2024-07-22
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
453-SG1-&-453-BV1
|
Solenoid valve stuck for SG and connect bV1
|
Check at local order of SG still open, service slide gate test open and close result ok. 453 BV1 connect unit at local. test open and close, result closed ok no error but when order open still error indication at CCR it is meaning solenoid valve to open is not touch. We think maybe mechanical problem when order pen some materials hold valve ( ADI & EVE RIZKY )
|
|
2024-07-22
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-WF1
|
Fabrication belt drift weight feeder
|
Fabrication belt drift for weight feeder at work shop ( PENY & FIRMAN )
|
|
2024-07-22
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WARE-HOUSE
|
Continue connect cable power input, cable heater to motor
|
Connected cable power input and cable heater to motor ( AGUS & ANDRI & EVE RIZKY )
|
|
2024-07-22
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR service analyzer
|
PMR service analyzer. Clean up flange, probe, filter probe, sample line, diaphragm pump, filter balston, dryer gas from dirt of dust. Check humidity sensor and filter, replace filter if found bad condition with spare filter ( RIZAL )
|
|
2024-07-22
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
PMR service medium voltage motor
|
PMR service medium and DC motor. Clean up area motor and filter motor. Measure vibration, noise and temperature free and load side motor. Add grease 15 times for free and load side motor ( PENY & EVE IQBAL )
|
|
2024-07-22
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
PMR service medium voltage motor
|
PMR service medium voltage motor. Clean up area motor, filter motor. Measure vibration, noise and temperature free and load side. Add grease 10 times to 15 times for free and load side motor 363 FN1-363 FN2-423 FN1 and 443 FN1 ( ADI )
|
|
2024-07-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
CEMS problem at temperature indication
|
Trouble shooting for problem, result ok ( RIZAL & EVE IQBAL )
|
|
2024-07-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WARE-HOUSE
|
Install panel lighting for heater power
|
Fabrication support panel at work shop. Install panel lighting at ware house ( ANDRI )
|
|
2024-07-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
PMR service medium voltage motor
|
PMR service medium voltage motor. Clean up area and filter motor. Measure vibration, noise and temperature free and load side motor. Add grease 10 times to 30 times for free side and load side motor ( AGUS )
|
|
2024-07-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-FN1
|
Take data for TPM
|
Take data for TPM belong to RMK Nr1. Make data TPM AM, safety at computer save data ( YOGA & EVE DAVID )
|
|
2024-07-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-GQ1
|
WBI electrical and instrumentation bottom blending, cooler, clinker silo
|
WBI electrical and instrumentation area bottom blending, cooler and clinker silo. Measure vibration, noise and temperature free and load side motor. Check tank auto grease, result ok ( RIZAL & EVE IQBAL )
|
|
2024-07-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
WBI electrical and instrumentation top blending, GCT, CT, pre heater, kiln, burner floor
|
WBI electrical and instrumentation area top blending, pre heater, GCT, CT, kiln and burner floor. Measure vibration, noise and temperature free and load side motor. Check auto grease tank, some motor at low level need to be refill auto grease tank ( ADI & EVE RIZKY )
|
|
2024-07-18
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
333-AC1;-363-BC1
|
Install auto grease
|
Installing auto grease for motor ( AGUS & FIRMAN & RIZAL & ANDRI )
|
|
2024-07-18
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-FA2-AND-363-MD-1
|
Clean up filter and carbon brush room man drive
|
Clean up filter 363 fA2. Clean up area, filter and carbon brush 363 MD1 from dirty dust ( YOGA & ADI )
|
|
2024-07-18
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-FN1;363-FN2
|
Clean up bearing motor free and load side
|
Clean up area, filter and bearing motor of free and load side ( EMIS )
|
|
2024-07-18
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
333-AC1;-333-WF1;-363-BE1;-363-CV1;-393-SC8
|
Check noise bearing motor, discouple coupling if posible
|
Check noise bearing motor at free and load side motor. Add grease 10 times to 30 times at free and load side. Result noise below 2 gE ( AGUS & FIRMAN )
|
|
2024-07-18
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-BC1
|
Check safety device and noise bearing motor
|
Check safety device at 363 BC1 and noise bearing motor, add grease 25 times result noise below 2 gE ( RIZAL & ANDRI )
|
|
2024-07-18
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-AND-443-2K1
|
PMR service analyzer
|
PMR service analyzer. Clean up flange, probe, filter probe, diaphragm pump from dirty dust. Replace seal for filter probe 2 at 443 2K1 result reading O2 decrease from 3.34 % to 2.54 % also replace connector sample line at diaphragm pump 463 2K1 result reading O2 decrease from 4.16 % to 3.26 % ( YOGA & ADI )
|
|
2024-07-17
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-WF1
|
Check or replace lighting lamp are off
|
Replace lighting lamp off with spare lamp. Test on lighting lamp result ok ( YOGA & FIRMAN )
|
|
2024-07-17
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
PMR service medium voltage motor are kiln and coal mill
|
PMR service medium voltage motor area kiln and coal mill. Measure vibration-noise and temperature free side and load side motor. Add grease 10 times to 30 times for free side and load side motor if found vibration > 4 mm/s and noise > 2 gE ( AGUS & EVE DAVID )
|
|
2024-07-17
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PR1-T3
|
Pulling cable purging
