI & EVE FARHANSYAH & MUHAIMIN )
|
|
2025-01-31
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-EL1
|
Prepare pulling cable and install support
|
Install support cable and pulling cable ( FIRMAN & MUHAIMIN & DADANG )
|
|
2025-01-31
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG
|
Investigation problem at HRG
|
Do investigation at HRG ( AGUS & RIZAL & ANDRI )
|
|
2025-01-31
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Completing data PMR and WBI month january 2025
|
Completing data check sheet month of january 2025 for PMR analyzer L63 2K1-L63 2K2-L63 2K3-483 2K1-463 2K1-443 2K1 & 423 2K1 ( ADI & EVE PUTRI )
|
|
2025-01-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
WS NAR 1 (Coverigng Garage area)
|
Covering garage area with spandex ( ANDRI & AIMAN )
|
|
2025-01-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-CM1-
|
L63-SR1 Add grease
|
Add grease motor. Measure vibration and noise FS & LS result OK ( AGUS)
|
|
2025-01-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-CM1-
|
PMR Service Analyser Coal Mill NAR1
|
PMR Service Analyser Coal Mill NAR1. Clean up flange, sample line, filter probe, diagphragm pump, filter balston from dirty of coal. Check humidity sensor replace filter if found bad condition ( RIZAL & EVE PUTRI )
|
|
2025-01-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3-&-ER4-
|
PMR Clean Up MCC ER All Area Kiln Nar1
|
PMR Clean Up MCC ER All Area Kiln Nar1. Clean up ER3 and ER4 top and bottom from dirty of dust. Vacuum ER and MCC ( AIMAN )
|
|
2025-01-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1-&-463-KL1&-BURNER-FLOOR
|
WBI Elec & Ins & Check I/O GCT, EP,PH&KL
|
WBI Elec & Ins & Check I/O GCT, EP,PH&KL. Measure vibration, noise temperature FS & LS make note abnormal motor ( MUHAIMIN & ADI )
|
|
2025-01-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
FEED-BIN
|
WBI Electric & Instrumentation & Check I/O Feed-Bin
|
WBI Electric & Ins & Check I/O Feed Bin. Measure vibration, noise temperature FS & LS make note abnormal motor ( FIRMAN and DADANG )
|
|
2025-01-24
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
453-PF1-AREA-HOPPER
|
Relocation lighting lamp
|
Do relocation lighting area hopper lamp test on result ok ( AGUS &MUHAIMIN )
|
|
2025-01-24
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-CM
|
Cable are coal mill are not neat
|
Make neat cable area coal mill ( FIRMAN & DADANG & ADI )
|
|
2025-01-24
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-BF5
|
Issue 4 solenoid valve are not working
|
Replace 4 each solenoid valve at bag filter. Coil solenoid valve much off connect coil, move DO and add relay test run result ok ( RIZAL & ANDRI )
|
|
2025-01-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-RF2
|
Speed sensor failure 2 times
|
Resetting speed sensor, test run result ok ( RIZAL & ANDRI )
|
|
2025-01-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-CM1-
|
PMR service analyzer L63 2k1-L63 2k2-L63 2K3-483 2K1
|
PMR service analyzer L63 2k1-L63 2k2-L63 2K3-483 2K1 . Clean up flange, sample line, dryer gas motor, filter balston, diaphragm pump from dirty of dust & coal. Check humidity sensor replace filter if found bad condition ( ADI )
|
|
2025-01-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER5-&-ER6-&-WORK-SHOP
|
PMR clean up MCC ER all area kiln, repainting wall and cleaning work shop
|
PMR clean up MCC ER5 top also bottom & ER6 from dirty of dust. Do vacuum electric room 5 & 6. Clean up work shop and repainting wall work shop ( JAJAT & AIMAN )
|
|
2025-01-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-SHELL-COOLING-FAN
|
Observation cooling motor, bring down motor for servicing
|
Bring down shell cooling fan off to work shop for service ( FIRMAN & MUHAIMIN )
|
|
2025-01-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-FA1
|
Cooler fan motor abnormal
|
Check motor result winding grounded also housing bearing motor abnormal. Being down motor to work shop ( AGUS & DADANG )
|
|
2025-01-22
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1
|
Issue red color at AUTO grease of LS
|
Check system AUTO grease for FS found AUTO grease tank low level replace AUTO grease tank with spare and replace battery result ok, for LS found AUTO grease red color but tank full replace battery result ok ( ADI )
|
|
2025-01-22
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-FX8-&-FX9
|
Motor over load
|
Replace motor spare, install at location. Test run motor result ok ( FIRMAN & ANDRI & DADANG & MUHAIMIN )
|
|
2025-01-22
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
433-FN1
|
Cover panel cable is open
|
Install cover panel also add extra nut from 1 to 4 . Add silicone outside cover panel keep from rain and hot surface ( MUHAIMIN & ADI )
|
|
2025-01-22
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
Replace power supply for panel I/O
|
Check panel I/O area feed bin and raw mill power supply almost install at 2022 decide not replace power supply. Clean up 333 AC1 M1 & 333 AC2 M1, 363 SR1, panel I/O from dirty of dust ( JAJAT & ADI & MUHAIMIN )
|
|
2025-01-22
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-&-473-CC1
|
PMR service critical motor LSR cooler and kiln
|
PMR service critical motor LSR cooler and kiln. Clean up area and filter motor. Measure vibration, noise and temperature FS & LS. Add grease motor 20 times & 25 times for FS & LS ( MUHAIIMIN & ADI )
|
|
2024-12-27
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
474-SC2
|
474-SC2 Service Gland kabel motion
|
474-SC2 Service Gland kabel motion -RIzky
|
|
2024-12-27
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
464-FXZM3
|
464-FXZM3 Servic/Rplc LCS Switch
|
464-FXZM3 Servic/Rplc LCS Switch - Rizky
|
|
2024-12-27
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
464-FXW
|
464 FXW Replace Bearing Fan
|
464 FXW Replace Bearing Fan - Hariyanto
|
|
2024-12-27
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
424-2K1
|
PMR Service CEMS NAR2
|
PMR Service CEMS NAR2 - MElki
|
|
2024-12-27
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
364-RM1
|
364-RM1 Relokasi Panel Welding
|
364-RM1 Relokasi Panel Welding - Hariyanto
|
|
2024-12-26
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
NR.4
|
WBI Sump Pump & Tunnel NAR2
|
WBI Sump Pump & Tunnel NAR2 - Hariyanto
|
|
2024-12-26
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
464-KL1
|
PMR Service burner,Pyro, CCTV, Kiln Scan
|
PMR Service burner,Pyro, CCTV, Kiln Scan - Titok, Deden
|
|
2024-12-26
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
444-PH1
|
PMR Service Analyser & IKGA Preheater N2
|
PMR Service Analyser & IKGA Preheater N2 - Melki
|
|
2024-12-24
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
434-BE1
|
434-BE1 Instal RTD AS Inlet BE
|
434-BE1 Instal RTD AS Inlet BE -Titok, Melki, Deden
|
|
2024-12-24
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
474-FAE
|
474-FAE Cek Temperatur Body Mtr
|
474-FAE Cek Temperatur Body Mtr -Rizky
|
|
2024-12-24
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
464-MD1
|
464-MD1 Service Tubing Pyrometer
|
464-MD1 Service Tubing Pyrometer -Titok, Deden
|
|
2024-12-24
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
403-3E2
|
PMR Clean Up MCC ER All Area Kiln Nar2
|
PMR Clean Up MCC ER All Area Kiln Nar2 - Hariyanto, Iman
|
|
2024-12-24
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
NR.4
|
WBI Electric & Ins Reclaimer & CM atas N
|
WBI Electric & Ins Reclaimer & CM atas N2 - Melki
|
|
2024-12-23
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
NR.4
|
Bin Silica Replace lampu
|
Bin Silica Replace lampu - HAriyanto
|
|
2024-12-23
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
NR.4
|
WBI Electric & Ins Clinker Silo CM bawah
|
WBI Electric & Ins Clinker Silo CM bawah - MElki
|
|
2024-12-23
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
364-RM1
|
364-FN3.T2 Upgrade transmitter
|
364-FN3.T2 Upgrade transmitter -MElki
|
|
2024-12-23
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
364-RM1
|
PMR Service Crit Motor & LSR RM NAR2
|
PMR Service Crit Motor & LSR RM NAR2 - Hariyanto
|
|
2025-01-21
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-FX9
|
Unbalance motor
|
Bring down existing unbalance motor to work shop in order service. Install motor spare at location test run result ok ( RIZAL & MUHAIMIN & ANDRI )
|
|
2025-01-21
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3-&-ER4-
|
PMR service clean up MCC ER3 & ER4
|
PMR service clean up MCC ER3 & ER4. Clean up ER3 & ER4 top also bottom also MCC room from dirty of dust. Vacuum ER3 & ER4 top and bottom room ( AIMAN )
|
|
2025-01-21
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SCA
|
Motor ground
|
Dismantle original motor ground bring to work shop in order to service. Install motor spare from ware house test run result ok ( AGUS & ADI & JAJAT & FRIMAN & DADANG )
|
|
2024-12-20
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
444-CT1
|
444-CT1 Service Gun KapurTohor
|
444-CT1 Service Gun KapurTohor -Rizky
|
|
2024-12-20
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
444-PH1
|
WBI Electric & Ins PH, Blending
|
WBI Electric & Ins PH, Blending -MElki
|
|
2024-12-19
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
424-EP1-F3B1
|
424-EP1 F3B1 Repair cover Thermostat
|
424-EP1 F3B1 Repair cover Thermostat -Hariyanto, Amun
|
|
2024-12-19
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
L64-RM1
|
L64-RM1 Servc Lampu tembak bisi brt
|
L64-RM1 Servc Lampu tembak bisi brt -Hariyanto
|
|
2024-12-19
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
L64-2K1
|
PMR Service Analyser Coal Mill NAR2
|
PMR Service Analyser Coal Mill NAR2 -Melki
|
|
2024-12-19
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
444-PH1-TI9-
|
444 PH1 Ti9 Cek/Servc Indkasi to CCR
|
444 PH1 Ti9 Cek/Servc Indkasi to CCR -MElki
|
|
2024-12-19
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
444-PH1
|
444-PH1.Ti17 Replc TE & TransmitTi17
|
444-PH1.Ti17 Replc TE & TransmitTi17 -Rizky, Melki
|
|
2024-12-19
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
364-CP1
|
364-CP1 Replace ligthing ruang CP.1
|
364-CP1 Replace ligthing ruang CP.1 -HAriyanto
|
|
2024-12-18
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
334-WF2
|
334-WF2 Kalibrasi adjustment WF
|
334-WF2 Kalibrasi adjustment WF -Melki
|
|
2024-12-18
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
334-WF1
|
334-WF1 Kalibrasi adjustment WF
|
334-WF1 Kalibrasi adjustment WF -MElki
|
|
2024-12-18
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
444-CT1
|
444-CT1 Cek/Servc Indikasi Wter Presu
|
444-CT1 Cek/Servc Indikasi Wter Presure -Titok- MElki
|
|
2024-12-18
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
434-3B1
|
434-GT7 Servc/Replc Solenoid gate
|
434-GT7 Servc/Replc Solenoid gate -Titok
|
|
2024-12-18
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
364-RM1
|
WBI Electric & Ins F.Bin & Raw Mill,GCT2
|
WBI Electric & Ins F.Bin & Raw Mill,GCT2 -MElki
|
|
2024-12-18
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
364-RM1
|
364-RM1 Servic Lampu WS Inst Nar2
|
364-RM1 Servic Lampu WS Inst Nar2 -Melki
|
|
2024-12-18
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
364-RM1
|
364-RM1 Replc lampu lorong R shift El
|
364-RM1 Replc lampu lorong R shift El -Melki
|
|
2024-12-17
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
474-CC1
|
474-CC1 Replace Ligthing area ER5
|
474-CC1 Replace Ligthing area ER5 -Hariyanto
|
|
2024-12-17
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
403-3E2
|
PMR Clean Up MCC ER All Area Kiln Nar2
|
PMR Clean Up MCC ER All Area Kiln Nar2 -Hariyanto
|
|
2024-12-17
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
444-PH1
|
444-PH1 Install kamera lantai 7
|
444-PH1 Install kamera lantai 7 -Titok
|
|
2024-12-17
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
424-2K1
|
PMR Service CEMS NAR2
|
PMR Service CEMS NAR2 -Melki
|
|
2024-12-17
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
444-PH1
|
WBI Electric & Ins KILN, EP Cooler,Cool2
|
WBI Electric & Ins KILN, EP Cooler,Cool2 -Rizky, Melki
|
|
2024-12-16
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
494-SC1
|
494-SC1 Seal reducer/motor bocor
|
494-SC1 Cek/Servc Seal reducer/motor -HAriyanto
|
|
2024-12-16
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
464-KL1
|
464-KL1 Inspeksi & Perapihan tool
|
464-KL1 Inspeksi & Perapihan tool -Hariyanto, Amun
|
|
2024-12-16
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
444-EL1
|
444-EL1 Pintu Lift lnti 7 Rusak
|
444-EL1 Service Pintu Lift lnti 7 -Rizky
|
|
2024-12-16
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
444-CT1
|
444-CT1 Relokasi Panel air gun CT 5
|
444-CT1 Relokasi Panel air gun CT 5 -Titok, MElki
|
|
2024-12-16
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
444-PH1
|
PMR Service Elevator & Lift KILN NAR2
|
PMR Service Elevator & Lift KILN NAR2 -Rizky
|
|
2024-12-13
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
4D4-FM1
|
4D4-FM1 Service Controller FM
|
4D4-FM1 Service Controller FM -Titok
|
|
2025-01-20
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-FA1
|
Arrange data spare part
|
Measure vibration, noise for FS & LS. Add grease motor 20 times & 25 times for LS & FS until vibration below 4 mm/s also noise below 2 gE ( FIRMAN & DADANG )
|
|
2025-01-20
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-BE1
|
Replace safety device
|
Replace safety device test functional result ok ( RIZAL & ANDRI )
|
|
2025-01-20
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
PMR service critical motor LSR RM-CM
|
PMR service critical motor LSR RM-CM. Clean up area and filter motor. Measure vibration, noise and temperature FS & LS add grease 1 times & 20 times for FS & LS ( AGUS & DADANG )
|
|
2025-01-20
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
333-AC1-&-363-BE1
|
Add grease motor
|
Measure vibration, noise for FS & LS result high value, add grease for 60 times for FS also 30 times for LS measure vibration below 4 mm/s, noise below 2 gE. Measure vibration, noise for FS & LS result high value add grease 15 times for LS and LS measure vibration below 4 mm/s, noise below 2 gE ( MUHAIMIN & ADI )
|
|
2025-01-18
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-CV1
|
Replace cable from pre amplifier to I/O panel
|
Replace cable from pre amplifier to I/O panel ( MUHAIMIN & FIRMAN )
|
|
2025-01-18
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
INPUT-OUPUT-PANEL-AREA-41
|
Replace power supply
|
Replace power supply I/O area 41 ( RIZAL & ANDRI )
|
|
2025-01-18
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CCR
|
pulling cable new operator
|
Tidy up cable UTP at server room ( AGUS & ADI & DADANG & AIMAN )
|
|
2025-01-18
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
433-FA3-&-433-FN2
|
Replace bearing motor issue high vibration and noise
|
Check actual vibration and noise for 433 FA2 result vibration below 4 mm/s and noise below 2 gE for FS & LS. Replace bearing motor 6309 and 6209 also alignment moto test run motor result vibration below 4 mm/s and noise below 2 gE for FS & LS ( MUHAIMIN & ADI & FIRMAN )
|
|
2025-01-18
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-LD2
|
Replace card
|
Replace card actuator. Test run open and close result ok ( RIZAL & ANDRI )
|
|
2025-01-18
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-PP1
|
Replace cable power
|
Replace cable power from motor to LCS ( AGUS & DADANG & AIMAN )
|
|
2025-01-17
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER5-&-ER6-&-WORK-SHOP
|
PMR clean up MCC all area kiln NR1 and repainting work shop
|
PMR clean up MCC all area kiln NR1 ER5 & ER6, clean up electric room & MCC from dirty of dust also vacuum electric room. Repainting wall of work shop ( AIMAN )
|
|
2025-01-17
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
333-BC1-&-363-WP1
|
Fan VSD off 1 each and prepare modification 363 WP1 for cable also control
|
Replace fan VSD test run result ok. Prepare cable and control for 363 WP1 ( AGUS & MUHAIMIN & DADANG )
|
|
2025-01-17
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
333-BC1
|
Breaker input unsafe condition and open space
|
Replace breaker and make fiber glass for breaker safe condition ( AGUS & FIRMAN & DADANG )
|
|
2025-01-17
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR service CEMS
|
PMR service CEMS. Clean up purge air unit and filter purge air unit, transducer A & B flowsic 100, swivel window T/R & R of dust hunter-flange with tube alignment dust hunter, CEMS room & gas room also flter cabinet of MCS 100 E ( RIZAL & ANDRI )
|
|
2025-01-17
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Completing data PMR and WBI month January 2025
|
Completing data check sheet PMR and WBI month January 2025 such as PMR service analyzer 423 2K1-463 2K1-443 2K1-L63 2K1-L63 2K2-L63 2K3-483 2K1, PMR service IR TAD-Tscanner-CCTV-Camera Burner, WBI top blending-KILN-Cooler-Clinker Silo ( JAJAT & ADI )
|
|
2024-12-13
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
474-CV1
|
474-CV1 Cek/Servc motor seal
|
474-CV1 Cek/Servc motor seal - Hariyanto
|
|
2024-12-13
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
454-PF2.C1
|
454-PF2.C1 Replace Cooling fan vsd
|
454-PF2.C1 Replace Cooling fan vsd - Mardiyanto
|
|
2024-12-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
424-EP1
|
424-EP1 Repair Kabel Heater EP
|
424-EP1 Repair Kabel Heater EP - Rizky
|
|
2024-12-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
L64-2K1
|
PMR Service Analyser Coal Mill NAR2
|
PMR Service Analyser Coal Mill NAR2 - Rizky, Melki
|
|
2024-12-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
464-2K1
|
464-2K1 Service Gas Analizer Sick
|
464-2K1 Service Gas Analizer Sick -Titok, Melki
|
|
2024-12-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
424-EP1
|
424-EP1 Instal Support Kabel tray
|
424-EP1 Instal Support Kabel tray - Hariyanto, Amun
|
|
2024-12-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
NR.4
|
WBI Weldi & P.Lighting & Lightning Rec
|
