443-PH1-AND-WORK-SHOP
Wahyu Adi TrionoProblem: CCTV 3rd floor and install heat exchanger IKGA
Action:
CCTV 3rd floor move direction to way of positive materials at 2nd floor. Install complete heat exchanger ( PENY & ADI & ANDRI )
Status: done
Back to report list