|
Pulling cable for purging from location sensor to panel I/O continue connected at I/O panel ( RIZAL & ANDRI & EVE IQBAL )
|
|
2024-07-17
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
WBI area raw mill, feed bin and bag filter
|
WBI are raw mill, feed bin and bag filter. Measure vibration-noise and temperature for free side and load side for some motor, screw, and rotary feeder that are not normal condition for vibration and noise. Area motor 333 AC1-333 AC2, 333 WF1 to WF4 are dirty form dust process need to be clean up area motor ( ADI & EVE RIZKY )
|
|
2024-07-16
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FA1,FA2,FA3,FA4,FA6,FA8,FA9
|
Level auto grease low
|
Change tank auto grease with spare unit ( ADI & EVE IQBAL )
|
|
2024-07-16
1 year ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
L63-RM1
|
PMR service coal mill
|
PMR service analyzer L63 2k1, L63 2K2, L63 2K3 and 483 2K1. Clean up flange probe, sample line, filter probe, diaphragm pump, dryer gas, filter balston from coal dust. Check filter humidity sensor, replace filter with spare filter if found bad condition ( ADI & EVE IQBAL )
|
|
2024-07-15
1 year ago
|
NR.EL-02
|
Yurizal Rachman
|
496-VT3
|
Service and repair
|
Replace valve kinetrol
|
|
2024-07-15
1 year ago
|
NR.EL-02
|
Yurizal Rachman
|
444-P13A
|
Service and repair
|
Replace pressure transmitter
|
|
2024-07-15
1 year ago
|
NR.EL-02
|
Yurizal Rachman
|
444-FN2-T3
|
Service aand repair
|
Replace temperature transmitter
|
|
2024-07-15
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
464-KL1-TI-8,-TI-9,-TI-10
|
Connected cable from sensor to temperature transmitter Endess Hauser
|
Connected cable from sensor to temperature transmitter. Result reading at display temperature transmitter ok ( YONRI & ADI & SOBUR )
|
|
2024-07-13
1 year ago
|
NR.EL-02
|
Yurizal Rachman
|
444-TI18
|
Servicw dan repair
|
Continue prepare relocation
|
|
2024-07-13
1 year ago
|
NR.EL-02
|
Yurizal Rachman
|
444-MW1
|
Service dan repair
|
Replace Limit switch COG 2 eah
|
|
2024-07-13
1 year ago
|
NR.EL-02
|
Yurizal Rachman
|
444-PI13A
|
Relocation
|
Relocation probe dan sample line
|
|
2024-07-12
1 year ago
|
NR.EL-02
|
Yurizal Rachman
|
444-PH1-T18
|
Modifikasi
|
Prepare relocation probe thermocouple
|
|
2024-07-12
1 year ago
|
NR.EL-02
|
Yurizal Rachman
|
464-KL1
|
Service dan repair
|
Instal thermocouple ujung kiln
|
|
2024-07-12
1 year ago
|
NR.EL-02
|
Yurizal Rachman
|
444-BE1
|
Service dan repair
|
Service dan repair safety device,replace speed sensor
|
|
2024-07-11
1 year ago
|
NR.EL-02
|
Yurizal Rachman
|
434-FM6
|
Kalibrasi dan check
|
Clean up panel Kalibrasi zero span
|
|
2024-07-11
1 year ago
|
NR.EL-02
|
Yurizal Rachman
|
434-FM5
|
Kalibrasi dan Check
|
Clean up panel Kalibrasi zero span
|
|
2024-07-11
1 year ago
|
NR.EL-02
|
Yurizal Rachman
|
434-BF3
|
Service dan repair
|
Check all solenoid purging Replace all selang Replace connector bocor
|
|
2024-07-11
1 year ago
|
NR.EL-01
|
Yurizal Rachman
|
L3C-RE1
|
Finalising Ta Rizky
|
Download modifikasi program Wiring control dan test run
|
|
2024-07-11
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Complete data PMR service analyzer 463 2K1 - 443 2K1 and CM analyzer for June & July 2024
|
Completing data PMR service analyzer at June-July 2024 for 463 2K1 & 443 2K1 also June 2024 for coal mill
|
|
2024-07-10
1 year ago
|
NR.EL-02
|
Yurizal Rachman
|
434-FM1,2,3,4
|
Kalibrasi
|
Kalibrasi fm 434 fm1 - 4
|
|
2024-07-10
1 year ago
|
NR.EL-02
|
Yurizal Rachman
|
434-PG1-4
|
Service dan repair
|
Check, service dan setting posisi dan indikasi damper
|
|
2024-07-10
1 year ago
|
NR.N2-OH
|
AGUS SUMIAJI SARBINI
|
404-3E1_ER4-NAR2
|
MCC & Switchgear Maintenance
|
1. Clean up MCC (100%) 2. Clean up Switchgear (100%) 3. Clean up Transformer (100%) 4. LV Protection Relay Testing (95%) 5. LV Protection Relay Replacement (60%)
|
|
2024-07-10
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
complete data TBM at shesig.sig.id
|
Complete data for TBM at shesig.sig.id for 3rd of meeting
|
|
2024-07-10
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1
|
Tank auto grease level low level
|
Replace tank auto grease with spare unit. Install at local set timer grease same with existing
|
|
2024-07-10
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR service coal mill
|
PMR service analyzer coal mill, clean up flange probe, filter probe, sample line, diaphragm pump, filter balston, dryer gas from dust coal. Check filter humidity sensor, check filter replace if found bad condition with spare filter. Write data PMR service analyzer at form PMR service analyzer Coal Mill
|
|
2024-07-09
1 year ago
|
NR.EL-02
|
Yurizal Rachman
|
444-PH1
|
Relokasi probe
|
Relokasi probe yg menghalangi
|
|
2024-07-09
1 year ago
|
NR.EL-02
|
Yurizal Rachman
|
464-KL1
|
Replace Thermocouple
|
Replace thermocouple ujung kiln
|
|
2024-07-09
1 year ago
|
NR.EL-02
|
Yurizal Rachman
|
414-3S1
|
Service dan repair
|
Service solenoid aerasi cone blending timur,check dan service level material,check dan service shut off valve(434 SG1 SG2)
|
|
2024-07-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Scan data calibration pressure transmitter OH Nr2
|
Scan data calibration pressure transmitter zero and span OH Nr2 save at computer D: Wahyu Adi T & Emis under name OH Nr2 calibration pressure transmitter
|
|
2024-07-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FN7-&-463-MD1
|
Clean up area and filter motor
|
Clean up area and filter motor from dust process use instrument air supply, check carbon brush condition result all condition ok. Add grease 10 time for free and load side at 463 MD1 ( PENY & ADI )
|
|
2024-07-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-BC7
|
PM tripper and reclaimer coal 7 days information from production department
|