WBI Weldi & P.Lighting & Lightning Rec
|
|
2024-12-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
474-CC1
|
PMR Service Crit Motor& LSR CM&Cool2
|
PMR Service Crit Motor& LSR CM&Cool2 - Hariyanto
|
|
2024-12-11
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
444-CT1
|
444-CT1 Service line Kapur Tohor with PE
|
444-CT1 Service line Kapur Tohor with PE - Rizky
|
|
2024-11-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
434-RM1
|
Service Hoist RawMill, Short
|
Service Hoist RawMill, Short - Yana, Deden
|
|
2024-11-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
464-KL1
|
PMR Service Crit Motor & LSR KL & Cool2
|
PMR Service Crit Motor & LSR KL & Cool2 - Hariyanto
|
|
2024-11-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
464-2K1
|
PMR Service Analyser & IKGA Preheater N2
|
PMR Service Analyser & IKGA Preheater N2 -Melki
|
|
2024-11-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
364-BC1
|
364-BC1 Replace sensor miltronic
|
364-BC1 Replace sensor miltronic - Yana, Deden
|
|
2024-10-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
474-FA4&5.T1
|
474-FA4&5.T1 Rekondisi Cooling Fan TR
|
474-FA4&5.T1 Rekondisi Cooling Fan TR - Mardiyanto
|
|
2024-10-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
464-2K1
|
464-2K1 Replace Temp controller
|
464-2K1 Replace Temp controller - Titok
|
|
2024-10-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
403-3E2
|
PMR Clean Up MCC ER All Area Kiln Nar2
|
PMR Clean Up MCC ER All Area Kiln Nar2 - Hariyanto
|
|
2024-10-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
424-2K1
|
PMR Service CEMS NAR2
|
PMR Service CEMS NAR2 - Rizky, Melki
|
|
2024-10-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
464-KL1
|
WBI Weld & P.Lighting & Lightning KL,Coo
|
WBI Weld & P.Lighting & Lightning KL,Cool - Hariyanto
|
|
2024-09-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
334-WF2
|
334-WF2 Kalibrasi adjustment WF
|
334-WF2 Kalibrasi adjustment WF -Rizky, Melki
|
|
2024-09-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
334-WF1
|
334-WF1 Kalibrasi adjustment WF
|
334-WF1 Kalibrasi adjustment WF - Rizky, Melki
|
|
2024-09-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
464-MD1.M2
|
464-MD1.M2 Replace Spring Holder
|
464-MD1.M2 Replace Spring Holder - Mardiyanto
|
|
2024-09-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
444-LD1
|
444-LD1 Cek/Servc bukaan Damper
|
444-LD1 Cek/Servc bukaan Damper - Yana, Deden
|
|
2024-09-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
444-CT1
|
444-CT1 Replace Sensor level
|
444-CT1 Replace Sensor level - Titok
|
|
2024-09-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
444-CT1
|
444-CT1 Replace Kabel Instrumen_CAPEX
|
444-CT1 Replace Kabel Instrumen_CAPEX - Titok
|
|
2025-01-16
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-WP1
|
Prepare cable and support materials
|
Preparing cable also support materials ( EKO & FIRMAN )
|
|
2025-01-16
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-LD2
|
Abnormally position damper, observation replace type of damper
|
Check abnormally position damper also check type of damper observation for replacement ( RIZAL & ANDRI )
|
|
2025-01-16
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-FN1
|
Pulling cable power and piping for cooling fan
|
Pulling cable power and piping for cooling fan ( AGUS & FIRMAN & DADANG & JAJAT )
|
|
2025-01-16
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3-&-ER4--&-WORK-SHOP
|
PMR clean up MCC ER all area kiln ad repainting work shop
|
PMR clean up MCC ER all area kiln clean up area Er3 & ER4 for MCC also vacuum room electric and repainting work shop ( AIMAN & JAJAT )
|
|
2025-01-16
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CO2-SYSTEM-TANK-BOTTOM-AREA
|
Clean up area bottom tank of CO2 system
|
Clean up area bottom tank of CO2 system from dirty of dust use instrument air supply ( JAJAT & ADI )
|
|
2025-01-16
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-FN1
|
Prepare colling fan and wiring panel LCS also control
|
Wiring panel LCS cooling fan, install at location ( ADI & MUHAIMIN & FIRMAN & DADANG )
|
|
2024-09-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
364-RM1
|
PMR Service Critical Motor & LSR RM NAR2
|
PMR Service Critical Motor & LSR RM NAR2 - Hariyanto
|
|
2024-06-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
444-EL1
|
444-EL1 Replace Vbelt dan LS pintu
|
444-EL1 Replace Vbelt dan LS pintu - Yana Yuhana
|
|
2024-06-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
L64-BF1-T2
|
L64-BF1 T2 Upgrade Trasmitter
|
L64-BF1 T2 Upgrade Trasmitter - Titok, Melki, Deden
|
|
2024-06-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
L64-BF1-T1
|
E2 L64-BF1 T1 Upgrade transmitter
|
E2 L64-BF1 T1 Upgrade transmitter - Titok, Melki, Deden
|
|
2024-06-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
404-3E1
|
404-3E1 Replace PB reset+indks.materi
|
404-3E1 Replace PB reset+indks.materi - Yana Yuhana, Deden
|
|
2024-06-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
NR.4
|
PMR Service Crane Burner Floor,S.Besi N2
|
PMR Service Crane Burner Floor,S.Besi N2 - Titok
|
|
2024-05-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
334-WF2
|
334-WF2 cek dan Kalibrasi
|
334-WF2 cek dan Kalibrasi - Yana Yuhana, Deden
|
|
2024-05-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
334-WF1
|
334-WF1 cek dan Kalibrasi
|
334-WF1 cek dan Kalibrasi -Yana Yuhana, Deden
|
|
2024-05-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
474-CC1
|
Panel Lampu EP Cooler, Panel lampu (trip)
|
Panel Lampu EP Cooler, Panel lampu (trip) - Rizky, Deden
|
|
2024-05-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
334-WF1
|
Panel Lampu Beltfeed mati, Cek Panel lampu
|
Panel Lampu Beltfeed mati, Cek Panel lampu - Rizky, Melki, Deden
|
|
2024-05-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
NR.L
|
PMR Service Analyser Coal Mill NAR2
|
PMR Service Analyser Coal Mill NAR2
|
|
2024-05-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
464-FX5.M1
|
464-FX5.M1 Service Koneksi Hot Point
|
464-FX5.M1 Service Koneksi Hot Point - Mardiyanto
|
|
2024-05-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
424-EP1
|
424-EP1 Service cems view
|
424-EP1 Service cems view - Titok, Melki
|
|
2024-05-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
NR.4
|
PMR Service Crane Dust Bin, PH (2) NR2
|
PMR Service Crane Dust Bin, PH (2) NR2 - Hariyanto
|
|
2024-05-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
L64-RM1
|
PMR Service Critical Motor& LSR CM&Cool2
|
PMR Service Critical Motor& LSR CM&Cool2 - Hariyanto
|
|
2024-04-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
424-EP1
|
424-EP1 Heater F1B3 install support panel
|
424-EP1 Heater F1B3 install support panel -Hariyanto, Amun
|
|
2024-04-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
424-EP1
|
424-EP1 Heater F3B1 Heater short
|
424-EP1 Heater F3B1 Heater short, sudah dilakukan crosscheck dan troubleshoot untuk mengatasi permasalahan heater short. Dan sudah dilakukan penggantian kabel koneksi. -Rizky, Melki
|
|
2025-01-15
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Prepare cooling fan L63 FN1
|
Preparing cooling fan for L63 FN1: panel of start-stop, cable power, cooling fan ( JAJAT & AGUS & AIMAN )
|
|
2025-01-15
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR service analyzer
|
PMR service analyzer. Clean up flange, probe, filter probe, diaphragm pump, filter balston from dirty of dust. Check humidity sensor replace filter if found bad condition ( MUHAIMIN & ADI )
|
|
2025-01-15
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-BF1
|
Clean up area bottom
|
Do clean up area bottom bag filter ( JAJAT & AIMAN )
|
|
2025-01-15
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
TRUBA-JAGA-CITA
|
Inspection electrical and welding machine of Truba Jaga Cita
|
Inspection electrical and welding machine of Truba Jaga Cita. Tagging equipment electrical & welding with red color ( FIRMAN & DADANG )
|
|
2025-01-15
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-OF-PLANT-BUILDING-OR-CIVIL-BUILDING
|
Inspection electrical and welding machine of plant building or civil building
|
WORK-SHOP-OF-PLANT-BUILDING-OR-CIVIL-BUILDING. Tagging equipment electrical & welding tools with red color ( RIZAL & ANDRI )
|
|
2025-01-15
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-MECHANIC-1
|
Inspection electrical and welding machine of mechanic NR1
|
Inspection electrical and welding machine of mechanic NR1 belong Mr.Akmal. Replace male connector for welding machine and extention cable because bad condition. Tagging equipment electrical & welding tools with red color ( MUHAIMIN & ADI )
|
|
2024-04-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
424-EP1
|
424-EP1 Heater F2B1 Heater short
|
424-EP1 Heater F2B1 Heater short -Rizky, Melki
|
|
2024-04-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
424-EP1
|
424-EP1 kabel tray support rusak,(lanjut)
|
424-EP1 kabel tray support rusak,(lanjut) -Hariyanto, Amun
|
|
2024-04-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
424-EP1
|
424-EP1 panel weelding (netral tidak ada)
|
424-EP1 panel weelding (netral tidak ada) -Rizky
|
|
2024-04-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
444-EL1
|
444-EL1 Cek Lift (Vbelt putus,alligment lantai)
|
444-EL1 Cek Lift (Vbelt putus,alligment lantai) -Yana Yuhana
|
|
2024-04-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
464-2K1-
|
464-2K1 Maintenance Rutin IKGA
|
464-2K1 Maintenance Rutin IKGA -Melki, Titok
|
|
2024-04-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
464-KL1
|
PMR Service Crit Motor & LSR KL & Cool2
|
PMR Service Crit Motor & LSR KL & Cool2 -Hariyanto, Amun
|
|
2024-04-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
444-PH1
|
PMR Service Analyser & IKGA Preheater N2
|
PMR Service Analyser & IKGA Preheater N2 -Melki & Deden
|
|
2024-03-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
424-EP1
|
424-EP1 Heater F1B3 paralel kabel thermostat
|
424-EP1 Heater F1B3 paralel kabel thermostat -Rizky, Melki
|
|
2024-03-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
424-EP1
|
424-EP1 kabel tray support rusak,(lanjut)
|
424-EP1 kabel tray support rusak,(lanjut) -HAriyanto, Amun
|
|
2024-03-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
ER-4
|
ER 4 Bongkar pintu,(lanjut)
|
ER 4 Bongkar pintu,(lanjut) -Hariyanto, Amun
|
|
2024-03-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
444-CT1
|
444-CT1 Servic Shuttle Valve water no
|
444-CT1 Servic Shuttle Valve water no -Titok, Melki, Deden
|
|
2024-03-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
404-3E2
|
404-3E2 Ganti Metering ATS-1 pnl
|
404-3E2 Ganti Metering ATS-1 pnl -Mardiyanto
|
|
2024-03-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
403-3E2
|
PMR Clean Up MCC ER All Area Kiln Nar2
|
PMR Clean Up MCC ER All Area Kiln Nar2 -Hariyanto
|
|
2024-03-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
NR-4
|
WBI Electric & Ins Reclaimer & CM atas N2
|
WBI Electric & Ins Reclaimer & CM atas N2 -Melki
|
|
2024-03-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
464-KL1
|
PMR Service burner,Pyro, CCTV, Kiln Scan
|
PMR Service burner,Pyro, CCTV, Kiln Scan -Yana Yuhana & Deden
|
|
2024-02-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
ER-4
|
ER 4 Bongkar pintu, persiapan instal trafo
|
ER 4 Bongkar pintu, persiapan instal trafo -Hariyanto & Amun
|
|
2024-02-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
424-EP1
|
424-EP1 kabel tray support rusak
|
424-EP1 kabel tray support rusak, sudah dilakukan prbaikan pada kabelTray -Hariyanto & Amun
|
|
2024-02-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
424-EP1
|
424-EP1 Heater F1B3 Kabel Thermostat putus
|
424-EP1 Heater F1B3 Kabel Thermostat putus, perlu dilakukan pengganian koneksi kabel -Rizky, Melki, Ujang, Angga
|
|
2024-02-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
424-EP1
|
424-EP1 Heater F3B2 Kabel Thermostat short
|
424-EP1 Heater F3B2 Kabel Thermostat short -Rizky, Melki, Ujang, Angga
|
|
2024-02-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
4D4-BL1
|
4D4-BL1 Handle LCS rusak
|
4D4-BL1 Replace Handle LCS. -Rizky
|
|
2024-02-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
464-KL1
|
Regulator & water trap rusak
|
E2 464-KL Replce Regulator& water trap -Titok P A & Deden
|
|
2024-02-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
444-CT1
|
E2 444-CT1 Servic Spray sist k.tohor
|
E2 444-CT1 Servic Spray sistem k.tohor -Yana Yuhana, Melki, Deden
|
|
2024-02-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
444-AG2
|
LCS availability menurun dan tidak layak
|
E2 444-AG2 Service/Relokasi LCS -Titok Pangesti Aji & Deden
|
|
2024-02-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
434-RM1
|
PMR Service Critical Motor & LSR RM NAR2
|
PMR Service Critical Motor & LSR RM NAR2 -Hariyanto & Amun
|
|
2025-01-14
1 year ago
|
NR.SHIFT
|
Hendro Supramono
|
INTERNET
|
PROXY
|
http://pac.webdefence.global.blackspider.com/proxy.pac?p=dfv2fv48
|
|
2025-01-14
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-OF-PLANT-BUILDING-OR-CIVIL-BUILDING
|
Inspection electrical and welding machine of plant building or civil building
|
Inspection electrical and welding machine of plant building or civil building. Tagging equipment electrical & welding tools red color ( RIZAL & ANDRI )
|
|
2025-01-14
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-PPUP
|
Inspection electrical and welding machine of PPUP work shop
|
Inspection electrical and welding machine of PPUP work shop. Tagging equipment electrical & welding tools red color ( FIRMAN & DADANG )
|
|
2025-01-14
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-MECHANIC-1
|
Inspection electrical and welding machine of mechanic NR1
|
Inspection electrical and welding machine of mechanic NR1. Clean up area & filter motor. Measure vibration, noise, temperature for free and load side motor. Add grease motor for 20 times & 30 times for FS & LS motor. Preparing cooling fan for L63 FN1 ( AGUS & JAJAT )
|
|
2025-01-14
1 year ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
463-KL1-&-473-CC1
|
PMR service critical motor & LSR cooler and kiln. Prepare cooling for L63 FN1
|
PMR service critical motor & LSR cooler and kiln. Clean up area & filter motor. Measure vibration, noise , temperature for free and load side motor. Add grease 20 times & 30 times for FS & LS motor. Preparing cooling fan for L63 FN1 ( AGUS & JAJAT )
|
|
2025-01-13
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
424-2K1
|
Indikasi SO2 kerendahan( Request Produksi)
|
Dilakukan troubleshooting pada CEMS Rawmill dan Gas test untuk memvalidasi akurasi pembacaan indikasi Analyzer CEMS
|
|
2025-01-13
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-OF-PLANT-BUILDING-OR-CIVIL-BUILDING
|
Inspection electrical and welding machine of plant building or civil building
|
Inspection electrical and welding machine of plant building or civil building. Use red color for tagging equipment ( RIZAL & ANDRI )
|
|
2025-01-13
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-PPUP
|
Inspection electrical and welding machine of PPUP work shop
|
Inspection electrical and welding machine of PPUP work shop. Use red color for tagging equipment ( FIRMAN & DADANG )
|
|
2025-01-13
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-MECHANIC-1
|
Inspection electrical and welding machine of mechanic NR1
|
Inspection electrical and welding machine of mechanic NR1 belong Mr.Ahmad. Service 1 extention cable because male connector for grounding lost nut. Use red color for tagging equipment ( MUHAIMIN & ADI )
|
|
2025-01-13
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
PMR service critical motor LSR RM-CM
|
PMR service critical motor LSR RM-CM. Clean up area and filter motor. Measure vibration, noise, temperature free and load side motor. Add grease 15 times and 20 times for free and load side motor ( AGUS )
|
|
2025-01-11
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Mapping job OH
|
Mapping for job OH ( JAJAT )
|
|
2025-01-11
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
TENT-OH
|
Install lighting lamp and stop cotact
|
Install cable power for lighting lamp and stop contact for tent OH beside north ER5, north coal mill, north work shop electric ( AGUS & RIZAL & MUHAIMIN & ADI & ANDRI & FIRMAN & DADANG & JAJAT )
|
|
2025-01-10
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CCR
|
Re route cable power UPS of new operator CCR ( pulling new cable )
|
Pulling cable for UPS of new operator CCR ( AGUS & FIRMAN & EVE RAMADHAN & JAJAT )
|
|
2025-01-10
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1-&-WORK-SHOP
|
Continue replace lighting lamp area pre heater and prepare cable-stop contact and lamp tent OH
|
Replace lighting lamp area preheater and preparing cable and stop contact also lighting lamp of tent OH ( MUHAIMIN & DADANG )
|
|
2025-01-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER-3-&-ER4
|
PMR clean up MCC ER all area kiln
|
PMR clean up MCC ER all area kiln ER4 & ER3 ( AIMAN )
|
|
2025-01-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
Continue replace lighting lamp area pre heater and prepare lighting lamp for OH tent
|
Replace lighting lamp for area preheater and preparing lighting lamp for OH tent ( RIZAL & FIRMAN & ANDRI )
|
|
2025-01-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER4
|
PMR MCC load, check I/O & UPS
|
PMR MCC load, check I/O & UPS ( AGUS & EVE IQBAL & DADANG )
|
|
2025-01-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-CM1-
|
PMR service analyzer
|
PMR service analyzer CM. Clean up flange, sample line, filter probe also house of filter, diaphragm pump, filter balston from dirty of coal. Check humidity sensor replace filter if found bad condition ( MUHAIMIN & ADI & EVE RAMADHAN )
|
|
2025-01-08
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-FA7
|
Replace handle LCS
|
Replace handle LCS with spare handle ( RIZAL & ANDRI & EVE IQBAL )
|
|
2025-01-08
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
