Detail NR1 ELEC/INST RM/KL/CM
2024-12-03
443-PH1
Wahyu Adi Triono
Problem: WBI electrical and instrumentation top blending, pre heater and kiln
Action:
WBI electrical and instrumentation top blending, pre heater and kiln. Measure vibration, noise and temperature free and load side motor. Clean up area motor ( PENY & ADI )

Status: done
Back to report list