Clean up panel near L1C BC7 from dust coal use cleaning cloth and hand blower ( PENY & ADI )
|
|
2024-07-09
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR service analyzer
|
463 2K1: found flow gas at 0 L/H CO: -0.15 PPM, NO: 25 PPM and O2: 20.90 %, clean up probe, filter probe from hard dust. Insert analyzer flow gas 100 L/H, all gas reading back to normal. 443 2K1: clean up flange probe, filter probe, sample line, diaphragm pump, dryer gas, filter balston from dust process, check filter humidity replace filter if found bad condition ( PENY & ADI & YOGA )
|
|
2024-07-08
1 year ago
|
NR.EL-01
|
Yurizal Rachman
|
423-2K3
|
Yearly maintenance
|
Service mcs dan prepare calibration mcs
|
|
2024-07-08
1 year ago
|
NR.EL-02
|
Yurizal Rachman
|
434-BF1,BF2
|
Service dan repair
|
Check service dan replace solenoid purging
|
|
2024-07-08
1 year ago
|
NR.EL-02
|
Yurizal Rachman
|
444-PH1
|
Service dan repair
|
Continue replace thermocouple Lt.6
|
|
2024-07-08
1 year ago
|
NR.EL-02
|
Yurizal Rachman
|
444-PH1
|
Service dan repair
|
Relokasi probe tubing pressure transmitter Lt.6
|
|
2024-07-07
1 year ago
|
NR.EL-02
|
Yurizal Rachman
|
L3C-RE1
|
Test run
|
Readykan dan test run L3C RE1 setelah mekanik ada modifikasi
|
|
2024-07-07
1 year ago
|
NR.EL-02
|
Yurizal Rachman
|
444-PH1
|
Service dan repair
|
Continue replace thermocouple Lt.7 dan 8
|
|
2024-07-08
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Write data calibration pressure transmitter Over Haul Nr2
|
Write data for calibration pressure transmitter area pre heater-kiln-raw mill-cooler and coal mill ( ADI )
|
|
2024-07-08
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-MD1
|
Auto grease low level
|
Replace tank of auto grease with spare unit. Refill existing tank auto grease at work shop ( EMS & ADI )
|
|
2024-07-06
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-NR2
|
Calibration pressure transmitter zero and span area cooler and coal mill Nr2
|
Calibration pressure transmitter zero and span area cooler and coal mill Nr2 get around 6 each ( YOGA & ADI )
|
|
2024-07-04
1 year ago
|
NR.SHIFT
|
Peny Prasetyo
|
463-MD1
|
pmr critical motor kiln
|
clean up motor kiln, fn7, analyser ph2 wiring
|
|
2024-07-05
1 year ago
|
NR.SHIFT
|
Peny Prasetyo
|
444-AN1
|
pasang analyzer redundant Ana12
|
wiring di er4, tarik kabel
|
|
2024-07-06
1 year ago
|
NR.EL-01
|
Peny Prasetyo
|
444-AN1
|
pasang Analyzer redundant An1 2
|
wiring, contineuty kabel, blackkout PLN
|
|
2024-07-05
1 year ago
|
NR.EL-02
|
Yurizal Rachman
|
444-PH1
|
Service dan repair
|
Replace thermocouple Lt.10 dan 11
|
|
2024-07-05
1 year ago
|
NR.EL-02
|
Yurizal Rachman
|
444-PH1
|
Service dan repair
|
Instal pressure transmitter Lt1 - Lt12
|
|
2024-07-05
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-NR2
|
Calibration pressure zero and span transmitter area cooler and coal mill Nr2
|
Calibration pressure zero and span transmitter area cooler and coal mill Nr2 get around 20 each transmitter ( YOGA & ADI )
|
|
2024-07-04
1 year ago
|
NR.EL-02
|
Yurizal Rachman
|
444-PH1
|
Instal pressure transmitter
|
Instal pressure transmitter lantai 12,11,10,9
|
|
2024-07-04
1 year ago
|
NR.EL-02
|
Yurizal Rachman
|
444-LD2
|
Service dan repair
|
Greasing gear motor,check open close kondisi masih OK
|
|
2024-07-04
1 year ago
|
NR.EL-02
|
Yurizal Rachman
|
444-LD-1-
|
Service dan repair
|
Replace bearing motor beck actuator,greasing gear motor,test open close
|
|
2024-07-04
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-NR2
|
Calibration pressure transmitter area COAL MILL and Cooler Nr2
|
Calibration pressure transmitter for area coal mill and cooler for NR2 get around 30 ( YOGA & ADI )
|
|
2024-07-03
1 year ago
|
NR.EL-02
|
Yurizal Rachman
|
434-VA1-,VA2
|
Service dan repair
|
Replace solenoid bray
|
|
2024-07-03
1 year ago
|
NR.EL-02
|
Yurizal Rachman
|
444-PH-1-T1,T12,T3,T4
|
Service dan repair
|
Replace thermocouple
|
|
2024-07-03
1 year ago
|
NR.EL-02
|
Yurizal Rachman
|
444-GT4,GT7,426-DV1
|
Service dan repair
|
Replace selang angin Test open close Clean up filter regulator
|
|
2024-07-02
1 year ago
|
NR.EL-01
|
Peny Prasetyo
|
444-KL1
|
ganti label rtd tire 1
|
tarik kabel & terminasi
|
|
2024-07-03
1 year ago
|
NR.EL-01
|
Peny Prasetyo
|
444-AN1
|
pasang Analyzer redundant An1 2
|
pasang solenoid , wiring
|
|
2024-07-03
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Calibration pressure transmitter area pre heater Nr2
|
Calibration pressure transmitter zero and span area pre heater narogong 2 gets around 21 pressure transmitter for Over Haul ( YOGA & ADI )
|
|
2024-06-11
1 year ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
M34-WPD
|
Indikasi motor vibrasi
|
Cek motor posisi discouple motor normal vibrasi kemungkinan dari pompa lanjut tim mekanik
|
|
2024-06-10
1 year ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
66B-CX4
|
Indikasi run dan fault ke CCR belum ada
|
Install Indikasi run dan fault ke CCR Test OK
|
|
2024-06-10
1 year ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
SCISSOR-LIFT
|
WBI
|
WBI scissor lift
|
|
2024-06-10
1 year ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
TRAFO-NAR1_2
|
WBI
|
WBI trafo OTR 2, 3, 301, 302, A, B
|
|
2024-06-07
1 year ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OHS-BUILDING
|
Lampu Mati
|
Cek tegangan hilang, cek fasa ada, kemungkinan netral putus harus bobok plafon untuk pengecekan lanjutan
|
|
2024-06-07
1 year ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
SDC-BUILDING
|
Lampu Mati
|
Ganti lampu area SDC building
|
|
2024-06-07
1 year ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OFFICE-ENVIRONMENT
|
Lampu dan stop kontak mati
|
cek breaker 6A trip beban termasuk AC ganti MCB dari 6A ke 16A test OK
|
|
2024-07-02
1 year ago
|
NR.EL-02
|
Yurizal Rachman
|
434-PG1&PG6
|
Service dan repair
|