Check observation aeration all cyclone ( issue activation ) and relocation temperature sensor
|
Activation aeration area cyclone PH and relocation temperature sensor ( RIZAL & ANDRI & EVE IQBAL )
|
|
2025-01-08
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
Continue replace lighting lamp area pre heater and prepare lighting lamp for OH tent
|
Replace lighting lamp area pre heater and preparing lighting lamp for tent OH ( AGUS & FIRMAN & DADANG )
|
|
2025-01-08
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-CM1
|
WBI electrical and instrumentation check I/O area CM, SUMP PUMP T&T
|
WBI electrical and instrumentation check I/O area CM, SUMP PUMP T&T. Measure vibration, noise, temperature free and load side motor. Make note at file for un normal vibration and noise free and load side motor ( MUHAIMIN & ADI & EVE RAMADHAN )
|
|
2025-01-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
Observation efectivity of purging TAD
|
Observation efectivity of purging TAD ( RIZAL & ANDRI & DADANG & EVE IQBAL )
|
|
2025-01-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
8th floor lamp lighting off
|
Prepare lighting lamp at work shop for replacement ( RIZAL & ANDRI & DADANG )
|
|
2025-01-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-&-473-CC1
|
PMR service critical motor LSR cooler and kiln
|
PMR service critical motor LSR cooler and kiln. Clean up area and filter motor. Measure vibration, noise, temperature free and load side motor. Add grease 10 times & 15 times for free and load side motor ( AGUS & EVE FAJAR )
|
|
2025-01-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-473-GQ1
|
Replace lighting lamp off
|
Replace lighting blinking and off with spare lamp. Test on result ok ( MUHAIMIN & FIRMAN & ADI & EVE RAMADHAN )
|
|
2025-01-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1-&-473-FA7
|
Replace auto grease
|
Replace auto grease pump with spare ( MUHAIMIN & DADANG )
|
|
2025-01-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-EL1
|
Prepare elevator connection cable power
|
Prepare cable power of elevator and connection cable at ER4 also 8th floor. Install cable tray at 8th floor continue connect cable at LCS also install cable duct cable at 8th floor. Connect cable of elevator at ER4 ( AGUS & FIRMAN & ADI & EVE RAMADHAN )
|
|
2025-01-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Colective and tag name spare part OH
|
Take spare part OH from ware house bring to work shop ( AIMAN & EVE IQBAL )
|
|
2025-01-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR service analyzer & replace probe FE2
|
Replace probe FE2 at 463 2K1. PMR service analyzer, clean up flange, probe, filter probe, sample line, diaphragm pump. filter balston from dirty of dust. Check humidity sensor replace filter if found bad condition ( RIZAL & ANDRI & EVE IQBAL )
|
|
2025-01-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
PMR service critical motor LSR RM-CM
|
PMR service critical motor LSR RM-CM. Clean up area & filter motor. Measure vibration, noise and temperature free and load side motor. Add grease 10 times and 15 times for free and load side motor ( MUHAIMIN & DADANG )
|
|
2025-01-03
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-PP1
|
Observation replace cable power
|
Check at local, cable power needed around 3 meter. Prepare cable power at work shop ( MUHAIMIN & FIRMAN )
|
|
2025-01-03
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-BF2
|
Check purging are not working
|
Check functional of purging, tighten cable power and purging test functional purging result ok ( RIZAL & ANDRI )
|
|
2025-01-03
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-FN1;363-FN2
|
Add grease info from CBM Mr.Najib high noise up 2 gE
|
Add grease for free and load side 15 times for 363 FN1-363 FN2 ( ADI )
|
|
2025-01-02
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
4D3-BF1
|
Cleaning area motor
|
Cleaning area motor use hand blower and iron brush also cloth ( JAJAT & FIRMAN & AIMAN )
|
|
2025-01-02
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1-463-KL1-423-EP1
|
WBI electrical & instrumentation check I/O GCT-EP-PH & KILN
|
WBI electrical & instrumentation check I/O GCT-EP-PH & KILN. Clean up area motor, measure vibration-noise-temperature free and load side motor ( FIRMAN )
|
|
2025-01-03
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-CM1-
|
PMR service analyzer coal mill
|
PMR service analyzer coal mill . Clean up flange, sample line, filter probe, diaphragm pump, filter balston from dirty of coal. Check humidity sensor replace filter if found bad condition ( RIZAL & ANDRI )
|
|
2025-01-02
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR service analyzer
|
PMR service analyzer. Clean up flange, probe, filter probe, sample line, diaphragm pump, filter balston from dirty of dust. Check filter humidity sensor replace filter if found bad condition ( RIZAL & ANDRI )
|
|
2025-01-02
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
FEED-BIN
|
WBI Electrical & Instrumentation check I/O
|
WBI electrical & instrumentation check I/O area feed bin ( MUHAIMIN )
|
|
2024-12-31
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-RF6
|
Observation abnormally motor
|
Test run motor spare at work shop, measure ampere every line, vibration, noise for free and load side ( FIRMAN & AGUS & EVE RAMADHAN & MUHAIMIN & YOGA SHIFT )
|
|
2024-12-31
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Completing data TPM 433 PF1
|
Completing data TPM for 433 PF1, send to Miss. FIFA ( RIZAL )
|
|
2024-12-31
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR service CEMS
|
PMR service CEMS. Clean up purge air unit & filter purge air unit, swivel window T/R & R of dust hunter, alignment dust hunter, transducer A & B flowsick 100, CEMS room & gas room. filter cabinet MCS 100 E ( RIZAL & ANDRI & EVE IQBAL )
|
|
2024-12-31
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-&-473-CC1
|
PMR service critical motor LSR cooler and kiln
|
PMR service critical motor LSR cooler and kiln. Clean up area and filter motor. Measure vibration-noise-temperature for free and load side. Add grease motor 10 times and 15 times for free and load side ( AGUS & FIRMAN )
|
|
2024-12-31
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-EL1-&-SUMP-PUMP-EL1
|
PMR service elevator and WBI sump pump
|
PMR service elevator, clean up elevator room and door for every floor from dirty of dust. Test run elevator from 8th to 1st floor result ok ( MUHAIMIN & ADI )
|
|
2024-12-31
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SC1-&-393-SC3
|
Clean up area motor
|
Clean up area motor form dirty of dust use iron brush and hand blower ( MUHAIMIN & ADI & JAJAT )
|
|
2024-12-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CCR
|
Fabrication cover hole at operator room
|
Fabrication cover hole at operator room ( MUHAIMIN & FIRMAN & ADI )
|
|
2024-12-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SC1
|
Relocation amplifier motion
|
Fabrication support motion sensor at work shop ( RIZAL & ANDRI )
|
|
2024-12-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-FA7
|
Replace handle LCS
|
Replace handle LCS ( RIZAL & ANDRI )
|
|
2024-12-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1;-L63-RM1;-463-KL1
|
PMR service IR TAD-T Scanner-CCTV-Camera Burner
|
PMR service IR TAD-T scanner-CCTV-camera burner. Clean up lens, flange from dirty of dust ( AGUS )
|
|
2024-12-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-RF6
|
Regrease motor
|
Check at site for vibration 14 mm/s and noise 9.6 gE. Note need to be replace bearing motor ( MUHAIMIN & ADI )
|
|
2024-12-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Completing data PMR and WBI month december 2024
|
Completing data check sheet PMR month of december 2024. PMR analyzer L63 2K1-L63 2K2-L63 2K3-483 2K1-463 2K1-443 2K1-423 2K1. PMR service critical motor RM-CM-KILN-COOLER ( ADI & JAJAT )
|
|
2024-12-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-463-KL1
|
PMR service critical motor LSR RM-CM & KILN-COOLER
|
PMR service critical motor LSR RM-CM & KILN _COOLER. Clean up area motor & filter motor from dirty of dust. Measure vibration, noise, temperature free and load side motor. Add grease 7 times, 10 times and 15 times for free and load side motor ( ADI & MUHAIMIN )
|
|
2024-12-27
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SC5
|
Observation relocation motion sensor
|
fabrication support motion sensor ( ADI & ANDRI )
|
|
2024-12-27
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-FV1-&-FV2
|
Indication lamp abnormal
|
Replace lamp with spare, test on result ok ( RIZAL & ANDRI )
|
|
2024-12-27
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-AC1-R1
|
Replace TLS
|
Move solenoid valve ( RIZAL & ANDRI )
|
|
2024-12-27
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-2K1
|
Replace filter probe
|
Replacing filter probe ( ADI & MUHAIMIN & EVE FARHANSYAH )
|
|
2024-12-27
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3-&-ER4-
|
Observation planning pulling FO cable
|
Measure FO cable at ER3 & ER4 top to bottom floor ( AGUS & EVE FARHANSYAH )
|
|
2024-12-27
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
LA3-PU1
|
Clean up area equipment IDO pump
|
Clean up area IDO pump form dirty of dust use hand blower, broom and cloth ( JAJAT & MUHAIMIN & ADI )
|
|
2024-12-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
MCC-ELECTRIC-ROOM-AREA-KILN
|
PMR clean up MCC ER all area kiln
|
PMR clean up MCC ER area kiln ( AGUS & AIMAN )
|
|
2024-12-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1-&-BURNER-FLOOR-493-3B1
|
PMR service analyzer & WBI crane-hoist
|
PMR service analyzer, clean flange-probe-filter probe-sample line-diaphragm pump-filter balston from dirty of dust. Check humidity sensor replace filter if found bad condition. WBI hoist and crane, clean up area motor-rail-control from dirty of dust ( RIZAL & ANDRI )
|
|
2024-12-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1-L63-CM1
|
PMR service IR TAD-T Scanner-CCTV-Camera Burner & PMR service analyzer
|
PMR service IR TAD-T scanner-CCTV and camera burner, clean lens and flange from dirty of dust. PMR service analyzer, clean up flange-filter probe-sample line-diaphragm pump-filter balston from dirty of coal, check humidity sensor replace filter if found bad condition ( MUHAIMIN & ADI & EVE FARHANSYAH )
|
|
2024-12-24
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-FN1
|
Install red box LOTOTO panel
|
Install LOTOTO panel of red box ( MUHAIMIN & ANDRI )
|
|
2024-12-24
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-423-2K1
|
Reading fluctuation & PMR service CEMS
|
Service analyzer such clean flange, probe, filter probe, from dirty of dust result reading ok. PMR service CEMS such as clean up purge air unit-filter purge air unit-swivel window dust hunter-alignment dust hunter-transducer flowsic-CEMS room-gas CEMS room-filter cabinet MCS 100 E from dirty of dust ( RIZAL & EVE FARHANSYAH & EVE RIZKI )
|
|
2024-12-24
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1-L63-CM1-363-RM1
|
WBI hoist and crane
|
WBI hoist and crane. Clean up area motor, control, rail from dirty of dust use hand blower. Test move south-north-west-east-up-down result ok ( AGUS & ADI )
|
|
2024-12-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-RETURN-PUMP
|
Instalation CCTV, pulling UTP and configuration IP of CCTV view return pump
|
Installation CCTV, pulling UTP from camera burner room to new CCTV location. Also configuration IP of CCTV view return pump kiln ( AGUS & ANDRI & FIRMAN )
|
|
2024-12-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-L63-CM1-463-KL1-473-CC1
|
PMR service critical motor LSR RM-CM-KL-COOLER
|
PMR service critical motor LSR area RM-CM-KILN and COOLER. Clean up area and filter motor. Measure vibration-noise-temperature free and load side motor. Add grease 10 times-15times-25 times for free and load side motor ( MUHAIMIN )
|
|
2024-12-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Completing data PMR and WBI month december 2024
|
Completing data check sheet PMR and WBI of electric I such as PMR service analyzer L63 2K1-L63 2K2-L63 2K3-483 2K1-463 2K1-443 2K1 and 423 2K1. PMR service critical motor LSR RM-CM-KILN and COOLER PMR service camera burner-IR TAD-Tscanner & CCTV ( ADI )
|
|
2024-12-20
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-FN1-&-463-MD1-&-473-FA3-&-473-FA4
|
Check vibration and noise high
|
Add grease 8 times and 15 times for free and load side motor. Measure vibration and noise reduce from before back to normal noise below 2 gE and vibration below 4 mm/s ( ADI )
|
|
2024-12-20
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
Relocation clean up of way
|
Relocation way of clean up ( RIZAL & ANDRI )
|
|
2024-12-20
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG
|
Observation level RO and leaked piping of HRG or WTP and solenoid
|
Repare leaked piping HRG, add seal tape at pipe and solenoid valve test leaked ok ( JAJAT & FIRMAN & AIMAN )
|
|
2024-12-20
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
Check temperature IR TAD abnormal indication
|
Service temperature IR TAD, clean up flange and lens, found little scratch at lens. Propose replace lens with spare ( RIZAL & ANDRI )
|
|
2024-12-20
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-BF1
|
Solenoid valve no 4 abnormal
|
Replace solenoid valve with spare. Test functional result ok ( RIZAL & ANDRI )
|
|
2024-12-20
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER5
|
Install CCTV at bottom ER5
|
Move original power supply and UTP panel up mid door ER5. Install CCTV at front of panel ( AGUS & MUHAIMIN & ADI )
|
|
2024-12-20
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-RETURN-PUMP
|
Observation cable way and instalation CCTV point view return pump
|
Observation cable way for instalation CCTV for return pump. Cable needed approximatley 15 meter from camera burner CCTV to point instalation CCTV ( AGUS & MUHAIMIN & ADI )
|
|
2024-12-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ELECTRIC-ROOM
|
PMR clean up MCC all area kiln NR1
|
PMR clean up MCC all area KILN NR1 ( AIMAN )
|
|
2024-12-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CCR
|
Observation dismantling or relocation cable power or data for new operator
|
Observation dismantling and relocation cable power and data for new operator ( AGUS & FIRMAN )
|
|
2024-12-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-CM1-
|
PMR service analyzer
|
PMR service analyzer. Clean up flange, sample line, filter probe, diaphragm pump, filter balston from dirty of coal. Check humidity sensor replace filter if found bad condition ( RIZAL & ANDRI & EVE ZAHRA )
|
|
2024-12-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
333-AC1-&-433-FN2
|
Check noise motor and refill grease
|
Measure vibration-noise free and load side motor, add grease 15 times measure vibration-noise result value reduce back to normal. Check at local found motor no grease motor, measure noise-vibration at free side result 9 gE and 7 mm/s need to replace bearing motor ( ADI & MUHAIMIN )
|
|
2024-12-18
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG
|
Observation leaked current
|
Observation leaked current, connect cable to ground cable that good current ( AGUS & JAJAT & FIRMAN & CIVACON )
|
|
2024-12-18
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
Clean up pipe diesel at 3rd floor and repainting
|
Clean up pipe diesel and repainting yellow and red color ( ADI & MUHAIMIN & 4 CIVACON )
|
|
2024-12-18
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-443-2K1-423-2K1
|
PMR service analyzer & PMR service CEMS
|
PMR service analyzer. Clean up flange, sample line, filter probe, diaphragm pump, filter balston from dirt of dust. Check humidity sensor replace filter if found bad condition. Clean up purge air unit & filter, swivel windows, alignment dust hunter, transducer flowsic, CESM room & gas room, filter cabinet MCS 100 E ( RIZAL & ANDRI & EVE ZAHRA )
|
|
2024-12-16
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CAMERA-BURNER
|
Check camera burner
|
Service camera burner. Clean up flange and lens from dirty of dust ( RIZAL & ANDRI )
|
|
2024-12-17
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG
|
Observation level RO and repare leaked piping HRG
|
Observation level RO and repare leaked piping of HRG ( RIZAL & 2 CIVACON )
|
|
2024-12-17
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR service CEMS
|
PMR service CEMS. Clean up area purge air unit and filter motor, swivel windows of dust hunter, alignment dust hunter, transducer of flowsic, CEMS room and gas room, filter cabinet MCS 100 E ( RIZAL & EVE FAJAR & CIVACON )
|
|
2024-12-17
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER4
|
Pulling FO cable from ER4 to work shop
|
Pulling FO cable from ER4 to work shop ( RIZAL & 2 CIVACON )
|
|
2024-12-17
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-CP1
|
Install panel window
|
Installing panel window make bigger than original ( AGUS & CIVACON )
|
|
2024-12-17
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-CC1-&-363-RM1
|
Replace battery Easylube fan cooler
|
Replacing battery Easylube fan cooler and 333 BC1 replace Easylube tank and battery with spare. Measure vibration-noise-temperature free and load side motor. Add grease 10 times and 15 times for free and load side motor ( MUHAIMIN & EVE FAJAR )
|
|
2024-12-17
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Completing data PMR and WBI month december 2024
|
Completing data check sheet PMR and WBI month of december such as PMR service analyzer L63 2K1-L63 2K2-L63 2K3-483 2K1-463 2K1-443 2K1-423 2K1 and WBI Electrical & Instrumentation CM, Truck Lift, BC Transport , Tripper, Reclaimer CM ( JAJAT & ADI )
|
|
2024-12-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR service analyzer
|
PMR service analyzer. Clean up flange, probe, filter probe, sample line, diaphragm pump, filter balston from dirty of dust. Check humidity sensor replace filter if found bad condition ( RIZAL & ANDRI & EVE RAMADHAN )
