Detail NR1 ELEC/INST RM/KL/CM
2025-02-09
473-CC1
Wahyu Adi Triono
Problem: Check equipment and electric support ( BROOK, CABLE )
Action:
Equipment  2 Eah (brook) acceptabe to operate 1 eah still repare, a few  cable not acceptable (Rejected) ( FIRMAN & AGUS & RIZAL )

Status: done
Back to report list