Test open close,inject 4-20mA check indikasi Clean up area damper
|
|
2024-07-02
1 year ago
|
NR.EL-02
|
Yurizal Rachman
|
434-GT1
|
Service and repaire
|
Replace broken solenoid valve Test function from Do
|
|
2024-07-01
1 year ago
|
NR.EL-02
|
Yurizal Rachman
|
444-PH1-
|
Overhoule
|
Dismantle all pressure transmitter area Preheater and id fan
|
|
2024-07-02
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
MAIN-GATE-ACCES-CONTROL-OH-NR2
|
Inspection electrical and welding tools of contractor for OH NR2
|
Inspection electrical and welding tool of AQPA, SSM,CAT, TRUBA JAGA CITA, INDOPORLEN, RPM. Make report at form electrical for inspection electrical and welding tools for SHINAGAWA-TRUBA JAGA CITA-PINCURAN MAS-INDOPORLEN before 1 July 2024 ( ADI & EKA & MARPAUNG )
|
|
2024-07-02
1 year ago
|
NR.N2-OH
|
AGUS SUMIAJI SARBINI
|
304-3E2
|
MCC, Switchgear Maintenance
|
1. Clean Up MCC Room & Panel (100%) 2. Clean Up Switcgear Room & Panel (100%) 3. Clean Up Transformer (100%) 4. Clean up Capacitor & Panel (100%) 5. 364-MD1.M1 mesure capacitor (100%) 6. LV Protection Relay Tripping Test (100%) 7. LV Protection Relay Replacement (50%)
|
|
2024-07-01
1 year ago
|
NR.EL-01
|
Peny Prasetyo
|
464-KL1.T11
|
ganti kabel rtd
|
pabrikasi jalur kabel rtd
|
|
2024-07-01
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
MAIN-GATE-ACCES-CONTROL-OH-NR2
|
Inspection electrical and welding tools
|
Inspection electrical and welding tools of TOTAL PRIME ENGINEERING, TRUBA JAGA CITA, RPM ( EKA & ADI & MARPAUNG )
|
|
2024-06-29
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
464-KL1-AND-444-PH1
|
Make working permit for Over Haul
|
Making working permit area kiln and pre heater for Over Haul NR2 ( RIZAL )
|
|
2024-06-29
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
364-RM1-AND-334-WF
|
Make working permit for Over Haul
|
Making working permit area raw mill and feed bin for Over Haul NR2 ( YOGA )
|
|
2024-06-29
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
MAIN-GATE-ACCES-CONTROL
|
Inspection electrical and welding machine of contractor
|
Inspection electrical and welding machine from INDOPORLEN, TRUBA JAGA CITA and AQPA ( ADI & MARPAUNG TRUBA JAGA CITA & SUTRI TRUBA JAGA CITA )
|
|
2024-06-28
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CCTV-BURNER
|
Install panel box
|
Installing panel box at local ( PENY & ANDRI )
|
|
2024-06-28
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Completing data Juara Inovation
|
Completing data Juara Inovation and save at computer ( RIZAL )
|
|
2024-06-28
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WARE-HOUSE
|
Install panel lighting at area motor for heater power. Connect power input and insatall cable to heater motor
|
Install panel lighting at area motor for heater motor. Connected cable power input and install cable heater motor ( YOGA & FIRMAN & ANDRI )
|
|
2024-06-28
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-FA3-A
|
Prepare project give to vendor and pulling cable, install LCS, pulling I/O MCC
|
Preparing data of project, pulling cable, install LCS and I/O MCC to vendor ( PENY )
|
|
2024-06-28
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Completing wiring Input and Output panel
|
Completing wiring for Input and Output panel ( AGUS )
|
|
2024-06-28
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-BC4-AND-L1C-BC7
|
Clean up panel welding and lighting
|
Clean up panel lighting and welding from dust coal use hand blower and cloth
|
|
2024-06-27
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Service Grinding Machine Mechanic I
|
Service grinding machine from mechanic I., test functional result ok. Give tagging blue color ( ADI & FIRMAN )
|
|
2024-06-27
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Prepare document for audit
|
Prepare document for audit ( YURIZAL )
|
|
2024-06-27
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Continue labeling I/O
|
Labelling Input Output Panel ( AGUS )
|
|
2024-06-27
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CCTV-BURNER-FLOOR
|
Install box
|
Prepare box at work shop, Install support panel continue painting ( PENY & ADI )
|
|
2024-06-27
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
IDO-PUMP
|
Continue install lamp
|
Installing lamp ( ANDRI & FIRMAN & EVE DAVID )
|
|
2024-06-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
453-AE1
|
Install strainer line of instrument air
|
Install strainer line for instrument air ( FIRMAN & ANDRI )
|
|
2024-06-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-MECHANIC-NR1
|
Inspection electrical and welding machine
|
Inspection electrical and welding machine for Mechanic NR 1 ( ADI & EVE DAVID )
|
|
2024-06-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Continue wiring diagram Input & Output
|
Wiring diagram I/O panel ( AGUS )
|
|
2024-06-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
IDO-PUMP
|
Continue install receptacle
|
Install receptacle at IDO PUMP ( ANDRI & FIRMAN )
|
|
2024-06-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1-&-L3C-RE1-&-L1C-TR1
|
WBI instrumentation and electrical
|
WBI instrumentation and electrical are Coal Mill-Reclaimer and Tripper Coal ( PENY )
|
|
2024-06-26
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-AC2
|
Continue replace contactor auxilary LCS
|
Replacing contactor auxilary LCS ( YOGA & EVE RIZKY )
|
|
2024-06-25
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
IDO-PUMP
|
Install receptacle and lighting panel
|
Installing lighting panel and receptacle ( ANDRI & FIRMAN )
|
|
2024-06-25
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
JUARA INOVASI complete presentation data
|
Completing data for presentation JUARA INOVASI ( RIZAL )
|
|
2024-06-25
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Complete data check sheet
|