|
|
2024-12-10
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR service CEMS
|
PMR service CEMS. Clean up area purge air unit and filter, swivel window dust hunter, alignment dust hunter, transducer flowsic, CEMS room and gas room, filter cabinet MCS 100 E ( RIZAL & MUHAIMIN & EVE IQBAL )
|
|
2024-12-10
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR service analyzer
|
PMR service analyzer. Clean up flange probe, sample line, filter probe, diaphragm pump, filter balston from dirty of coal. Check humidity sensor, replace filter if found bad condition ( RIZAL & MUHAIMIN & ANDRI )
|
|
2024-12-16
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-EH1
|
Install hoist kiln
|
Install hoist at kiln ( RIZAL & ANDRI & 2 CIVACON )
|
|
2024-12-16
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-463-KL1
|
PMR service critical motor LSR RM-CM-KL-COOLER
|
PMR service critical motor LSR RM-CM-KL-COOLER. Clean up area motor & filter motor. Measure vibration, noise, temperature free and load side motor. Add grease 10 times-15 times-25 times for free and load side motor ( AGUS & MUHAIMIN )
|
|
2024-12-13
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-BL1
|
problem trip no load
|
Check problem, test run result ok ( AGUS & JAJAT )
|
|
2024-12-13
1 year ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
ER5-&-473-CC1
|
Activation CCTV
|
Activation CCTV for ER5 & 473 CC1 ( AGUS & EVE IQBAL )
|
|
2024-12-13
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FN3-&-PULLING-CABLE-423-FN1
|
Replace bearing motor
|
Replace bearing motor and pulling cable reposition 423 FN1 ( MUHAIMIN & FRIMAN & PENY & 5 CIVACON )
|
|
2024-12-13
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
Install cover protection heat from kiln
|
Take materials from ware house. Fabrication cover hot materials, install at site ( RIZAL & ADI & EVE IQBAL & ANDRI )
|
|
2024-12-12
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Service welding machine
|
Service welding machine that are not working well ( FIRMAN & CIVACON )
|
|
2024-12-12
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER4
|
Project 423 FN1 & pulling cable re position
|
Support Mr.Eko & Mr.Mardianto for project 423 FN1 and pulling cable reposition ( PENY & FIRMAN & 4 CIVACON )
|
|
2024-12-12
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
Observation IKGA for can retract probe from CCR and install flaver valve
|
Observation analyzer probe can retract from CCR and install flaver valve also make sure equipment protect from reduction hot materials ( RIZAL & EVE ZAHRA & ANDRI )
|
|
2024-12-12
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-AC1
|
Replace handle LCS that can be lock
|
Replace handle LCS with spare, test lock result ok ( RIZAL & EVE ZAHRA & ANDRI )
|
|
2024-12-12
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WARE-HOUSE-SAND
|
Install lighting lamp
|
Install lighting lamp. Test on result ok ( FIRMAN & CIVACON )
|
|
2024-12-12
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1
|
Replace carbon brush
|
Clean up area main drive and carbon brush room from dirty of dust use instrument air supply. Measure long of all carbon brush. Replace carbon brush 4 each with spare carbon brush ( AGUS & MUHAIMIN & EVE IQBAL )
|
|
2024-12-12
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-CC1
|
Clean up area I/O panel and write data documentation power supply of I/O panel
|
Clean up area I/O panel and panel power supply input form dirty of dust. Note all power supply for I/O panel installed at 2024 ( ADI & CIVACON )
|
|
2024-12-11
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER4
|
Project 423 FN1
|
Support Mr.Eko and Mr.Mardianto for project 423 FN1 ( PENY & EKO & MARDIANTO )
|
|
2024-12-11
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-CM1-&-363-HS1
|
Clean up area I/O panel and write power supply install up to 5 years
|
Clean up I/O panel area coal mill, also take picture of power supply install up to 5 years ( ADI & EVE RAMADHAN )
|
|
2024-12-11
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG
|
Install finger and ELGA sensor also repair cover
|
Install finger and sensor ELGA. Repair cover ( AGUS & AIMAN & JAJAT & EVE RAMADHAN )
|
|
2024-12-11
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
Observation IKGA for can retract probe from CCR
|
Observation at IKGA in case probe can retract from CCR. Found seal of hydrolic tank leakage by positive material ( RIZAL & EVE ZAHRA & ANDRI )
|
|
2024-12-11
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-AC1
|
Replace pull cord switch
|
Replace pull cord switch, test functional result ok ( RIZAL & ANDRI & EVE ZAHRA )
|
|
2024-12-11
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-FN1
|
Observation auto balancer ( cable, coil ). part coil short, make sure process replacement
|
Observation auto balancer for cable and coil. Check at part of coil make sure how to replacement ( PENY & MUHAIMIN & EVE ZAHRA )
|
|
2024-12-11
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
413-3B1&-3B2-&-WA-TER-RETURN-PUMP-KILN
|
Clean up all I/O panel area blending west & east also water return pump kiln I/O panel
|
Clean up panel I/O area blending from dust also water return pump kiln I/O panel from coal dust use hand blower ( ADI & EVE IQBAL )
|
|
2024-12-10
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
Check leakage at sampling line
|
Check lekakage at sampling line after replace tube result ok ( RIZAL & EVE RAMADHAN )
|
|
2024-12-10
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER4
|
Project 423 FN1
|
Support Mr.Eko and Mr.Mardianto for project 423 FN1 ( PENY & ADI & EVE IQBAL )
|
|
2024-12-10
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-AC1-&-AC2
|
Prepare LCS and continue welding point
|
Install LCS and welding point ( ANDRI & FIRMAN )
|
|
2024-12-10
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
PMR service critical motor LSR cooler and kiln
|
PMR service critical motor LSR cooler and kiln. Clean up area and filter motor. Measure vibration-noise-temperature free and load side motor. Add grease 15 times and 25 times for free and load side motor ( AGUS & MUHAIMIN )
|
|
2024-12-10
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR service CEMS
|
PMR service CEMS. Clean up are purge air unit and filter, swivel windows dust hunter, alignment dust hunter, transducer flowsic, CEMS room area and gas room also filter cabinet MCS 100 E ( RIZAL & EVE RAMADHAN )
|
|
2024-12-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
Service analyzer
|
Service analyzer. Clean up filter, replace tube sampling line reconnecting tubing sampling line. Result ok ( PENY & MUHAIMIN & EVE ZAHRA & EVE IQBAL & EVE RAMADHAN )
|
|
2024-12-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Completing notification for WBI top blending. CT, PH, Kiln
|
Make notification report WBI top blending. CT, PH, Kiln ( Adi & EVE Zahra )
|
|
2024-12-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CCR
|
Pulling cable operator room
|
Pulling cable at operator room ( JAJAT & AGUS & PENY & ADI & MUHAIMIN & ANDRI & FIRMAN & EVE ZAHRA & EVE IQBAL & EVE RAMADHAN )
|
|
2024-12-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
413-BLC
|
Check vibration and noise. Replace bearing motor
|
Do check vibration and noise motor result normal vibration below 4 mm/s and noise below 2 gE ( PENY & FIRMAN & EVE IQBAL & EVE ZAHRA )
|
|
2024-12-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Completing data PMR and WBI month december 2024
|
Completing data check sheet PMR analyzer 463 2K1-443 2K1-423 2K1-L63 2K1-L63 2K2-L63 2K3-483 2K1. WBI electrical & instrumentation top blending-CT-PH-KILN, WBI electrical & instrumentation bottom blending-KILN-COOLER-Clinker Silo ( ADI & JAJAT )
|
|
2024-12-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
PMR service critical motor LSR RM-CM
|
PMR service critical motor LSR RM & CM. Clean up area and filter motor. Measure vibration-noise-temperature free and load side motor. Add grease 10 times and 15 times for free and load side motor ( AGUS & MUHAIMIN & EVE RAMADHAN )
|
|
2024-12-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Fabrication items HRG
|
Fabrication items HRG ( ANDRI & FIRMAN )
|
|
2024-12-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
433-PF1
|
TPM clean up area
|
TPM 433 PF1. Clean up area from dirty of dust ( RIZAL & EVE RAMADHAN & EVE IQBAL )
|
|
2024-12-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1
|
PMR service carbon brush
|
Clean up carbon brush. Measure long of carbon brush, replace carbon brush because already short ( PENY & ADI & EVE MUHAIMIN )
|
|
2024-12-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FN4
|
High vibration 6 mm/s
|
Check at local measure vibration free and load side motor. Add grease 15 times for free and load side motor measure vibration result 3.4 mm/s ( AGUS & MUHAIMIN )
|
|
2024-12-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-FA2
|
Replace v belt
|
Replacing V belt because condition already cracked. Do alignment motor test run result ok ( PENY & ADI & MUHAIMIN & FIRMAN & EVE IQBAL )
|
|
2024-12-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-BC2
|
Belt drift indication failure at CCR
|
Check at local for belt drift. Found that dirty at connection and scun bad condition. Reconnect cable indication belt drift test functional result ok ( PENY & EVE ZAHRA & EVE RAMADHAN )
|
|
2024-12-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Fabrication or prepare welding point, cable position at coal mill. Cover PG at blending
|
Fabrication welding point install at 463 KL1 and install cover PG at blending ( ANDRI & FIRMAN & MUHAIMIN & EVE IQBAL )
|
|
2024-12-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR CEMS
|
PMR service CEMS. Clean up purge air unit area and motor, swivel window dust hunter, transducer flowsic, alignment dust hunter, CEMS room, filter cabinet MCS 100 E, CEMS gas room ( RIZAL & EVE RAMADHAN )
|
|
2024-12-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
WBI electrical and instrumentation top blending, pre heater and kiln
|
WBI electrical and instrumentation top blending, pre heater and kiln. Measure vibration-noise and temperature free side also load side motor ( PENY & ADI & EVE ZAHRA )
|
|
2024-12-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
PMR-TRAFO-
|
PMR trafo check temperature use thermogun and write ampere motor also clean up area
|
PMR trafo check temperature use thermogun and write ampere motor also clean up area ( AGUS & MUHAIMIN & EVE IQBAL )
|
|
2024-12-04
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-B1-&-B3
|
Check membran
|
Check functional of membran. Clean up membran form dirty of dust. Test functional membran result ok ( RIZAL & EVE IQBAL )
|
|
2024-12-04
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1-
|
PMR service analyzer
|
PMR service analyzer. Clean up flange, probe, filter probe, sample line, diaphragm pump, filter balston from dirty of dust. Check humidity sensor replace filter if found bad condition ( RIZAL & EVE IQBAL )
|
|
2024-12-04
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
WBI electrical & instrumentation panel I/O feed bin
|
WBI electrical & instrumentation panel I/O feed bin. Clean up area motor, measure vibration-noise-temperature free and load side motor ( PENY & MUHAIMIN & EVE RAMADHAN )
|
|
2024-12-04
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG
|
Prepare CCTV
|
Install CCTV inside HRG room, connect UTP cable at CCTV at panel I/O. Test on result ok. Setting at panel CCTV at work shop result picture available ( AGUS & ADI & ANDRI )
|
|
2024-12-03
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
WBI electrical and instrumentation top blending, pre heater and kiln
|
WBI electrical and instrumentation top blending, pre heater and kiln. Measure vibration, noise and temperature free and load side motor. Clean up area motor ( PENY & ADI )
|
|
2024-12-03
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-AC1
|
Countinue Instalation welding point
|
Instalation welding point ( Firman, EVE Fajar and EVE Iqbal )
|
|
2024-12-03
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG
|
YM HRG UTIS
|
Support YM HRG from UTIS ( Peny, Adi and Jajat )
|
|
2024-12-03
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
PMR critical motor LSR kiln and cooler
|
PMR critical motor LSR kiln and cooler. Clean up area and filter motor. Measure vibration, noise, temprature for free and load side motor. Add grease 10 times and 15 times for free and load side motor ( Agus and Muhaimin )
|
|
2024-12-02
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-RF6
|
High vibration motor 23 mm/s, noise 8 gE
|
Replace bearing motor, install back test run measure vibration and noise are ok. Vibration 2 mm/s noise 1 gE ( RIZAL & ANDRI & FIRMAN & MUHAIMIN )
|
|
2024-12-02
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Completing data PMR and WBI month november 2024
|
Completing data check sheet PMR analyzer L63 2K1, L63 2K2, L63 2K3, 483 2K1, 463 2K1, 443 2K1 and 423 2K1 ( ADI & EVE ZAHRA )
|
|
2024-12-02
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
PMR service temperature IR TAD, CCTV, T_scanner, camera burner
|
PMR service temperature IR TAD, CCTV, T_scanner, camera burner. Clean up lens from dirty of dust ( PENY & EVE IQBAL )
|
|
2024-12-02
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
PMR critical motor LSR RM & CM
|
PMR service critical motor LSR raw mill and coal mill. Clean up area and filter motor. Measure vibration, noise and temperature free side also load side. Add grease 5 times-7 times and 10 times for free and load side motor ( AGUS & MUHAIMIN )
|
|
2024-11-29
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Power for TV
|
Prepare power cable for TV and cable UTP ( FIRMAN & AGUS )
|
|
2024-11-29
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG
|
Prepare piping N2 for test leaked of HRG
|
Preparing piping N2 ( RIZAL & ANDRI )
|
|
2024-11-29
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR service analyzer
|
PMR service analyzer. Clean up flange, probe, sample line, filter probe, diaphragm pump. filter balston from dust. Check filter humidity replace filter if found bad condition ( ADI & RIZKY )
|
|
2024-11-29
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
433-PF1
|
TPM clean up area
|
Clean up area from dust ( ADI & MUHAIMIN & RIZKY & EVE RAMADHAN & AGUS )
|
|
2024-11-28
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR service analyzer
|
PMR service analyzer. Clean up flange, sample line, filter probe, diaphragm pump, filter balston from dirty of coal. Check humidity sensor, replace filter if found bad condition ( RIZAL & MUHAIMIN & EVE IBNU )
|
|
2024-11-28
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Take 2 cable ( 2 husble ) 6P x 0.75 mm to electrical ware house and take FO cable for stop contact CCTV WS EL1
|
Take 2 cable 2 husble 6P x 0.75 mm bring to electrical ware house and take FO cable for stop contact CCTV work shop ( AGUS & AIMAN & CIVACON )
|
|
2024-11-28
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L93-SC1
|
Repair speed sensor
|
Check at site, found cable is not good connection. reconnect cable test functional sensor result ok ( PENY & ANDRI & EVE IQBAL & EVE RAMADHAN )
|
|
2024-11-28
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1;-L63-RM1;-463-KL1
|
PMR service temperature IR TAD, CCTV, T_scanner, camera burner
|
PMR service temperature IR TAD, CCTV, T_scanner and camera burner. Clean up lens, flange from dirty of dust ( ADI & RIZKY & EVE ZAHRA )
|
|
2024-11-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
GCT-NR2-&-INDICATION-PRESSURE-COMPRESSOR-IOP
|
Help commisioning GCT NR2, puling cable tank to panel GCT
|
Commisioning GCT Nr2, pulling cable to panel GCT Nr2. Service indication pressure compressor result ok ( RIZAL & CIVACON & ANDRI & EVE IQBAL )
|
|
2024-11-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
PMR service critical motor LSR KL & COOLER
|
PMR service critical motor LSR kiln & cooler. Clean up area and filter motor. Measure vibration, noise, temperature free and load side motor. Add grease 10 times and 25 times for free and load side motor ( AGUS & MUHAIMIN & EVE RAMADHAN )
|
|
2024-11-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Completing data PMR and WBI month november 2024
|
Completing data check sheet WBI & PMR for Electrical & Instrumentation CM-Truck Lift-BC Transport-Tripper-Reclaimer Coal, WBI Electrical & Instrumentation Feed Bin-Raw Mill-CT-Dust Transport-BF, PMR Panel Welding & Lighting, PMR Hoist Crane, PMR service Camera Burner-IR TAD-CCTV-T scanner, PMR service elevator until month of november 2024 ( ADI & EVE RIZKY FAJAR )
|
|
2024-11-25
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-AC1
|
Continue install welding panel
|
Install welding panel ( FIRMAN & EVE RAMADHAN )
|
|
2024-11-25
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
COMMISIOING-GCT-NR2
|
Help commisioning GCT NR2
|
Commisioning GCT Nr2 ( RIZAL & MUHAIMIN & EVE ZAHRA & EVE IBNU & ANDRI )
|
|
2024-11-25
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Completing data PMR and WBI month november 2024
|
Completing data check sheet PMR and WBI month november 2024 for analyzer, critical motor LSR KL Cooler RM CM, Top blending and bottom blending ( JAJAT & ADI )
|
|
2024-11-25
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
PMR service critical motor LSR RM & CM
|
PMR service critical motor LSR RM & CM. Clean up area and filter motor. Measure vibration, noise and temperature free also load side motor. Add grease 15 times and 20 times for free and load side motor ( AGUS & EVE IQBAL )
|
|
2024-11-23
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
L64-RM1
|
Coal Mill Shutdown, Pengecekan sensor motor Coal Mill
|
MElakukan pengecekan kondisi sensor Coal Mill, pembacaan sensor, indikasi sensor di CCR, continity kabel sensor sampai ke ER 5.