Completing data check sheet for PMS 463 MD1 years 2024. Scan file and save at server ( EMIS & ADI )
|
|
2024-06-25
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR service analyzer
|
PMR service analyzer such clean up probe, filter probe, diaphragm pump, dyer gas, filter balston. Check filter humidity sensor replace filter if found bad condition with spare filter ( AGUS )
|
|
2024-06-25
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR service analyzer L63 2K1-2k2-2k3 & 483 2k1
|
PMR service analyzer such clean up probe, filter probe, sample line, diaphragm pump, filter balston, dryer gas Check filter humidity sensor replace filter if found bad condition with spare filter ( YOGA & EVE RIZKY )
|
|
2024-06-24
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
IDO-PUMP
|
Replace lighting panel and install receptacle
|
Replacing panel lighting and installing receptacle ( ANDRI & FIRMAN )
|
|
2024-06-24
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR service CEMS
|
PMR service CEMS, clean up filter purge air unit dust hunter and flowsic also area motor, transducer A & B flowsic, swivel window t/r & reflector dust hunter also alignment, filter cabinet MCS 100 E, room of CEMS and span gas also H2 of room ( YOGA )
|
|
2024-06-24
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
PMR service medium voltage motor
|
PMR service medium voltage motor. Clean up area and filter motor, measure vibration, noise and temperature free and load side. Add grease 10 times to 15 times for free side and load side motor ( PENY )
|
|
2024-06-24
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
PMR service medium voltage motor
|
PMR service medium voltage motor, clean up area and filter motor. Measure vibration, noise and temperature free and load side. Add grease 10 times to 30 times for free side and load side motor ( AGUS )
|
|
2024-06-24
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
TENT-OH
|
Install timer for lamp
|
Installing timer for lamp every tent over haul, test functional time result ok ( FIRMAN & ANDRI )
|
|
2024-06-24
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
COOLER
|
Panel junction penyok
|
Repair/ganti panel junction transmitter (Rizky, Deden)
|
|
2024-06-24
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
WORKSHOP-TRUBA
|
Inspeksi Tools TRUBA
|
Inspeksi Tools truba Dan tagging tools Truba (Eka)
|
|
2024-06-24
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
364-FN2
|
Info Motor terbakar
|
Cek motor slide gate (info motor terbakar), cek motor aman, lepas couple ampere motor normal, (indikasi gate berat), ganti/r pair emergency dan push button (Rizky, Yana)
|
|
2024-06-24
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
RAWMILL
|
Motor harus di relokasi
|
Pindahkan motor, (Hariyanto, Amun)
|
|
2024-06-22
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
404-3E1
|
Kabel FO Abnormal
|
Lanjut Cek/replace kabel FO (Titok,Deden)
|
|
2024-06-22
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
WORKSHOP-CIVA
|
Inspeksi Tools CIVA
|
Inspeksi Tools Civa, Area Workshop Civa (Yana, Eka)
|
|
2024-06-22
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
RAWMILL-BLENDING-PREHEATER
|
Inspeksi Tools CIVA
|
Inspeksi Tools dan Taging tools Civa Area Blending PH, Rawmill (Rizky, Hariyanto)
|
|
2024-06-21
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
404-3E1
|
Kabel FO Abnormal
|
Lanjut pengecekkan kabel FO (Titok, Deden)
|
|
2024-06-21
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
L64-BF1
|
Cek Backfilter
|
Cek Backfilter (Yana)
|
|
2024-06-21
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
L34-BC2
|
Lampu mati
|
Ganti lampu TL, no 2,3,7,8,10,11,19 dari belakang (Rizky)
|
|
2024-06-21
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
394-RF2,RF3,RF6,RF7
|
Motor dan LCS kotor
|
Clean up motor dan panel LCS (Rizky, Supriadi Eve)
|
|
2024-06-21
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Complete data check sheet WBI grounding and lightning 2024
|
Completing data check sheet WBI grounding and lightning 2024 and scan file save at server ( EMIS & ADI )
|
|
2024-06-21
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Complete data wiring input/output
|
Completing data wiring I/O panel ( AGUS & PENY )
|
|
2024-06-21
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-
|
TPM 463 KL1 Tyre 3 complete data AM, safety and focus improvement, house keeping at local
|
Completing data TPM for AM, safety and focus improvement also print out file put at dash board . Do house keeping at local ( YOGA & RIZAL & EVE RIZKY )
|
|
2024-06-21
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
EX-393-SC6-AND-BLOWER-PORTABLE
|
Recondition motor and install cover fan
|
Recondition motor Ex 393 SC6, installing cover fan for blower portable ( ANDRI & FIRMAN )
|
|
2024-06-21
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-BL5
|
Replace grease tank for Auto Lubrication
|
Replacing grease tank of AUTO Lubrication with maximum level grease. Refiiling low grease tank to maximum level grease at work shop ( PENY & ADI )
|
|
2024-06-20
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
394-CV2_3_4,-394-RF2_3_4
|
LCS kotor
|
394CV2/3/4, 394 RF2/3/4 LCS kotor, clean up panel LCS (Rizky, Supriadi Eve)
|
|
2024-06-20
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
364-MS1
|
Motion Abnormal
|
Motion sensor abnormal, cek kontrol motion (Yana)
|
|
2024-06-20
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
ER-4
|
Kabel FO Abnormal
|
Kabel FO Abnormal, relokasi kabel FO (Titok, Deden)
|
|
2024-06-20
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
394-FA5
|
Motor bearing kasar
|
Motor bearing kasar, bongkar motor, ganti bearing, instal motor (Hariyanto, Eka, Amun)
|
|
2024-06-20
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
464-FX4
|
Motor short (terbakar)
|
|
|
2024-06-20