|
|
2024-11-22
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER5-&-WORK-SHOP
|
Activation CCTV and continue wiring welding panel
|
Activation CCTV from ER5 to cooler result ok. Wiring welding panel ( AGUS & PENY & MUHAIMIN & FIRMAN )
|
|
2024-11-22
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CAMERA-BURNER
|
Service camera burner
|
Service camera burner. Clean up lens of camera result view burner ok ( RIZAL & ANDRI )
|
|
2024-11-22
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1;-L63-CM;-443-EH1
|
WBI hoist and crane
|
WBI hoist and crane are RM-PH and CM. Clean up area motor and test moving hoist also crane up and down, north and south, east and west. Result ok ( RIZKY & ADI & EVE RAMADHAN )
|
|
2024-11-21
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER5
|
Install CCTV from ER5 to cooler
|
Install CCTV direct to cooler ( AGUS & ANDRI & EVE IQBAL )
|
|
2024-11-21
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L3A-BC3
|
Install lamp off
|
Check at filed found power cable for lamp is disconnected. Pulling cable power 50 meter and install lighting lamp test on result ok ( PENY & MUHAIMIN & FIRMAN )
|
|
2024-11-21
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
PMR service temperature IR TAD, CCTV, T_scanner, camera burner
|
PMR service temperature IR TAD, CCTV, T_scanner, camera burner. Clean up lens and flange from dirty of dust ( RIZAL & EVE IBNU & EVE RAMADHAN )
|
|
2024-11-21
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
413-3B1
|
WBI Bottom blending, burner floor, clinker silo
|
WBI bottom lending, burner floor, and clinker silo. Install auto grease at 493 AC3. Measure vibration-noise and temperature abnormal motor ( ADI & RIZKY )
|
|
2024-11-20
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Prepare welding panel 473 AC1
|
Preparing welding panel of 473 AC1 ( FIRMAN & ANDRI )
|
|
2024-11-20
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CCR
|
Keep it safe power operator CCR NR1 and survey cable FO
|
Keep it safe power operator CCR narogong 1 also survey cable FO ( PENY & ADI )
|
|
2024-11-20
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR service analyzer CEMS
|
PMR service analyzer CEMS. Clean up filter purge air unit and motor, swivel windows dust hunter, alignment dust hunter, transducer flowsic, CEMS room , filter cabinet MCS 100 E, gas room area from dirty of dust ( RIZAL & RIZKY & EVE IBNU & EVE IQBAL )
|
|
2024-11-20
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
PMR service critical motor LSR RM-CM
|
PMR service critical motor LSR raw mill and coal mil. Clean up area and filter motor. Vibration-noise and temperature free and load side motor. Add grease 15 times and 25 times for free and load side motor ( AGUS & MUHAIMIN & EVE RAMADHAN )
|
|
2024-11-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
BLENDING-WEST
|
Replace lighting lamp off
|
Replace lighting lamp off with spare lamp. Test on result ok ( ANDRI & MUHAIMIN )
|
|
2024-11-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CCR
|
Relocation instalation operator room to engineer room
|
Relocation CPU and monitor operator Nr1 to engineering room ( JAJAT & AGUS & PENY & RIZAL & ADI & RIZKY & MUHAIMIN & EVE RAMADAN & EVE IQBAL & ANDRI )
|
|
2024-11-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Completing data WBI ,PMR month 9-10 and 11
|
Completing data WBI and PMR month 9, 10, and 11. Scan data send to Mr. Jajat ( PENY & RIZAL & ADI & MUHAIMIN & AGUS & RIZKY )
|
|
2024-11-15
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
424-2K1
|
Service CEMS Rawmill NAR 2
|
Dilakukan Service PMR CEMS RM NAR 2 (Rizky, Fakhri)
|
|
2024-11-18
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
394-BE1
|
Lampu penerangan padam
|
Dilakukan pengantian lampu (muslih, Anton, Deden)
|
|
2024-11-18
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
observation or replace bearing motor
|
Observation replace bearing motor ( PENY & FIRMAN & EVE RAMADHAN )
|
|
2024-11-18
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Prepare form calibration & stop WF. Completing data WBI or PMR month november 2024
|
Prepare file form calibration & stop WF also completing data WBI and PMR month november 2024 ( ADI & EVE IBNU )
|
|
2024-11-18
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR service analyzer
|
PMR service analyzer. Clean up flange, filter probe, probe, sample line, diaphragm pump, filter balston from dirty of dust. Check humidity sensor, replace filter if found bad condition ( RIZAL & MUHAIMIN & RIZKY )
|
|
2024-11-18
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
PMR critical motor LSR kiln and cooler
|
PMR critical motor LSR kiln and cooler. Clean up area and filter motor. Measure vibration, noise, and temperature free and load side. Add grease 10 time and 20 times free and load side ( AGUS & EVE IBNU )
|
|
2024-11-18
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
394-AS4
|
Lampu penerangan padam
|
Dilakukan penggantian lampu (Muslih, Deden)
|
|
2024-11-15
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Prepare spare part for job saturday and observation replace bearing motor 363 BC1
|
Prepare part for job at CCR and observation replace bearing motor 363 BC1 ( PENY & MUHAIMIN & 1 CIVACON )
|
|
2024-11-15
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-SC2-&-443-PH1-&-473-CC1
|
Install protection cover, support cable pre heater, dismantling or relocation part cable
|
Installing protection cover and support cable pre heater also dismantling cable at cooler ( FIRMAN & 4 CIVACON )
|
|
2024-11-15
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-2K1
|
Install temperature sensor
|
Installing temperature sensor at 483 2K1 room of analyzer ( RIZAL & MUHAIMIN & ANDRI )
|
|
2024-11-15
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER4
|
Investigation AUTO BALANCER trial from SLC NR2
|
Dismantling control AUTO Balancer install at ER4, test run around 10 minutes found trip breaker. Replace 2 card for control AUTO Balancer Nr1 test run found normal ( AGUS & RIZKY & JAJAT & ADI )
|
|
2024-11-14
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER4
|
AUTO balancer trip breaker or investigation problem. Documentation evidance
|
Dismantling control AUTO balancer set at work shop by Mr. Eko. Install back at ER4 result AUTO balancer back to normal ( AGUS & MUHAIMIN & JAJAT & EKO JUAN )
|
|
2024-11-14
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-EL1-&-443-PH1
|
Continue connection elevator & support cable PH & dismantling cable at cooler
|
Do connection cable elevator and support cable pre heater. Dismantling cable of cooler ( FIRMAN & 4 CIVACON )
|
|
2024-11-14
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
Repare or modified line cooling analyzer
|
Replace tubing cooling with spare tube. Test run analyzer found no leakage. Check parameter at display result still same ( ADI & RIZKY & ANDRI )
|
|
2024-11-13
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Prepare SOW and part material, relocation I/O blending, drawing bridge from ER6 to L3C RE1
|
Prepare SOW and part material. Relocation I/O blending, drawing bridge from L3C RE1 to ER6 ( AGUS & PENY )
|
|
2024-11-13
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1-AND-463-2K1
|
PMR service analyzer and observation upgrade PLC analyzer
|
PMR service analyzer. Clean up flange, sample line, filter probe, diaphragm pump, filter balston form dirty of coal, Check humidity sensor, replace filter with spare if found bad condition. Observation upgrade PLC analyzer at IKGA ( RIZAL & RIZKY & MUHAIMIN )
|
|
2024-11-13
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
PMR service critical motor area RM
|
PMR service critical motor area raw mill. Clean up area and filter motor. Measure vibration, noise, temperature free and load side motor. Add grease 10 times, 15 times ,and 20 times for free & load side motor ( PENY & EVE IBNU )
|
|
2024-11-13
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-EL1-&-443-PH1
|
Continue repare support cable rel FN and connection cable of elevator also dismantling cable
|
Connection cable elevator and dismantling cable also repare support rel cable FN ( FIRMAN & 4 CIVACON )
|
|
2024-11-13
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Complete data check sheet WBI Transformer month november 2024
|
COmpleting data check sheet WBI Transformer year 2023 month december, years 2024 month june and september. Scan documetnt file send to Mr. Jajat ( ADI & JAJAT )
|
|
2024-11-12
1 year ago
|
NR.EL-02
|
Muhammad Fakhri Kusnan
|
364-1R1
|
Level liquid low
|
Dilakukan penambahan air liquid (Haryanto, Melki, Muslih)
|
|
2024-11-12
1 year ago
|
NR.EL-02
|
Muslih
|
4D4-BL3
|
Lampu penerangan padam
|
Dilakukan penggantian lampu (Haryanto, Melki, Muslih)
|
|
2024-11-12
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMT service analyzer
|
PMR service analyzer. Clean up flange, probe, filter probe, sample line, diaphragm pump. filter balston from dirty of dust. Check filter humidity sensor, replace filter with spare if found bad condition ( RIZAL & RIZKY )
|
|
2024-11-12
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-EL1-&-443-PH1
|
Replace or modification cable elevator. Support PH and lighting lamp
|
Replace cable for elevator and support preheater also lighting lamp ( FIRMAN & 4 CIVACON )
|
|
2024-11-12
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1-AND-WORK-SHOP
|
CCTV 3rd floor and install heat exchanger IKGA
|
CCTV 3rd floor move direction to way of positive materials at 2nd floor. Install complete heat exchanger ( PENY & ADI & ANDRI )
|
|
2024-11-12
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
PMR service critical motor LSR cooler and kiln
|
PMR service critical motor LSR kiln and cooler. Clean up area and filter motor. Measure vibration, noise, temperature free and load side. Add grease 10 times and 20 times for free and load side motor ( AGUS & MUHAIMIN )
|
|
2024-11-11
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
Check auto balancer
|
Check auto balancer ( RIZAL & EVE IBNU )
|
|
2024-11-11
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
Check auto balancer
|
Check auto balancer ( RIZAL & EVE IBNU )
|
|
2024-11-11
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-EL1;-443-PH1
|
Replace or modification cable elevator. Support PH and lighting lamp
|
Replace cable elevator, support pre heater and lighting lamp ( PENY & ANDRI & 4 CIVA )
|
|
2024-11-11
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM-&-443-PH1
|
Prepare CCTV RM & PH, install to operator CCR
|
Prepare CCTV coal mill, preheater. Install at operator CCR ( AGUS & JAJAT & ANDRI )
|
|
2024-11-08
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
Install CCTV kiln inlet and pulling cable UTP from local to ER4 also configuration
|
Install CCTV, pulling cable UTP from local to ER4 continue configuration ( AGUS & JAJAT & FIRMAN & ANDRI )
|
|
2024-11-08
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Welding point prepare wiring and install panel welding
|
Prepare wiring at panel of welding ( PENY & ADI & RIZKY )
|
|
2024-11-08
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
CGA CEMS
|
CGA CEMS. Do calibration gas of MCS 100 E like O2, CO, CO2, SO2, CO, CO2 with span gas result ok ( RIZAL & RIZKY )
|
|
2024-11-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Drawing layout room operator CCR
|
Make drawing layout of operator room at CCR ( PENY )
|
|
2024-11-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
Relocation or prepare are shell cooling fan. Repare burn cable and relocation oanel
|
Relocation shell cooling fan and repare burn cable and relocation panel ( FIRMAN & ANDRI & PENY )
|
|
2024-11-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CCR-ENGINEERING-ROOM
|
observation or prepare engineering room become operator room for while
|
Observation preparing engineering room become operator room for while. Confirm with Mr.Muklas electric part needed ( PENY & ANDRI )
|
|
2024-11-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
CGA CEMS
|
CGA CEMS. Do calibration gas of MCS 100 E like CO. CO2, O2, SO2, NO and NO2 with span gases result ok ( RIZAL & RIZKY )
|
|
2024-11-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CCR
|
CCTV for coal mill still not clear picture
|
Check setting CTTV at CCR and clean up lens of CCTV at local result view picture clear ( AGUS & EVE IBNU )
|
|
2024-11-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
Reading O2 fluctuation and spike
|
Service analyzer. Clean up flange, probe, filter probe from dirty of dust. Increase pressure for purging because found purging is not strong enough. After increase pressure purging reading O2 become to normal between 2% until 3.23% than before reading O2 until 5% to 6% ( ADI & RIZKY )
|
|
2024-11-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-PF1
|
Repare grounding point are CM and lighting at room pfister blinking
|
Repare grounding point area coal mill and replace lighting with spare test on result ok ( PENY & RIZKY & ANDRI )
|
|
2024-11-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-&-CCR
|
CCTV problem can not see picture
|
Setting CCTV at work shop and CCR result can see actual picture ( AGUS )
|
|
2024-11-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
CGA CEMS
|
CGA CEMS. Do calibration gas of MCS 100 E like CO, CO2, O2, SO2, NO. and NO2 with span gas result ok ( RIZAL )
|
|
2024-11-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HEAT-AXCHANGER-FAN-IKGA-&-TYRE-1--463-KL1
|
Continue install heat exchanger motor also test leakage and dismantling unuse cable
|
Install heat exchanger IKGA and do test leakage found 1 spot leakage. Dismantling unuse cable at trye 1 kiln ( ADI & FIRMAN & EVE IBNU )
|
|
2024-11-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
SHELL-COOLING-FAN-9-&-12
|
Install cable for fan
|
installing cable power for shell cooling fan 9 & 12 ( PENY & FIRMAN & ANDRI )
|
|
2024-11-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FA1,-FA2,-FA3,-FA6,-FA7,-FA8,-FA9
|
AUTO grease motor low level
|
Replace AUTO grease motor with high level ( AGUS )
|
|
2024-11-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
Install heat exchanger. prepare support leader PH
|
Install heat exchanger, test run motor measure vibration, noise result ok. Install support leader PH ( ANDRI & FIRMAN )
|
|
2024-11-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1-
|
PMR service analyzer
|
PMR service analyzer. Clean up flange, filter probe, sample line, diaphragm pump, filter balston from dirty of coal Check humidity sensor replace filter if found bad condition ( RIZAL )
|
|
2024-11-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-EL1
|
PMR service elevator and WBI sump pump
|
PMR service elevator and sump pump. Clean up elevator every floor and 8th floor VSD room. Test run elevator every floor. Result ok. WBI sump pump ( PENY )
|
|
2024-11-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
PMR service critical motor and LSR kiln and cooler
|
PMR service critical motor LSR kiln and cooler. Clean up area and filter motor. Measure vibration, noise and temperature free and load side motor. Add grease 15 times and 20 times free and load side motor ( AGUS )
|
|
2024-11-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Prepare ISO 9001; check schedule and actual planning calibration also result; form inspection
|
Check schedule and actual calibration also result ( ADI & RIZKY )
|
|
2024-11-04
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1
|
Replace carbon brush
|
Replace carbon brush motor ( PENY )
|
|
2024-11-04
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1-
|
PMR critical motor raw mill and coal mill
|
PMR service critical motor raw mill and coal mill. Clean up area and filter motor. Measure vibration, noise and temperature free and load side motor. Add grease 10 times and 15 times for free and load side motor ( AGUS & EVE IBNU )
|
|
2024-11-04
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
Reparire or replace piping and tidy up line sample
|
Replace tubing and tidy up line sample ( RIZAL & ANDRI )
|
|
2024-11-01
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Replace bearing 393 FA5 and motor heat ex changer IKGA
|
Replace bearing motor, test on result ok continue repainting blue color. Service motor heat ex changer replace bearing 32062 each, repainting blue color also service grille heat ex changer use air supply and water result ok wrapping grille ( PENY & ADI & FIRMAN )
|
|
2024-11-01
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
CCTV setting IP address
|
Setting IP address for CCTV work shop. Result view picture ok ( AGUS )
|
|
2024-11-01
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CCTV-BURNER
|
Clean up and check view
|
Clean up and check view at CCR. Result ok ( RIZAL & ANDRI )
|
|
2024-10-31
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-CT1
|
Dislodged level CT
|
Dislodged level CT ( ADI & FIRMAN )
|
|
2024-10-31
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-AND-L63-RM1
|
Camera CTTV view problem
|
Service camera at kiln and reject coal mill ( RIZA & ANDRI & JAJAT )
|
|
2024-10-31
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
413-3B1-PG1-&-443-PH1-2ND-FLOOR
|
Fabrication cover solenoid valve PG and support cable at 2nd floor pre heater
|
Fabrication cover s/v, installing cover PG. Make support cable at 2nd floor pre heater ( RIZAL & ANDRI )
|
|
2024-10-31
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-GC1
|
Dismantling unuse cable, tubing and pipe
|
Dismantling pipe, unuse cable and tubing at grate cooler ( ADI & FIRMAN )
|
|
2024-10-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-EL1
|
Observation prepare replace cable power of elevator
|
Observation replacing cable power elevator ( AGUS & FIRMAN )
|
|
2024-10-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
413-3B1-&-3B2
|
Install cover PG of solenoid valve
|
Installing cover solenoid valve for PG ( ANDRI & FIRMAN )
|
|
2024-10-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1-
|
PMR service analyzer
|
PMR service analyzer. Clean up flange, filter probe, sample line, filter balston, diaphragm pump from dirty of coal. Check humidity sensor, replace filter if found bad ( PENY & ADI )
|
|
2024-10-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-EL1
|
Stand bye
|
Top and bottom side ( PENY & AGUS )
|
|
2024-10-29
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-CC1
|
Observation cleaning cable tray
|
Observation cleaning cable tray at cooler ( ADI )
|
|
2024-10-29
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
PREPARE-SOW
|
Moving I/O west & east blending to ER4 also compressor. Bridge ER6 to L3C RE1
|
Prepare SOW for job moving I/O west & east blending to ER4 & compressor. Also bridge ER6 to L3C RE1 ( AGUS & PENY & FIRMAN )
|
|
2024-10-29
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-AND-443-2K1
|
PMR service analyzer
|
PMR service analyzer. Clean up flange, probe, filter probe, sample line, diaphragm pump, filter balston from dirty of dust. Check humidity sensor replace filter if found bad condition. Tidy up plastic line cable tray ( RIZAL & ANDRI )
|
|
2024-10-29
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
SWITCH-GEAR
|
Clean area switch gear from grass
|
Clean up area switch gear from grass ( JAJAT & RIZAL & PENY & AGUS & ADI & IMAN & ANDRI & FIRMAN )
|
|
2024-10-28
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-BF1
|
Check 1 solenoid valve abnormal, replace module
|
Check at side, functional solenoid valve are ok. Replace module bag filter test functional ok ( PENY & ANDRI )
|
|
2024-10-28
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L62-2K2
|
Install temperature sensor
|
Installing temperature sensor, pulling cable power and signal to I/O panel, test on power result temperature show 26 degree ok ( ADI & FIRMAN )
|
|
2024-10-28
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-AND-473-FA1,FA2,FA3
|
PMR service critical motor LSR kiln and cooler also grease low at fan cooler
|
PMR service critical motor LSR kiln and cooler, clean up area also filter motor. Measure vibration, noise and temperature free and load side motor. Add grease 10 times and 15 times for free and load side motor. Add grease for fan cooler ( AGUS )
|
|
2024-10-28
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
413-PF1-TPM
|
completing data dash board for safety, FI
|
Completing data dash board TPM for safety and focus improvement ( RIZAL )
|
|
2024-10-25
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
413-PF1-TPM-
|
Clean up area TPM, completing data report FI
|
Clean up area TPM 413 PF1, and completing data dash board for safety, FI ( RIZAL & ANDRI & RIZKY & PENY & ADI & JAJAT )
|
|
2024-10-25
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-FA5A
|
Motor noise
|
Replace bearing motor 6208 ZZ 2 each ( PENY )
|
|
2024-10-25
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Cek and completing data PMR and WBI month of october 2024
|
Completing data PMR also WBI month of october 2024 ( ADI )
|
|
2024-10-25
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
Dismantling part kiln and install cover motor
|
Dismantling part kiln and installing cover motor ( FIRMAN & 4 CIVACON )
|
|
2024-10-24
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-3B1
|
Install cover motor
|
Installing cover motor ( FIRMAN & 4 CIVACON )
|
|
2024-10-24
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-2K1-&-393-FA-5A
|
Install temperature sensor and monitoring vibration
|
Installing temperature sensor and monitoring vibration ( AGUS & FIRMAN )
|
|
2024-10-24
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1-&-463-2K1
|
PMR service CEMS and monitoring leaked at IKGA
|
PMR service CEMS, clean up filter purge air unit, swivel window T/R & R, filter cabinet MCS 100 E, CEMS room and gas room. Monitoring leaked at IKGA ( RIZAL & ANDRI )
|
|
2024-10-24
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
413--PF1-TPM-ASSESTMENT
|
Clean up area fan and write file safety
|
Clean up area fan and and make 2 file of safety at fan also print out for completing data safety at dash board TMP ( RIZAL & RIZKY & ADI )
|
|
2024-10-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-FAA
|
Continue addressing K,T,D R slide gate
|
Addressing K-T-D-R for slide gate ( PENY & FIRMAN & 4 CIVACON )
|
|
2024-10-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
PMR service critical motor and LSR RM also CM
|
PMR service critical motor & LSR area RM also CM. Clean up area and filter motor. Measure vibration, noise and temperature free and load side motor. Add grease 10 times and 15 times for free and load side motor ( AGUS )
|
|
2024-10-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-AND-443-2K1
|
PMR service analyzer
|
PMR service analyzer. Clean up probe, flange, filter probe, sample line, diaphragm pump. filter balston from dirty of dust. Check humidity sensor replace filter with spare if found bad condition. Replace probe and heat exchanger at 463 2K1 ( RIZAL & ANDRI & 3 CIVACON )
|
|
2024-10-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1-
|
PMR service analyzer
|
PMR service analyzer. Clean flange, filter probe, sample line, diaphragm pump, filter balston from dirty of coal. Check humidity sensor, replace filter if found bad condition ( RIZKY )
|
|
2024-10-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-MECHANIC
|
Inspection electrical and welding tools
|
Inspection electrical and welding tools of mechanic Nr1. Repaire cable for welding machine information cable is bad connection often trip when use that equipment result after service ok ( ADI )
|
|
2024-10-22
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-FA9;-473-CC1;-493-3S1;-413-3S1-3S2
|
Continue install tandem motor, pulling cable cooler, install cover motor and sealing I/O panel blending
|
Installing tandem motor, pulling cable cooler, installing cover motor and sealing I/O panel ( PENY & FIRMAN & 4 CIVACON )
|
|
2024-10-22
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
PMR service critical motor and LSR KILN & COOLER
|
PMR service critical motor & LSR kiln and cooler. Clean up area and filter motor. Measure vibration, noise and temperature free and load side. Add grease 10 times and 15 times for free and load side motor ( PENY )
|
|
2024-10-22
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-3S1;-473-CC1;-463-KL1;-443-PH1;-L63-CM1;-363-RM1;-FEED-BIN
|
Inspection electrical and welding yellow color belong to contractor and company Nr1
|
Inspection electrical and welding tools belong to contractor and company. Repaire cable input for extention cable at kiln. Make 2 label un proper electrical tools of company. Write at form inspection tools ( ADI & RIZKY )
|
|
2024-10-21
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1-6TH-FLOOR-AND-4TH-FLOOR
|
Dismantling cooling fan and observation air lancing cyclone 3
|
Dismantling cooling fan and observation air lancing cyclone 3 ( RIZAL & RIZKY & ANDRI )
|
|
2024-10-21
1 year ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
393-FA9,-413-BS1-413-BS1-493-BS1
|
Continue install tandem motor, support project cleaning and install cover motor, install seal panel I/O
|
Installing tandem motor and cover motor also seal I/O panel blending ( PENY & FIRMAN & 4 CIVACON )
|
|
2024-10-21
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-MECHANIC
|
Inspection electrical and welding tools
|
inspection electrical and welding tools of mechanic nr1 with yellow color ( ADI )
|
|
2024-10-18
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-FA9
|
Prepare LCS and accessories and cable 6P x 0.75 mm
|
Prepare LCS and cable 6P x 0.75 mm at work shop. Install at site ( PENY & FIRMAN )
|
|
2024-10-18
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1-8TH-FLOOR
|
Observation problem at wince
|
Observation problem at wince. Test operational ok. Brake gap 3mm. Use no load sliding around 1 M. Brake gap under 3mm canvas smoke ( AGUS )
|
|
2024-10-18
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-PU1
|
Install pneumatic valve test
|
Installing pneumatic valve at site. Test open and close from CCR. result ok ( RIZAL & ANDRI )
|
|
2024-10-18
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1-3RD-FLOOR
|
Air lancing observation activation
|
Check at side found there are air supply and cable power. Check at I/O panel 4th floor cable is ready. Advise install panel for relay at beside panel I/O 4C1-2RB-75 ( JAJAT & ADI )
|
|
2024-10-17
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Prepare or reinstall CCTV
|
Prepare CCTV and install at work shop ( AGUS )
|
|
2024-10-17
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG-LAMP
|
Observation reactivation timer for lamp
|
Set timer of lamp. OFF 6.00 AM ON 5.00 PM ( AGUS )
|
|
2024-10-17
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Bring motor RTS to ware house
|
Bring motor from work shop to ware house RTS. Write data at computer as Data RTS Motor Electrical Narogong Plant ( PENY & IMAN )
|
|
2024-10-17
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-PV1
|
Observation proportional valve
|
Test proportional valve at work shop. Result ok. Installing proportional valve at site ( RIZAL & ANDRI )
|
|
2024-10-17
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L3C-RE1-
|
Install temperature sensor at ER6
|
Installing temperature sensor at ER6. Pulling cable power and indication at ER6 ( ADI & FIRMAN )
|
|
2024-10-16
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Prepare BOQ for job I/O blending to ER4
|
Prepare BOQ job I/O blending to ER4 ( AGUS )
|
|
2024-10-16
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-BC5
|
Check functional of sump pump information often trip
|
Check functional of sump pump, open pipe way of sump pump clean with water. Result ok suspected sump pump motor need to be replaced with spare motor. Take motor spare from electrical 2 warehouse test at workshop result ok. Install motor sump pump at site test run result ok ( AGUS & ANDRI)
|
|
2024-10-16
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Motor RTS
|
Bring motor from work shop to ware house as RTS equipment ( PENY & WAWAN CIVACON )
|
|
2024-10-16
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Name TAG tools electrical and welding
|
Inspection electrical and welding tools of electrical Nr1. Add connector male and female power at extention cable. Tag yellow color at tools ( ADI )
|
|
2024-10-16
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR service CEMS
|
PMR service CEMS. Clean up filter purge air unit, swivel window T/R & R of dust hunter, alignment dust hunter, transducer A & B of flowsic, filter cabinet MCS 100 E, gas room of CEMS room and CEMS room ( RIZAL )
|
|
2024-10-15
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1-
|
Repaire lamp cable at floor of coal mill
|
Repaire cable lamp at floor coal mill. Test on lamp result ok lamp on ( FIRMAN & ANDRI )
|
|
2024-10-15
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
PMR service critical motor and LSR KILN & COOLER
|
PMR service critical motor and LSR kiln also cooler. Clean up area and filter motor. Add grease 15 times and 20 times for free and load side motor ( AGUS )
|
|
2024-10-15
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-AND-443-2K1
|
PMR service analyzer
|
PMR service analyzer. Clean up flange, probe, filter probe, sample line, diaphragm pump filter balston from dirty of dust. Check filter humidity sensor, replace filter with spare if found bad condition ( ADI & RIZKY )
|
|
2024-10-15
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1-STOP
|
Replace RTD sensor
|
Replace RTD sensor at coal mill. Reading at CCR result ok ( RIZAL & ANDRI )
|
|
2024-10-14
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-FA1,FA2,FA3
|
Pulling cable motor
|
Pulling cable motor ( 4 CIVACON )
|
|
2024-10-14
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1-AND-WORK-SHOP
|
Repair way of lamp and pulling UTP from I/O RM to work shop
|
Repair way of lamp at coal mill and pulling UTP from I/O panel 363 RM1 to work shop ( RIZAL & ANDRI & FIRMAN )
|
|
2024-10-14
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
PMR service critical motor LSR RM-CM
|
PMR service critical motor LSR RM & CM. Clean up area and filter motor. Measure vibration, noise and temperature free and load side motor. Add grease 10 times and 15 times2 free and load side motor ( AGUS & RIZKY )
|
|
2024-10-14
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Arrange data spare part
|
Arrange data spare part, write at computer as name template spare part A ( ADI )
|
|
2024-10-11
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-FA5-A
|
Replace motor
|
Replace motor at site. Test run from CCR ( PENY & JAJAT & ANDRI & FIRMAN )
|
|
2024-10-11
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WARE-HOUSE-ELECTRIC-NEAR-ER5
|
Continue tidy up spare part
|
Tidy up spare part at ware house electric near ER5 ( FIRMAN & ANDRI & 4 CIVACON )
|
|
2024-10-11
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Continue activation CCTV & tidy up spare part
|
Activation CCTV and tidy up spare part also write at computer as name template spare part A ( AGUS & ADI )
|
|
2024-10-11
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR service analyzer
|
PMR service analyzer. Clean up flange, filter probe, sample line, diaphragm pump, filter balston , dryer gas from dirty of coal ( RIZAL & RIZKY )
|
|
2024-10-10
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER5-AND-CLINKER-SILO
|
Support work at ER5 and install cover motor clinker silo
|
Support work at ER% and installing cover motor at clinker silo ( FIRMAN & ANDRI & 4 CIVACON )
|
|
2024-10-10
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
IR-TAD,-T-SCANNER,-CCTV-AND-PYROMETER
|
PMR service
|
PMR service temperature IR TAD, T_scanner, CCTV and pyrometer. Clean lens, and flange ( RIZKY )
|
|
2024-10-10
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
Observation spike O2 at IKGA
|
Observation spike for O2 ( RIZAL )
|
|
2024-10-10
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-443-PH1-&-L63-RM1
|
Observation recondition and rewinding motor
|
Observation recondition and rewinding motor ( PENY & AGUS )
|
|
2024-10-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER5-&-MOTOR-AREA-CLINKER
|
Tidy up spare part and motor
|
Tidy up spare part and motor ( FIRMAN & 4 CIVACON )
|
|
2024-10-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
PMR service critical motor LSR cooler
|
PMR service critical motor LSR cooler ( AGUS )
|
|
2024-10-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-CV1
|
Observation speed indication
|
Observation speed indication found cable peeled off, make cover cable. Result ok ( PENY & ANDRI )
|
|
2024-10-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1-AND-REPLACE-TE-463-KL1-T1-FABRICATION
|
PMR service analyzer and reading temperature abnormal
|
PMR service analyzer, clean up flange, probe, filter probe, sample line, diaphragm pump, dryer gas from dust. Replace TE at 463 KL1 T1 ( RIZKY & EVE RIVAL )
|
|
2024-10-08
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-FA5-A
|
Replace bearing, install after mechanic cleaning blade
|
Replace motor. Connect power ( AGUS & FIRMAN )
|
|
2024-10-08
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
TIDY UP SPARE PART
|
Tidy up spare part. Write at computer as template sparepart A ( ADI & EVE RIVAL )
|
|
2024-10-08
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
413-3B1,-473-CC1,-493-3S1
|
WBI eletrical & instrumentation I/O sump pump
|
WBI electrical and instrumentation I/O sump pump area bottom blending, cooler, clinker silo. Measure vibration, noise and temperature free and load side motor ( RIZKY )
|
|
2024-10-08
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
TRUBA-JAGA-CITA
|
Inspection electrical and welding machine
|
Inspection electrical and welding machine ( ADI )
|
|
2024-10-08
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
413-RV1
|
Failure indication
|
Replace sensor transducer. Test open and close from CCR, result ok ( PENY & EVE RIVAL )
|
|
2024-10-07
1 year ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
443-EL1
|
PMR service elevator and sump pump E1
|
PMR service elevator. Clean up elevator room every floor and safety device of elevator make sure work normal also clean 8th floor VSD of elevator. Test run from 8th floor to 1st floor result ok ( PENY & RIZKY )
|
|
2024-10-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1,-443-PH1,-L63-RM1
|
Observation recondition motor for over haul 2025
|
Observation recondition motor for over haul 2025 ( AGUS & PENY & RIZKY )
|
|
2024-10-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
PMR service critical motor LSR RM-CM
|
PMR service critical motor LSR RM-CM. Clean up area and filter motor. Measure vibration, noise and temperature free and load side. Add grease from 15 times and 20 times at free and load side motor ( AGUS )
|
|
2024-10-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Tidy up spare part inside room
|
Tidy up spare part inside room of electric. Write at computer as template sparepart A ( ADI )
|
|
2024-10-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Inspection electrical and welding machine of mechanic NR1
|
Inspection electrical tools of mechanic nr1 also tagging yellow color ( ADI & ANDRI )
|
|
2024-10-04
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Tidy up spare part
|
Write name of spare part continue tidy up. Write name of spare part at computer as template part ( ADI & EVE RIVAL )
|
|
2024-10-04
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
INSTALL-CAMERA
|
Activated camera
|
Installing camera and do activated ( AGUS & FIRMAN & EVE IQBAL )
|
|
2024-10-04
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L3C-HP1
|
Repaire seat start button and observation recondition motor
|
Repaire seat of start button. Test result ok. Observation motor recondition ( PENY & RIZKY )
|
|
2024-10-04
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
Observation hydrogen ( H2 ) leaked
|
Check at regulator result leaked right there. Replace regulator with spare ( RIZAL & ANDRI )
|
|
2024-10-03
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Check and completing data WBI also PMR month september 2024 and tidy up spare part
|
Completing data WBI & PMR month of september 2024. Tidy up spare part room and data name of part save at computer as template part ( ADI & EVE RAKA )
|
|
2024-10-03
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1,-443-PH1,-L63-RM1
|
Observation motor for recondition OH 2025
|
Observation motor for recondition OH 2025 ( PENY & RIZKY & EVE RIVAL )
|
|
2024-10-03
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR service analyzer
|
PMR service analyzer. Clean up flange, filter probe, sample line, diaphragm pump, dryer gas from dirty of coal. Check humidity sensor, replace filter if found bad ( RIZAL & EVE IQBAL )
|
|
2024-10-03
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
PMR service critical motor LSR RM & CM
|
PMR service crtitical motor LSR RM & CM. Measure vibration, noise and temperature FS & LS motor. Add grease 10 & 15 times for FS & LS motor ( AGUS )
|
|
2024-10-02
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Completing data spare part
|
Completing data spare part and save at computer ( ADI & EVE RAKA )
|
|
2024-10-02
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
413-BF1
|
CHeck solenoid valve ubnormal
|
Replace tubing s/v ( RIZAL & ANDRI & FIRMAN )
|
|
2024-10-02
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WELDING-PANEL-BURNER-FLOOR
|
Replace ELCB
|
Replace ELCB ( AGUS & PENY )
|
|
2024-10-02
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
SUPPORT-FEED-ON-KILN
|
Support feed on area RMK
|
Support feed on kiln area RMK ( ALL CREW )
|
|
2024-10-01
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FN7
|
Replace motor M2 and tacho meter
|
Replacing motor 473 FN7 M2 and tacho meter. test run motor result ok ( PENY & ADI & FIRMAN & IMAN )
|
|
2024-10-01
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FN7-&-463-MD1
|
Clean up motor and filter
|
Clean up area and filter motor also carbon brush room. Measure long of carbon brush result long all carbon brush still ok ( AGUS & PENY & RIZKY )
|
|
2024-10-01
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CAMERA-KILN-&-483-PF1
|
Stand by monitor camera kiln and check position counter weigh or oil drum and reponse load cell
|
Stand by monitor camera kiln (pyrometer ) and check counter weigh position or oil drum and do check response load cell ( RIZAL & ANDRI & EVE IQBAL )
|
|
2024-10-01
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Replace bearing motor and test run motor
|
Replace bearing motor, before clean up area shaft motor. Refill oil motor and test run motor result aproximately 2.1 A. Install at site ( PENY & ADI & RISKY & EVE RIVAL )
|
|
2024-09-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-RF6
|
Service motor
|
Dismantle motor from site, service motor at work shop. Measure with megger result resistance R-S-T 2000 M Ohm. Refill oil 320, test on motor no load, measure ampere around 3.7 A - 3.5 A ( PENY & ADI & FIRMAN )
|
|
2024-09-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CAMERA-PYROMETER-&-453-PF1
|
Service camera burner and stand by monitor pfister feeder
|
Servicing camera burner pyrometer, clean up lens inside camera install back at site and stand by pfister feeder ( RIZAL & ANDRI & EVE RAKA )
|
|
2024-09-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-CT1
|
Relocation horn
|
Relocation horn at CT ( FIRMAN & EVE IQBAL )
|
|
2024-09-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
SUPPORT-BLACK-OUT-
|
Support black out at ER3, ER4 and ER5
|
Support black out at ER3, ER4 and ER5 ( ALL CREW of electrical )
|
|
2024-09-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Completing TAG WBI & PMR
|
Completing TAG WBI & PMR ( ADI & EVE RIVAL )
|
|
2024-09-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
MAIN-GATE-ACCES-CONTRO
|
Inspection electrical and welding tools of RMP
|
Inspection electrical and welding tools of RMP, write at form inspection ( ADI & EVE RIVAL )
|
|
2024-09-29
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
453-PF1
|
Calibration pfister feeder
|
Check condition oil pfister feeder, clean up area motor, load cell. Do calibration pfister feeder zero and span ( RIZAL & IMAN )
|
|
2024-09-29
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SC3
|
Relocation cable motor
|
Relocation cable motor ( PENY & FIRMAN )
|
|
2024-09-29
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
move ex box WBI & PMR year 2015 to 2019 to warehouse of electric near ER5
|
Move ex box of WBI & PMR 2015 to 2029 to warehouse electric near ER5 ( ADI & IMAN )
|
|
2024-09-29
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
413-3S1-&-3S2-&-463-WP-ROOM
|
Clean up I/O panel
|
Clean up I/O panel from dirty of dust use hand blower. Use isolation to protect unuse cable at panel I/O panel ( ADI & JAJAT )
|
|
2024-09-27
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
Continue installation filter CEMS
|
Replacing filter for instrument air supply ( RIZAL & EVEIQBAL )
|
|
2024-09-27
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
Service analyzer
|
Service analyzer. Clean up flange, probe, filter probe, sample line from dirty of dust ( RIZAL & EVE IQBAL )
|
|
2024-09-27
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1-
|
WBI welding and lighting panel
|
WBI welding and lighting panel are coal mill ( FIRMAN & EVE IQBAL )
|
|
2024-09-27
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Completing file spare part and name form of WBI-PMR
|
Completing file spare part and name form of WBI & PMR ( RIZKY & ADI )
|
|
2024-09-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR service CEMS
|
PMR service CEMS analyzer. Clean up filter purge air unit. transducer A & B flowsic 100, swivle window T/R & R dust hunter also alignment dust hunter, clean up filter cabinet MCS 100 E and gas room ( RIZAL & ANDRI )
|
|
2024-09-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-3B1-&-3B2
|
Install cover motor area blending silo
|
Installing cove motor area blending silo ( WIKAN & HENDRIK & ENDEN CIVACON )
|
|
2024-09-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
PMR service critical motor and LSR
|
PMR service critical motor and LSR. Clean up area and filter motor. Measure vibration, noise and temperature free and load side motor. Add grease 10 and 15 times for free and load side motor ( AGUS & EVE RAKA )
|
|
2024-09-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-FN1-&-433-RF1
|
Replace LCS
|
Replace part at LCS ( AGUS & FIRMAN & EVE IQBAL )
|
|
2024-09-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Completing file spare part and clean up room of spare part
|
Clean up room of spare part and make file also print out spare part table. Install at spare part room ( ADI & RIZKY )
|
|
2024-09-25
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
4W3-INT-&-3W3-IN1-ROOM-WEIGH-FEEDER-CONTROL
|
Repaire AUDIT finding
|
Repaire AUDIT finding ( RIZAL & ANDRI & EVE IQBAL )
|
|
2024-09-25
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
3W3-IN8-IN6-&-INB
|
Repaire AUDIT finding
|
Repaire AUDIT finding ( AGUS & FIRMAN & EVE RAKA )
|
|
2024-09-25
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Completing data WBI & PMR, sorting spare part, HAC
|
Completing HAC & data WBI also PMR service motor area Raw Mill and Kiln month of July to September 2024. Sorting spare part ( ADI & EVE RIZKY )
|
|
2024-09-24