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L3C-RE1
|
PM reclaimer coal check or clean up all LCS, proximity Harrow and another thing
|
PM reclaimer coal check proximity Harrow, clean up LCS, clean up others instrumentation sensor ( RIZAL & EVE RIZKY )
|
|
2024-06-20
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
LEC-RE1
|
PM reclaimer coal replace cable Harrrow and control also change roller postion
|
PM reclaimer coal replace harrow cable and control also change roller position ( AGUS & PENY & ANDRI & FIRMAN )
|
|
2024-06-20
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L3C-RE1
|
PM reclaimer coal Clean up panel room
|
PM reclaimer coal clean up panel room from coal dust process use hand blower ( YOGA & IMAN )
|
|
2024-06-20
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Completing data check sheet WBI Panel Welding and Lighting 2024
|
Completing data check sheet WBI panel grounding, welding and lighting year 2024 continue scan also save data at server( ADI & EMIS )
|
|
2024-06-19
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
394-SC1
|
Panel tidak terpakai
|
Bongkar panel tidak terpakai (Rizky, Anton, Eka)
|
|
2024-06-19
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
COOLER
|
Transmitter menggangu area mekanik
|
Relokasi transmiter (Titok, Deden)
|
|
2024-06-19
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
RAWMILL
|
PMR Critical Motor dan Elinst Rawmill
|
PMR Service Critical Motor dan Elinst area Rawmill (Hariyanto)
|
|
2024-06-19
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
394-CV5-RF5
|
Motor dan LCS kotor
|
Clean up motor dan panel LCS (Rizky)
|
|
2024-06-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Service motor
|
Clean up body motor from dirt of dust use instrument air supply and equipment cleaning tools ( FIRMAN & ANDRI )
|
|
2024-06-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
WBI top blending, CT, PH and KILN
|
WBI top blending, CT, PH and KILN. Clean up motor use cloth from dirt of dust ( PENY & EVE RIZKY )
|
|
2024-06-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR service analyzer
|
PMR service analyzer, such as clean probe, filter probe, sample line, diaphragma pump, filter balston, dryer gas. Check filter humidity sensor replace if found bad condition ( RIZAL )
|
|
2024-06-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-2K1-&-463-2K1
|
PMR service analyzer
|
PMR service analyzer, such as clean up probe, filter probe, sample line, diaphragma pump, filter balston, dryer gas from dirt of dust. Check filter humidity sensor replace with spare if found bad condition ( AGUS )
|
|
2024-06-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
WBI feed bin RM, CT and 423 BF1
|
WBI area feed bin, RM, CT and 423 BF1. Clean up area motor from dirt of dust process use instrument air supply ( YOGA )
|
|
2024-06-19
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Completing data sheet WBI 363 RM1
|
Completing data check sheet WBI 363 RM1 of Feed bin-Raw Mill-CT-Bag Filter years 2023 ( EMIS & ADI)
|
|
2024-06-18
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
394-RF11
|
Motor dan LCS kotor
|
Clean up motor dan panel LCS (Rizky)
|
|
2024-06-18
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
COOLER-NORTH-SIDE-AND-333-HD1
|
Dismantle lamp that hit scafolding and repair or replace lamp that is off
|
Dismantle lamp of 473 north side and replace lamp test lamp result on ( FIRMAN & ANDRI )
|
|
2024-06-18
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR service CEMS
|
PMR service CEMS. Clean up filter purge air unit dust hunter and flowsic 100, transducer A & B flowsic 100, swivel window T/R & R dust hunter also alignment dust hunter. Clean up CEMS room and filter dust cabinet ( RIZAL & EVE RIZKY )
|
|
2024-06-18
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
PMR service medium voltage motor
|
PMR service medium voltage motor. Clean area and filter motor from dirt of dust use instrument air supply. Measure vibration-noise and temperature free and load side motor. Add grease 30 times and 15 times for FS & LS motor ( AGUS )
|
|
2024-06-18
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
completing data check sheet WBI and PMR
|
Completing data sheet WBI and PMR year 2023 and 2024, continue scan safe at server computer ( ADI & EMIS )
|
|
2024-06-18
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-EL1
|
PMR service elevator
|
PMR service elevator, clean up room of elevator and cage. Test functional elevator from 8th to 1st floor. Result good ( PENY & YOGA )
|
|
2024-06-18
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
GCT
|
Lampu area GCT mati
|
Service lampu area GCT (Titok, Deden)
|
|
2024-06-18
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
WELDING-PREHEATER
|
Socket 1 Phasa rusak
|
Ganti socket 1 Phasa panel welding area Preheater (Anton)
|
|
2024-06-18
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
BLENDING-SILO
|
Level Material eror
|
Check, dan clean up coating sensor Level Material Blending Silo Timur dan Barat (Rizky, Yana)
|
|
2024-06-14
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
4D4
|
Lampu mati
|
Ganti lampu selancar area 4D4 (Hariyanto, Anton)
|
|
2024-06-14
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
IKGA-AN3
|
Filter tembus (Probe rembes)
|
Ganti Probe IKGA (Yana)
|
|
2024-06-14
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
COALMILL
|
PMR Service Critical Motor
|
PMR Service Critical Motor Coalmill (Hariyanto)
|
|
2024-06-14
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Completing data check sheet PMR IR TAD-CCTV-Tscanner-Pyrometer and PM 363 MD1
|
Completing data check sheet PMR IR TAD-CCTV-T Scanner, Pyrometer and PM 363 MD1. Continue scan also save at computer ( ADI & EMIS )
|
|
2024-06-14
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Replace burned motor
|
Replace burned motor with spare motor ( FIRMAN )
|
|
2024-06-14
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Test run motor and put at ware house after finish
|
Test run motor and put at ware house for motor ( RIZAL & YOGA )
|
|
2024-06-14
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-WS1
|
Continue connection
|
Connection cable panel I/O ( PENY & EVE RIZKY )
|
|
2024-06-14
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1
|
Replace carbon brush and clean up carbon brush
|
Clean up and replace carbon brush ( AGUS & ANDRI )
|
|
2024-06-14
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
474-EP1
|
PMR Steck
|
PMR Service Steck Cooler (Titok)
|
|
2024-06-14
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
394-SC4
|
Motor dan LCS kotor
|
Clean up Motor dan panel LCS (Rizky)
|
|
2024-06-14
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
394-RF8
|
Motor dan LCS kotor
|
Clean up Motor dan panel LCS (Rizky)
|
|
2024-06-14
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
L64-RM1
|
Lampu mati
|
Ganti lampu atas Panel Liquid (Anton, Eka)
|
|
2024-06-14
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
RECLAMER-COALMILL
|
WBI Electric dan Instrument
|
WBI Electric dan Instrument Reclamer dan Coalmill atas (Rizky)
|
|
2024-06-13
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Make and completing data check sheet calibration damper and speed
|
Make data sheet and completing check sheet calibration damper and speed ( YURIZAL )
|
|
2024-06-13
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Replace burned motor blower for yellow blower motor
|
Replace motor blower with spare motor for yellow motor blower ( MUL )
|
|
2024-06-13
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Completing data check sheet PMR service medium voltage motor
|
Completing data sheet PMR service medium voltage motor ( ADI )
|
|
2024-06-13
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
RAWMILL
|
PMR Critical Motor dan Elinst Rawmill
|
PMR Critical Motor dan Elinst RawMill (Hariyanto)
|
|
2024-06-13
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1-
|
PMR service analyzer
|
PMR service analyzer such as clean up probe, filter probe, diaphragm pump, filter balston, dryer gas from dust of coal. Check filter humidity sensor replace if found bad condition with spare filter ( YOGA & EVE RIZKY )
|
|
2024-06-13
1 year ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-WS1
|
Continue connection I/O and install solenoid valve
|
Connect cable at I/O panel and install solenoid valve ( PENY & MUL & AGUS & ANDRI )
|
|
2024-06-13
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
WELDING-LIGHTING-PREHEATER
|
WBI panel Welding dan Lighting
|
WBI Welding Panel dan Lighting Area Preheater (Yana)
|
|
2024-06-13
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
CLINKER-COALMILL
|
WBI Electric dan Instrument
|
WBI Elinst Clinker Silo dan Coalmill Bawah (Rizky)
|
|
2024-06-13
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
4D4-RF3
|
Motor dan panel LCS kotor
|
Clean up Motor dan panel LCS (Rizky)
|
|
2024-06-13
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
424-EP1
|
PMR Service Cems
|
Service CEMS (Rizky, Deden)
|
|
2024-06-12
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
WORKSHOP
|
Fabrikasi Panel dan Service Vacum
|
Lanjut Fabrikasi Panel dan Service Vacum dari ER4 (Hariyanto, Amun)
|
|
2024-06-12
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
COALMILL
|
Service lampu
|
Service Lampu area Pister Feeder (Anton, Eka)
|
|
2024-06-12
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
444-2K2-DAN-2K1
|
PMR Service Analyzer
|
Service Analyzer AN1 dan AN2 (Yana, Deden)
|
|
2024-06-12
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
4D4-PP1
|
Motor dan LCS kotor
|
Clean up Motor dan panel LCS (Rizky)
|
|
2024-06-12
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
4D4-BL2
|
Motor dan LCS kotor
|
Clean up Motor dan panel LCS (Rizky)
|
|
2024-06-12
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
394-RF9
|
Motor dan LCS kotor
|
Clean up Motor dan Panel LCS (Rizky)
|
|
2024-06-12
1 year ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
394-CV7
|
Motor dan LCS kotor
|
Clean up Motor dan panel LCS (Rizky)
|
|
2024-06-12
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-WS1
|
Termination I/O and solenoid valve
|
Termination cable at I/O panel and solenoid valve ( PENY & ANDRI )
|
|
2024-06-12
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-EL1
|
Repair door elevator 1st floor
|
Repair door of elevator at 1st floor service limit switch for door. Test run elevator functional from 8th to 1st floor result ok ( AGUS & EVE RIZKY )
|
|
2024-06-12
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
PMR service IR TAD, CCTV, T Scanner, Pyrometer
|
PMR service IR TAD, CCTV, T scanner, Pyrometer such as clean area equipment, lens, probe from dirty dust process ( YOGA )
|
|
2024-06-12
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-AND-443-2K1
|
PMR service analyzer
|
PMR service analyzer. Clean up probe, filter probe, sample line, diaphragm pump, filter balston, dryer gas from dirty dust. Check filter humidity sensor replace filter if found bad with spare filter ( RIZAL )
|
|
2024-06-12
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-463-KL1-L63-RM1--WS-ELCTRIC-NR1
|
Check rubbish bin for B3-scrap and domestic must right at its placement
|
Check rubbish bin at local, bring bad rubbish bin to scrap room of environment department. Bring god bin to local and make name of rubbish bin for RED-GREEN and YELLOW ( ADI & EMIS & CIVACON MUL )
|
|
2024-06-12
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Completing data check PM 363 MD1 and PMR service motor and pyrometer
|
Completing data check sheet PM 363 MD1 and PMR service mv motor and pyrometer