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Fabrication cover motor area blending silo
|
Fabrication cover motor area blending silo ( HENDRIK & WIKAN & ENDEN CIVACON )
|
|
2024-09-24
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Fabrication box panel and install CCTV
|
fabrication tool panel and install CCTV ( FIRMAN & ANDRI )
|
|
2024-09-24
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-
|
Completing data WBI & PMR, clean up spare part
|
Clean up spare part with vacuum cleaner and completing data WBI: Crane & Hoist, Electrical & Instrumentation area Feed Bin, Top & Bottom Blending, Pre Heater, Kiln, Cooler Clinker Silo & PMR: Analyzer Kiln, Pre Heater, Coal Mill, CEMS form month July until September 2024 ( ADI & EVE RIZKY )
|
|
2024-09-24
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER4-&-ER5
|
Check for ISO 45000
|
Check electric room for ISO 4500 ( AGUS )
|
|
2024-09-24
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-AND-443-2K1
|
PMR service analyzer
|
PMR service analyzer. Clean up flange, probe, filter probe, sample line, diaphragm pump, filter balston , dryer gas from dirty of dust. Check filter humidity sensor, replace filter if found bad condition ( RIZAL & EVE IQBAL )
|
|
2024-09-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SC1
|
Move position LCS
|
Move position of LCS motor ( RIZAL & ANDRI & EVE RAKA )
|
|
2024-09-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L3A-BC1
|
Check condition motor due oil leakage
|
Dismantle motor, measure seal of motor replace seal with spare ( FIRMAN & EVE RIZKY & EVE IQBAL)
|
|
2024-09-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-MD1-M1
|
Clean up carbon brush
|
Clean up area motor , filter, carbon brush room from dirty of dust. Measure long of every carbon brush result still ok. Retighten every carbon brush ( AGUS & ADI )
|
|
2024-09-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
413-3S1-&-3S2
|
Clean up area motor
|
Clean up area motor. Fabrication cover motor at blending ( HENDRIK-WIKAN-ENDEN CIVACON )
|
|
2024-09-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-LQ3-M1
|
Check motor condition due vibration and noise too high
|
Check condition motor at local, found need realignment motor to make normal vibration and noise. Make alignment motor. Test run motor, measure vibration and noise, result normal ( ADI & EVE RIZKY & FIRMAN )
|
|
2024-09-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
WBI panel welding and lighting
|
WBI panel welding and lighting ( FIRMNA & EVE IQBAL )
|
|
2024-09-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
Install cove and completing piping
|
Installing cove and completing piping at analyzer ( RIZAL & ANDRI )
|
|
2024-09-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
PMR critical motor, LSR Raw Mill & Coal Mill
|
PMR service critical motor, LSR R/M & CM. Clean up area motor, filter motor. Measure vibration, noise and temperature free and load side motor. Add grease 10 times to 15 times for free and load side motor ( AGUS & EVE RAKA )
|
|
2024-09-20
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
House keeping area inside
|
House keeping area inside work shop. Move panel spare part to inside room of team leader. Throw away un use spare part. Also move panel document to near table of team leader, Tidy up table and panel book at meeting room. Keep 10 box of document to ware house electric ER5 ( All crew )
|
|
2024-09-18
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Prepare BOQ for relocation I/O to ER4
|
Prepare BOQ for relocation I/O to ER4 ( AGUS )
|
|
2024-09-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR service analyzer
|
PMR service analyzer. Clean up flange, filter probe, sample line diaphragm pump, filter balston, dryer gas from dirty of coal. Check humidity sensor, replace filter if found bad condition ( AGUS )
|
|
2024-09-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FN5
|
Refill memolube
|
Refill memolube ( AGUS )
|
|
2024-09-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
Fabrication cover pneumatic
|
Fabrication cover pneumatic. Install at site ( RIZAL & EVE RIZKY )
|
|
2024-09-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER5-
|
Replace battery UPS
|
Replacing around 18 battery UPS at ER5 ( PENY & ADI & FIRMAN & ANDRI & EVE RAKA & EMIS & IMAN )
|
|
2024-09-18
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER5
|
Replace battery UPS take 1 from ER2
|
Take battery UPS from ER2 bring to ER5 ( PENY & FIRMAN & EVE RIZKY )
|
|
2024-09-18
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Service lighting lamp off at L3C RE1
|
Service lighting lamp off at L3C RE1, test on result ok ( ANDRI & FIRMAN )
|
|
2024-09-18
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
WBI electric and instrumentation Input/Output panel
|
WBI electric and instrumentation I/O panel ( RIZAL & EVE RAKA )
|
|
2024-09-18
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
Analyze problem analyzer
|
Analyze problem at analyzer ( RIZAL & EVE RAKA )
|
|
2024-09-17
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
433-M33-WP1
|
Install relay lighting
|
Installing relay for lighting ( FIRMAN & ANDRI )
|
|
2024-09-17
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SCA
|
Check motor noise and vibration
|
Tighten base nut. result noise reduce but vibration still exist ( PENY & FIRMAN )
|
|
2024-09-17
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-AND-443-2K1
|
PMR service analyzer
|
PMR service analyzer. Clean up flange, probe, filter probe, sample line, diaphragm pump. dryer gas from dirty of dust. Check humidity sensor, replace filter if found bad condition ( RIZAL & EVE RIZKY )
|
|
2024-09-17
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
Dismantling or relocation cable at 7th floor
|
Dismantling un use cable at 7th floor. Throw away at rubbish bin bring to ground floor ( AGUS & ADI & ANDRI )
|
|
2024-09-13
1 year ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
473-FA3
|
Add grease motor
|
Add grease for free and load side motor ( FIRMAN & ANDRI )
|
|
2024-09-13
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-GQ1
|
WBI bottom blending, cooler, clinker silo, kiln
|
WBI bottom blending, cooler, clinker silo and kiln. Clean up area motor, measure vibration, noise and temperature free and load side motor ( PENY )
|
|
2024-09-13
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1-
|
PMR service analyzer
|
PMR service analyzer. Clean up flange, filter probe, sample line, diaphragm pump, dryer gas, filter balston from dirty of coal. Check humidity sensor, replace filter if found bad condition ( AGUS & EVE RIZKY )
|
|
2024-09-13
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG
|
Clean up filter
|
Clean up area and filter HRG use instrument air supply. Fill in water RO, do sirculation water aorund 30 minutes. Jumper cable for indication low level for make can start pump ( JAJAT & ADI )
|
|
2024-09-12
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1-
|
Install auto drain
|
Installing auto drain ( RIZAL & EVE RIZKY )
|
|
2024-09-12
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
WBIGCT, PH,KILN
|
WBI area GCT, Pre Heater, and kiln. Clean up are motor, measure vibration, noise and temperature free and load side motor ( AGUS & EVE RAKA )
|
|
2024-09-12
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-RE1-
|
Replace lighting lamp at north side
|
Take out lighting lamp at north side, bring to work shop ( FIRMAN & ANDRI )
|
|
2024-09-12
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
WBI feed bin, RM, BF
|
WBI feed bin, RM, bag filter. Clean up area AC1, AC2, WF1-WF4 from dirty of dust use instrument air. Measure vibration, noise and temperature free and load side motor ( ADI )
|
|
2024-09-12
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L3C-RE1
|
Replace lighting lamp pole north side
|
Replacing lighting lamp at pole north side. Test on result ok lamp on ( ANDRI & FIRMAN )
|
|
2024-09-12
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR service CEMS
|
PMR service CEMS. Clean up filter purge air unit, transducer A & B flowsic, swivel window T/R & R dust hunter also alignment dust hunter, filter cabinet MCS 100 E, gas room CEMS from dirty of dust ( RIZAL )
|
|
2024-09-12
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-PM-STOP
|
Check and service carbon brush
|
Clean up area and carbon brush. Measure long carbon brush ( AGUS & EVE RIZKY & EVE RAKA )
|
|
2024-09-12
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-BF1,-493-GF2,-493-BF3,493-BF4,-493-BF5
|
Cross check functional bag filter and measure ampere motor
|
Cross check functional bag filter and measure ampere motor ( PENY )
|
|
2024-09-10
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-WP
|
Check panel lighting can not stop if already start
|
Check at location, found lighting lamp off. test start button result lamp on, when stop lamp off. Test functional timer, set actual hour lamp off. Result timer and relays are ok. Set timer on lighting lamp at 5 PM, set off lighting lamp at 7 AM ( EMIS & ADI & EVE RIZKY )
|
|
2024-09-10
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
Cross check bag filter 363 BF1, 393 BF1, 393 BF2, 393 BF3, & 423 BF1
|
Cross check functional bag filter and measure ampere motor bag filter ( RIZAL & ANDRI )
|
|
2024-09-10
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
Cross check bag filter 413 BF1, 413 BF2, 413 BF3, 433 BF1 & 483 BF1
|
Cross check functional bag filter also measure ampere motor bag filter ( PENY & FIRMAN )
|
|
2024-09-10
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG
|
Clean up area and filter
|
Clean area and filter from dirty of dust use instrument air ( ADI & EVE RIZKY )
|
|
2024-09-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
FEED-BIN
|
Data recondition motor
|
Make data for recondition motor area feed bin ( PENY & EVE RIZKY )
|
|
2024-09-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-AND-443-2K1
|
PMR service analyzer and reading O2 abnormal
|
PMR service analyzer. Clean up flange, probe, filter probe, sample line, diaphragm pump. filter balston, dryer gas form dirty of dust. Service because reading O2 abnormal ( RIZAL & ANDRI )
|
|
2024-09-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
PMR service critical motor and LSR kiln and cooler
|
PMR service critical and DC motor. Clean up area and filter motor. Measure vibration, noise, temperature free and load side motor. Add grease 10 times and 15 times for free and load side motor ( AGUS & EVE RAKA )
|
|
2024-09-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-BF1
|
Replace lighting lamp that are off
|
Replacing 2 lighting lamp. Test on lighting lamp result ok ( ADI & FIRMAN )
|
|
2024-09-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
BOTTOM-CT
|
Move or relocation cable transmitter
|
Install pole of transmitter, relocation cable power and sensor transmitter ( PENY & ANDRI )
|
|
2024-09-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Install camera monitoring
|
Installing camera monitoring, pulling cable UTP at work shop ( AGUS & FIRMAN )
|
|
2024-09-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-FN1-
|
GEMBA TPM
|
House keeping area motor and fence. Repainting yellow color for fence and tube at west side ( EMIS & RIZAL & ADI & EVE RIZKY )
|
|
2024-09-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
AFR
|
Replace lamp lighting off at pole 443 FN1
|
Replace 2 lamp lighting at pole 443 FN1, test on result lamp on ( AGUS & ADI )
|
|
2024-09-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SC1-&-393-SC7-&-393-SC8
|
Move cable for transmitter and cable LCS
|
Move cable for transmitter and cable LCS ( PENY & FIRMAN & ANDRI )
|
|
2024-09-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-Z4B-T1-&-443-Z4A-T2
|
Cross check temperature indication
|
Cross check temperature indication compare with CCR ( RIZAL )
|
|
2024-09-04
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1-&-HRG
|
Check hydrogen and check HRG
|
Check HRG and Check hydrogen supply still available, do zero and span calibration FIDOR result ok ( PENY & RIZAL )
|
|
2024-09-03
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Continue completing focus improvement
|
Completing data focus improvement ( EVE RIZKY )
|
|
2024-09-03
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-GQ1
|
WBI hoist crane 473 EH1, 473 EH2, 473 EH3, 473 EH4, 473 EH5, 493 EH1, L1C EH1 & L1C EH2
|
WBI hoist crane. Test move up and down, north and south, west and east ( ADI & EVE RIZKY )
|
|
2024-09-03
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SCB
|
Relocation cable track
|
Relocation cable track ( FIRMAN & ANDRI )
|
|
2024-09-03
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-AS7-&-433-FN1
|
Check vibration and noise motor
|
Check vibration and noise motor at free and load side motor ( AGUS )
|
|
2024-09-04
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SC8-&-SC9
|
Relocation cable LCS
|
Relocation cable LCS ( PENY & FIRMAN & ANDRI )
|
|
2024-09-04
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-AND-443-2K1
|
PMR service analyzer
|
PMR service analyzer. Clean flange, probe, filter probe, sample line, diaphragm pump. filter baltston, dryer gas from dirty of dust. Check humidity sensor, replace filter if found bad condition ( RIZAL )
|
|
2024-09-04
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1-
|
PMR service analyzer
|
PMR service analyzer. Clean up flange, sample line, filter probe, balston filter, diaphragm pump, dryer gas from dirty of coal. Check filter humidity sensor, replace filter if found bad condition. Calibration zero CO and span O2 at L63 2K1 because before measurement CO -0.002 PPM and O2 22.45 Vol% after calibration reading CO: 0.042 PPM O2: 18.10 Vol % ( AGUS & ADI )
|
|
2024-09-02
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WBI-HOIST-CRANE
|
363 CA1, L63 EH1, 443 EH1, 333 EH1, 363 EH1, 423 EH1
|
WBI hoist crane. Test run move up and down side, move north, south, west and east side ( RIZAL & EVE RIZKY )
|
|
2024-09-02
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
PMR service critical and DC motor
|
PMR critical and DC motor. Clean up area and filter motor. Add grease from 10 times and 17 times for free and load side motor ( AGUS S )
|
|
2024-09-02
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SCB
|
Relocation track of cable
|
Install cable tray for relocation cable ( PENY & ANDRI & FIRMAN )
|
|
2024-09-02
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
PMR service medium voltage motor
|
PMR service medium voltage motor. Clean area and filter motor. Service AUTO MEMOLUBE at 363 MD1. Measure vibration, noise and temperature free and load side motor. Clean up chiller tube at 363 FN1, 363 FN2, 423 FN1 and 443 FN1. Add grease from 10 times and 20 times for free and load side motor ( ADI )
|
|
2024-08-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-FN1
|
Completing data TPM, move place of equipment cleaning tools and place from kiln to 423 FN1, house keeping
|
House keeping area motor, completing data TPM, also move place and equipment cleaning tools from 463 MD1 M1 to 423 FN1 ( PENY & RIZAL & FIRMAN & EVE RIZKY )
|
|
2024-08-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER6
|
House keeping area electric room outside
|
House keeping area outside use equipment cleaning tools also water hydran to clean up front of electric room and road ( EMIS & AGUS & ADI & IMAN & ANDRI )
|
|
2024-08-27
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
433-BE1
|
Check noise motor high
|
Check noise motor high, add grease at motor result noise back to normal below 2 gE ( EMIS )
|
|
2024-08-27
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SCA
|
Prepare relocation LCS
|
Preparing relocation for LCS at work shop ( PENY & FIRMAN & CIVACON )
|
|
2024-08-27
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
YM CEMS accompany KISS employee
|
YM CEMS accompany KISS employee Mr. Hannes and Mr. Adrianus service CEMS ( RIZAL & RIZKY EVE & HANNES & ADRIANUS )
|
|
2024-08-27
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
Connect cable RTD at I/O panel
|
Connected cable RTD at motor side. Prepare cable 6P x 0.75 approximately 1.5 meter including conduit cable. Make a name of cable RTD at I/O panel, continue connected at panel 3C1-2RB-11 result indication temperature all ok ( AGUS & ADI )
|
|
2024-08-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1-M1
|
Pulling cable 6P x 0.75 mm from motor to panel I/O
|
Pulling cable 6P x 0.75 mm from motor to nearly panel I/O ( ANDRI & FIRMAN )
|
|
2024-08-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
PMR service critical and DC motor
|
PMR service critical and DC motor. Clean up area and filter motor. Measure vibration, noise , temperature at free and load side motor. Check spark at carbon brush at 463 MD1 and 473 FN7. Add grease 10 times to 15 times at free and load side motor ( AGUS )
|
|
2024-08-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
PMR service medium voltage motor
|
PMR service medium voltage motor, Clean up area motor, filter motor, chiller tube at 363 FN1 & 363 FN2. Measure vibration, noise and temperature at free and load side motor. Check spark at carbon brush room for 363 MD1. Add grease from 10 times to 15 times at free and load side ( PENY )
|
|
2024-08-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Inspection electrical and welding machine
|
Inspection electrical belong to ELECTRICAL RMK NR1 ( ADI )
|
|
2024-08-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-MECHANIC
|
Machine roller often trip
|
Check machine roller, increase setting ampere from 40 to 43. Ampere motor 43.9 ( EMIS )
|
|
2024-08-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L33-BC2
|
Check belt speed rate
|
Check speed rate at L33 BC2 ( PENY )
|
|
2024-08-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FA6
|
Relocation pressure transmitter and lighting lamp
|
Relocation for pressure transmitter and lighting lamp ( RIZAL & ANDRI )
|
|
2024-08-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
YM CEMS accompany KISS employee
|
YM CEMS. MCS 100 E stop pump, make good at cable Transduce Flowsic 100 bottom side, replace snap ring at flange MCS 100 E top side also replace filter top flange. Write reading CO around 965 PPM and SO2 around 165 PPM before replace snap ring. Recode reading CO around 615 PPM and SO2 around 65 PPM after replacing ( ADI & KISS ADRIANUS )
|
|
2024-08-22
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Drawing panel weigh feeder coal
|
Drawing panel of weigh feeder coal ( FIRMAN & ANDRI )
|
|
2024-08-22
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
YM CEMS accompany KISS employee
|
Accompany KISS employee to Yearly Maintenance CEMS ( RIZAL & KISS Mr. ADRIANUS )
|
|
2024-08-22
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
Install motor air blaster
|
Installing motor air blaster ( FIRMAN & ANDRI )
|
|
2024-08-22
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3-&-ER4-&-ER5
|
Check battery UPS fault indication
|
Check at ER5: found 6 battery UPS are bubbled, turn on breaker for battery make sign that battery are not normal advise replace all battery UPS total 8 battery. Check ER4: battery UPS are normal and there is no fault indication at panel. Check ER3: found at panel UPS at bypass, found 1 battery is mark bad condition, advise replace battery UPS total 8 battery ( AGUS & PENY & ADI )
|
|
2024-08-21
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1-
|
WBI electric and instrumentation I/O, sump pump, T&T
|
WBI electrical and instrumentation I/O, sump pump,T&T ( ADI )
|
|
2024-08-21
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
413-BL2
|
Replace handle LCS
|
Replacing handle LCS ( AGUS )
|
|
2024-08-21
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-BF1
|
Activation drain
|
Install solenoid valve for drain ( RIZAL )
|
|
2024-08-21
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1-
|
PMR service analyzer
|
PMR service analyzer. Clean up flange, filter probe, sample line, diaphragm pump, filter balston, dryer gas from dirty of coal. Check filter humidity, replace filter if found bad condition ( RIZAL )
|
|
2024-08-20
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-PM-STOP-333-AC1-& 333 MS1 & 333 WF1
|
Check motor
|
Check motor also clean up area motor from dirty of dust ( AGUS )
|
|
2024-08-20
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-WP1-M1
|
Test run and addressing compare between I/O panel and CCR
|
Test run and addressing from local to CCR. Replace relay at ER3, make change connection at ER3 for relays DO at panel I/O bottom ER3. Clean up solenoid valve bray at 363 WP1 M1 make sure can open and close from manual and auto. Result motor and solenoid valve bray working ok ( PENY & ADI )
|
|
2024-08-20
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-FV1
|
Replace solenoid valve
|
Replace solenoid valve ( RIZAL )
|
|
2024-08-20
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR service CEMS
|
PMR service CEMS. Clean up filter purge air unit, transducer A & B FLOWSIC 100, swivel window T/R & R Dust Hunter continue alignment Dust Hunter, gas bottle room, CEMS room and filter cabinet MCS 100 E ( RIZAL )
|
|
2024-08-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
433-RF1
|
Install hand reel that which can be removed
|
Fabrication hand reel at work shop ( FIRMAN & ANDRI )
|
|
2024-08-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
PMR service medium voltage motor
|
PMR service medium voltage motor. Clean are and filter motor. Measure vibration, noise and temperature at free and load side motor. Add grease average 10 times to 15 times at free and load side motor ( AGUS S )
|
|
2024-08-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-AND-443-2K1
|
PMR service analyzer
|
PMR service analyzer. Clean up flange, probe, filter probe, sample line, diaphragm pump, filter balston, dryer gas form dirty of dust. Check humidity sensor, replace filter if found bad condition ( RIZAL )
|
|
2024-08-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
Reading VOC is failure
|
Change H2 bottle gas because found at local empty level. Result after replace H2 gas reading VOC back to normal ( RIZAL )
|
|
2024-08-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CHANGE-HOUSE-PRODUCTION
|
Replace LED lamp
|
Replacing LED lamp 3 each and electric socket at change house production. Test on lamp LED and functional electric socket result ok ( PENY & ADI )
|
|
2024-08-16
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L3C-RE1
|
PM fix cabin door drag when open & panel cabin control PLC, clean up panel control reel, install chain at cable trolly harrow, replace lighting lamp and reposition lamp
|
Fix cabin door control PLC and cabin door, clean up panel control reel, install chain at cable trolly harrow, replace lighting lamp 3 each test on result ok ( RIZAL & ANDRI & PENY & AGUS & ADI & FIRMAN )
|
|
2024-08-15
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
WBI bottom blending, cooler, clinker silo, kiln
|
WBI area bottom blending, kiln, cooler, clinker silo. Measure vibration, noise and temperature some motor that upnormal condition, Add grease at 473 FA9 because found noise average 15 times measure noise back to normal ( ADI & FIRMAN )
|
|
2024-08-14
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-BF1-T1
|
Measurement temperature abnormal to low
|
Replace sensor use RTD. Install at local result measurement ok ( PENY & RIZAL )
|
|
2024-08-14
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-WF1
|
Fabrication box panel
|
Do fabrication box panel at work shop ( FIRMAN )
|
|
2024-08-15
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR service analyzer
|
PMR service analyzer. Clean up flange, sample line, filter probe, diaphragm pump. filter balston, dryer gas from dirty of coal. Check filter humidity sensor, replace filter with spare filter if found bad condition ( AGUS & ANDRI )
|
|
2024-08-15
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-AND-443-2K1
|
PMR service analyzer
|
PMR service analyzer. Clean up flange, probe, filter probe, sample line, diaphragm pump. filter balston, dryer gas from dirty of dust. Check filter humidity sensor, replace filter with spare if found bad condition ( PENY & RIZAL )
|
|
2024-08-14
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
WBI top blending, CT, Pre heater and KILN
|
WBI top blending. CT, pre heater and kiln. Measure vibration, noise and temperature free and load side motor ( ADI )
|
|
2024-08-13
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-MECHANIC
|
Test run motor ex L94 SC5 plan use at 363 BC1
|
Test run motor ex L94 SC5, check ampere use ampere plier: 10.0; 9.0; 92 ( EMIS & ADI )
|
|
2024-08-13
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
SPARE-363-FN2
|
Install panel and connect heater
|
Installing panel and connected power heater motor ( AGUS & ANDRI & FIRMAN )
|
|
2024-08-13
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-BL4-AND-483-BL5
|
Greasing and motor fan noise
|
Check motor fan service result ok. Add greasing 15 times for LS and FS result noise down ( AGUS & ANDRI & FIRMAN )
|
|
2024-08-13
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR service CEMS
|
PMR service CEMS. Clean up filter purge air unit, swivel window, transducer, filter cabinet, gas rooms. Alignment dust hunter ( PENY )
|
|
2024-08-13
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
WBI area raw mill, feed bin and bag filter,CT
|
WBI area feed bin, bag filter, and CT. Measure vibration, noise and temperature some motor that ubnormal condition ( ADI )
|
|
2024-08-12
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-FA2,-483-BL1,-453-BL1
|
Add grease motor
|
Add grease motor around 10 times at free and load side ( PENY & ADI )
|
|
2024-08-12
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
463 KL1 T1 repaire house TE thermocouple kiln
|
Repaire house thermowell t/c kiln at work shop ( ANDRI & FIRMAN )
|
|
2024-08-12
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
PMR service IR TAD, T scanner, CCTV and pyrometer
|
PMR service IR TAD, T scanner, CCTV and pyrometer. Clean up flange, lens from dirt of dust ( RIZAL )
|
|
2024-08-12
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
PMR service critical and DC motor
|
PMR service critical and DC motor. Clean up area and filter motor, Measure vibration, noise and temperature free and load side motor. Add grease from 10 times for FS and LS motor ( PENY )
|
|
2024-08-12
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
PMR service medium voltage motor
|
PMR medium voltage motor. Clean up area and filter motor. Measure vibration, noise and temperature load and free side. Add grease 10 times and 15 times for LS and FS motor ( ADI )
|
|
2024-08-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-SC1
|
clean up area motor and install cover motor
|
Clean up area motor use hand blower. Installing cover motor ( 3 CIVACON )
|
|
2024-08-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1
|
Clean up carbon brush, motor and filter motor, measure long of carbon brush
|
Clean up area motor, carbon brush room from dirty of dust with instrument air supply, also diesel and clorotin liquid ( AGUS & ADI )
|
|
2024-08-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-BC1
|
Replace bearing motor
|
Replacing bearing motor ( YOGA & ANDRI & FIRMAN )
|
|
2024-08-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-FN1
|
Clean up bearing LS and fix motor. Install box ex cable RTD west side motor, clean up bearing fan free side
|
Clean up bearing load and free side motor also fix motor. Install box ex cable RTD at west side motor Repainting grey color for bottom fence and base motor ( PENY & AGUS & RIZAL & ADI )
|
|
2024-08-08
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Continue drawing I/O
|
Drawing I/O panel at work shop at save at computer ( AGUS )
|
|
2024-08-08
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
Continue project
|
Connected cable from stack to I/O panel ( RIZAL )
|
|
2024-08-08
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WEST-&-EAST-BLENDING-BOTTOM
|
Replace lighting lamp off
|
Replace lighting off with spare lamp. Test on result ok ( FIRMAN & ANDRI )
|
|
2024-08-08
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR service analyzer
|
PMR service analyzer. Clean flange, filter probe, sample line, diaphragm pump, filter balston, dryer gas from dirty of dust. Check filter humidity sensor replace filter with spare filter if found bad condition ( YOGA )
|
|
2024-08-08
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
PMR service pyrometer, t_scanner, IR temperature, cCTV
|
PMR service IR temperature, T_scanner, CCTV, pyrometer. Clean up flange, lens IR TAD & T_scanner,pyrometer and CCTV from dirty of dust ( PENY )
|
|
2024-08-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR service analyzer
|
PMR service analyzer. Clean up flange, probe, filter probe, sample line, diaphragm pump, filter balston ,dryer gas from dirty of dust. Check humidity sensor replace filter with spare filter if found bad condition ( RIZAL )
|
|
2024-08-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-CT1
|
Check all solenoid water and air
|
Service all solenoid valve for gun water and air found solenoid 6 and 19 for water there is snail and dirty service result ok. Test run solenoid valve result ok ( YOGA & ANDRI )
|
|
2024-08-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-EL1
|
Service problem at elevator
|
Service problem at elevator. Test run from 8th to 1st floor result ok Add install cooling fan for PLC elevator at 8th floor ( PENY & FIRMAN )
|
|
2024-08-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FN7-&-463-MD1
|
Add grease motor
|
Add grease motor at FS and LS 5 times at 473 FN7, also add grease motor at FS & LS 10 times at 463 MD1 ( ADI )
|
|
2024-08-07
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-HC1-&-COOLER-FAN
|
Add grease motor
|
Add grease average 10 times at motor cooler fan also 15 times at 473 HC1 M1. Check indication vibration and noise motor cooler fan compare between before and after grease are normal there is no alarm ( ADI )
|
|
2024-08-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-FN1
|
Temperature bearing is high around 82 degree celcius
|
Clean up cell tube of fan, area motor with instrument air supply. Install cooling motor at south side, check at CCR bearing temperature degrease from 83.4 degree celcius to 82.1 degree celcius ( PENY & ADI & ANDRI )
|
|
2024-08-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR service CEMS and pulling cable
|
PMR service CEMS, clean up CEMS room and gas room also filter cabinet MCS 100 E. Pulling cable from stack to I/O panel ( RIZAL & YOGA & ANDRI & 1 CIVACON )
|
|
2024-08-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-FN1
|
Pulling cable 5x35m at FM Nr1
|
Take cable 5x35 m average 45 meter at ware house, bring to FM Nr1. Pulling cable from site to incoming power heater. Connected cable heater input and output T motor ( AGUS & PENY & ADI & FIRMAN & 2 CIVACON )
|
|
2024-08-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-W1-M1-AND-M3
|
Check vibration, noise and free and load side motor
|
443 W1 M3 condition off. 443 W1 M1 vibration: 5.5 to 6.4 mm/s- noise 2.5 to 2.7 gE at load side.Vibration: 2.5 to 3.7 mm/s and noise 2.5 to 2.8 gE at free side ( ADI )
|
|
2024-08-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
Continue job at CEMS
|
Prepare support for temperature sensor at work shop. Install temperature sensor at stack and pulling cable from stack to I/O continue connected cable ( RIZAL & YOGA & ANDRI )
|
|
2024-08-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
PMR service critical and DC motor
|
PMR service critical and DC motor. Clean up area and filter motor. Measure vibration, noise and temperature free and load side motor. Add grease 10 times to 25 times at free and load side motor ( PENY )
|
|
2024-08-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
PMR service medium voltage motor
|
PMR service medium voltage motor. Clean area and filter motor, also cell tube at 363 FN1-363 FN2, 423 FN1 and 443 FN1 use instrument air supply from dirt of dust. Measure vibration, noise and temperature free and load side. Add grease 10 times for free and load side motor ( ADI )
|
|
2024-08-02
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-FN1
|
Install box ex cable RTD and house keeping
|
Installing box ex cable RTD and house keeping area motor ( EMIS & YOGA & AGUS & RIZAL & ADI & FIRMAN & ANDRI & ARTHA UNY & AIMAN )
|
|
2024-08-02
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
453-BL1
|
Replace lighting lamp off
|
Replacing lighting lamp off. Test on result ok ( YOGA & ANDRI )
|
|
2024-08-02
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-FN2
|
Install or connect power heater at Finish Mill I
|
Connect cable heater of 363 FN2 ( AGUS & FIRMAN & ARTHA UNY )
|
|
2024-08-02
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-BF1
|
Repaire tubing
|
Check at site, found 1ex tube ripped, replace tube at bag filter. Result ok ( RIZAL & ADI )
|
|
2024-08-01
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-BC4
|
Replace memolube
|
Prepare memolube also connector at work shop. Install memolube at site ( YOGA & ANDRI )
|
|
2024-08-01
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-FN1
|
TPM close hole plat form and install box ex cable RTD at west side motor
|
Close hole at plat form and install box ex cable RTD at west side. Also repainting fence yellow color, base motor with grey color, clean up area motor use instrument air supply ( PENY & RIZAL & FIRMAN )
|
|
2024-08-01
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WARE-HOUSE
|
Continue connect cable power heater motor
|
Connecting cable heater motor at ware house ( AGUS & ADI & ARTHA UNY )
|
|
2024-08-01
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
EXCHANGER-FAN
|
Clean up area motor
|
Clean up area motor ( 3 CIVACON )
|
|
2024-07-31
1 year ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
EXCHANGER-FAN
|
Clean up area motor
|
Clean up area motor ( 3 CIVACON )
|
|
2024-07-31
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HEAT-AXCHANGER-FAN
|
Clean up area motor
|
Clean up area motor ( 3 CiVACON )
|
|
2024-07-31
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR service coal mill
|
PMR service analyzer. Clean up flange, sample line, filter probe, diaphragm pump, filter baltson ,dryer gas, filter humidity sensor replace filter if found bad condition with spare filter ( RIZAL )
|
|
2024-07-31
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
PUMP-LOADING-SOLAR
|
Error can not start and install sign for motor and MCC
|
Check at local, found pump is not working well ( PENY & ARTHA UNY & ANDRI )
|
|
2024-07-31
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR service analyzer
|
PMR service analyzer. Clean up flange, probe, filter probe, diaphragm pump, from dirty of dust. Replace seal at probe 1 at perilstatic pump tube at 443 2K1 and cutting tube 1 cm sample line at probe 1 ( YOGA & ADI )
|
|
2024-07-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-FN5
|
Vibration motor is high
|
Check motor support, make new hole for nut motor, realignment motor. Test run motor found vibration motor back normal ( AGUS & FIRMAN )
|
|
2024-07-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HEAT-EXCHANGER-
|
Continue clean up motor
|
Clean up area motor ( 3 CIVACON )
|
|
2024-07-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
PMR service mv motor
|
PMR service medium voltage motor. Clean up area and filter motor. Measure vibration, noise and temperature free and load side. Add grease 10 times to 15 times ( PENY & ARTHA UNY )
|
|
2024-07-31
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WARE-HOUSE
|
Continue connect cable heater
|
Connect cable heater 9 AGUS & FIRMAN )
|
|
2024-07-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-GD1
|
Clean up motor
|
Clean up area motor ( ANDRI )
|
|
2024-07-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR service CEMS
|
PMR service CEMS. Clean up transduce A & B Flowsic 100, swivel window T/R & R Dust Hunter, filter purge air unit, alignment Dust Hunter, gas room, reset error temperature at MCS 100 E because we soldier cable heater at stack ( YOGA & ADI )
|
|
2024-07-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-BL7-AND-BL9
|
Replace catridge and install easy lube
|
Replacing catridge and installing easy lube ( FIRMAN & ANDRI )
|
|
2024-07-29
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HEAT-EXCHANGER-
|
Clean up motor
|
Clean up motor ( 3 CIVACON )
|
|
2024-07-29
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FA6
|
Check vibration sensor n1 error indication
|
Service sensor vibration N1, check indication at CCR ok normal ( RIZAL & YOGA )
|
|
2024-07-30
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-FN1-
|
Completing data TPM
|
Completing data TPM at 423 FN1 continue print out and install at dash board ( RIZAL & YOGA )
|
|
2024-07-29
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-GQ1
|
Add grease motor
|
Add grease motor ( PENY )
|
|
2024-07-29
1 year ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
363-RM1
|
PMR service mv motor
|
PMR service motor. Clean area and filter motor. Measure vibration, noise and temperature free and load side motor. Add grease 10 times for free and load side motor ( AGUS & ARTHA UNY )
|
|
2024-07-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L3C-RE1
|
Completing data focus improvement
|
Completing data focus improvement ( YOGA )
|
|
2024-07-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-FN1
|
TPM Completing data dash board
|
Completing data dash board and focus improvement TPM 423 FN1 ( RIZAL )
|
|
2024-07-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-FN1
|
Completing, clean up and install
|
Completing, clean up, and install dash board TPM 423 FN1 ( ADI & EVE IQBAL )
|
|
2024-07-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-WF1
|
Continue fabricated support belt drift
|
Fabricated support belt drift ( FIRMAN )
|
|
2024-07-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-RF6
|
Replace bearing motor, seal and fan motor. Install at site
|
Replacing bearing motor, seal and fan motor. Installing motor at site ( PENY & ANDRI )
|
|
2024-07-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-AC2
|
Replace handle LCS
|
Replacing handle LCS at site. Test run ok handle functional ( YOGA & ADI )
|
|
2024-07-25
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-MD1
|
Add grease
|
Add grease at main drive 15 times 9 ADI & EVE IQBAL )
|
|
2024-07-25
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-WF1
|
Continue fabrication support belt drift
|
Fabrication support belt drift at work shop ( FIRMAN & WIKAN )
|
|
2024-07-25
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG
|
Continue trouble shoot problem
|
Service HRG because error Ground Fault ( AGUS & PENY )
|
|
2024-07-25
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR service analyzer
|
PMR service analyzer. Clean up flange, sample line, filter probe, balston filter, diaphragm pump, dryer gas from dirt of coal dust. Check humidity sensor replace filter if found bad ( RIZAL & WIKAN )
|
|
2024-07-25
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
464-2K1-&-443-2K1
|
PMR service analyzer
|
PMR service analyzer. Clean up flange, probe, filter probe, sample line, diaphragm pump, dryer gas, filter balston from dirt of dust. Check humidity sensor, replace filter if found bad ( YOGA & EVE IQBAL )
|
|
2024-07-25
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-FA1
|
Replace tank of auto grease
|
Replace tank auto grease motor ( ADI & EVE IQBAL )
|
|
2024-07-25
1 year ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
453-BL1-&-483-BL1
|
Add grease at free and load side motor
|
Add grease 25 times for 483 BL1 and 20 times for 453 BL1 ( ADI & EVE IQBAL )
|
|
2024-07-24
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-MD1
|
Check carbon brush
|
Check carbon brush at main drive kiln result all still ok and no spark at carbon brush ( PENY & ADI & EVE IQBAL )
|
|
2024-07-24
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WARE-HOUSE
|
Continue install cable heater to big motor
|
Installing cable heater to big motor at ware house ( AGUS & ANDRI )
|
|
2024-07-24
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-WF1
|
Continue fabrication support belt drift
|
Fabrication support belt drift ( FIRMAN )
|
|
2024-07-24
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR service CEMS
|
PMR service CEMS. Clean up filter purge air unit dust hunter and flowsic 100, swivel windows t/r and reflector unit dust hunter also alignment dust hunter, transducer A & B flowsic 100, filter cabinet MCS 100 E, room of MCS 100 E and gas room ( RIZAL )
|
|
2024-07-24
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
WBI area Coal Mill, truck lift, tripper, reclaimer coal mill, clinker silo
|
WBI are coal mill, clinker silo, reclaimer coal, tripper and truck lift ( YOGA )
|
|
2024-07-24
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-BC4
|
Replace belt drift
|
Check condition sensor belt drift result still ok. Asking to operator regarding problem belt drift result there is no problem for belt drift at L1C BC4 9 PENY & ADI & EVE IQBAL )
|
|
2024-07-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FN4
|
Motor over load
|
Motor over load. Check cable motor with meger result 2000 Mega Ohm. Clean up cable motor use sand piper , motor area, still need to do clean up motor because area already stuck dirty of dust. At moment motor off ( PENY & ADI & EVE IQBAL )
|
|
2024-07-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FA6
|
Replace vibration sensor
|
Check at fan motor , found vibration sensor result N1 and N2 are normal indication ( RIZAL & YOGA )
|
|
2024-07-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-SR1
|
Repair cover fan
|
Repair cover fan, found 2 nut are not good ( EMIS )
|
|
2024-07-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-SX1
|
Check alignment motor
|
Check alignment motor, bearing FS and LS are ok ( EMIS )
|
|
2024-07-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG-CHILLER
|
Service cover chiller HRG
|
Service cover chiller at HRG ( YOGA & FIRMAN )
|
|
2024-07-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-BE1
|
Discouple coupling, test no load and noise motor
|
Discouple coupling test no load measure noise motor. Found greasing at coupling dry, add grease at coupling test run no load measure noise back to normal ( RIZAL & ANDRI )
|
|
2024-07-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-MD1
|
Clean up carbon brush, motor and filter motor, measure long of carbon brush
|
Clean up area motor, filter motor, carbon brush room from dirty of dust. Measure long of carbon brush write at form inspection ( PENY & ADI & EVE IQBAL )
|
|
2024-07-23
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-BL2-&-453-BL1
|
Install fan cooling motor and replace motor blower
|
Install fan cooling motor at 483 BL1 and replace motor blower at 453 BL1 ( EMIS & AGUS & EVE RIZKY )
|
|
2024-07-22
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-BL2-&-453-BL2
|
Replace fan cooling motor and replace blower cooling motor
|
483 BL2 fan cooling motor recondition. 453 Bl2 replace blower cooling motor ( EMIS & AGUS )
|
|
2024-07-22
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-RF1-AND-483-RF2
|
recondition motor because oil come to motor
|
Check at site there is no oil come to motor at rotary feeder ( ADI )
|