|
|
2024-06-11
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
IKGA-AN3
|
Cek Analyzer
|
Cek Analyzer (Yana)
|
|
2024-06-11
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
LIFT-PH
|
Oli rel lift
|
Fabrikasi oli rel Lift (Yana)
|
|
2024-06-11
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
WORKSHOP
|
Fabrikasi Panel LBS
|
Lanjut Fabrikasi Panel LBS (Amun, Hariyanto)
|
|
2024-06-11
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
KILN
|
PMR Critical Motor dan Elinst Kiln
|
PMR Critical Motor dan Elinst Kiln (Hariyanto)
|
|
2024-06-11
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
BURNER-COOLER
|
Camera Baru Burner kurang jelas, lampu area Burner dan Cooler ada mati
|
Cek Camera baru Burner, Ganti lampu area Burner, Ganti lampu area Cooler (Titok, Deden)
|
|
2024-06-11
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
394-SC5
|
Motor dan LCS kotor
|
Clean up Motor dan panel LCS (Rizky, Anton, Eka)
|
|
2024-06-11
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
394-RF12
|
Motor dan LCS kotor
|
Clean up Motor dan panel LCS (Rizky, Anton, Eka)
|
|
2024-06-11
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
RAWMILL
|
Lampu selancar atas pintu Rawmill mati
|
Ganti lampu selancar atas pintu Rawmill (Rizky, Anton, Eka)
|
|
2024-06-11
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
364-BC6
|
Lampu Selancar mati
|
Ganti lampu selancar, (Rizky, Anton, Eka)
|
|
2024-06-11
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-WS1
|
Connect cable motor and LCS, pulling cable solenoid and LCS
|
Pulling cable solenoid valve and LCS, connect cable motor and LCS ( PENY & ANDRI & FIRMAN )
|
|
2024-06-11
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR service CEMS
|
PMR service CEMS. Clean up filter purge air unit for dust hunter and flowsic. Clean up transducer A and B flowsic, swivel window T/R and R dust hunter also alignment dust hunter, clean up CEMS room, and filter cabinet MCS 100 E ( YOGA )
|
|
2024-06-11
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
PMR service motor
|
PMR service medium voltage, clean up area and filter motor. Measure vibration-noise and temperature free side and load side, add grease from 10 times to 30 times for free and load side motor if found vibration > 4 mm/s and noise > 2 gE ( AGUS )
|
|
2024-06-11
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Completing data check sheet PM 363 MD1 and PM Weigh Feeder
|
Completing data check sheet PM 363 MD1 and PM Weigh Feeder ( ADI & EVE RIZKY )
|
|
2024-06-10
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
WORKSHOP
|
Panel LBS
|
Prepare plate, dan fabrikasi panel LBS (Hariyanto,Amun, Anton)
|
|
2024-06-10
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
464-FXK
|
Motor bearing kasar
|
Bongkar motor, Ganti bearing motor, instal motor (Hariyanto, Amun, Anton)
|
|
2024-06-10
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
IKGA-AN3
|
PMR Service
|
PMR Service (Yana)
|
|
2024-06-10
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
L74-RF1
|
Lampu area tangga mati
|
Ganti lampu (Rizky, Deden)
|
|
2024-06-10
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
L94-RF1
|
Lampu mati
|
Ganti lampu (Rizky, Deden)
|
|
2024-06-10
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
L64-BF1
|
Lampu mati
|
Ganti lampu (Rizky, Deden)
|
|
2024-06-05
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
RAWMILL-N2
|
PMR Critical Motor dan Elinst Rawmill
|
PMR Critical Motor dan Elinst Rawmill (Hariyanto)
|
|
2024-06-05
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
FEEDBIN-RAWMILL-N2
|
PMR Safety Device area Feedbin dan Rawmill (BC,WF)
|
Cek all Safety Device area Feedbin dan Rawmill (BC,WF), croscek WF (Anton,Eka)
|
|
2024-06-05
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
364-BC3
|
Indikasi Ready BD bermasalah
|
Cek indikasi Ready BD (Yana, Davin EVE)
|
|
2024-06-04
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
LIFT-PH-N2
|
Lampu area lift bawah mati, dan PMR sump pump
|
Ganti lampu dan tes sump pump (Yana, Deden)
|
|
2024-06-03
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
CO2-SYSTEM
|
CO2 cepat habis
|
Cek CO2 system (Titok,Eka)
|
|
2024-06-03
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
CEMS-ER4
|
CEMs room dan ER 4 area genset kotor
|
Clean up CEMs room dan ER 4 area genset kotor (Anton,Amun,Deden)
|
|
2024-06-07
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
334-WF3,4-334-SX3,4
|
Panel LCS kotor
|
Clean up panel (Rizky)
|
|
2024-06-07
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
464-FXAM2
|
Lampu selancar tidak terpakai
|
Bongkar lampu (Rizky)
|
|
2024-06-07
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
ER4
|
PMR MCC Load
|
PMR MCC Load (Rizky)
|
|
2024-06-06
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
KILN-EPCOOLER-COOLER
|
WBI inspection
|
WBI inspection (Rizky)
|
|
2024-06-06
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
474-CC1
|
Panel 1 Phasa tidak safety hanya digantung
|
Bongkar panel (Rizky)
|
|
2024-06-06
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
474-CC1
|
Panel 1 Phasa area atas kotor
|
Clean up panel (Rizky)
|
|
2024-06-05
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
VIBRO-SILO-BINFEED
|
Panel vibro kotor
|
Clean up panel dan instal kanopi (Rizky,Amun, Ahmad EVE)
|
|
2024-06-05
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
334-AC2-SX2
|
Panel motion mitronic kotor dan tertimpa material
|
Clean up panel dan instal kanopi (Rizky,Amun,Ahmad EVE)
|
|
2024-06-05
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
334-SX1
|
Tutup fan motor, lepas
|
Pasang kembali tutup fan motor (Rizky,Ahmad EVE)
|
|
2024-06-05
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
334-AC1
|
Panel load cel kotor dan tidak tertutup
|
Clean up dan tutup panel (Rizky,Ahmad EVE)
|
|
2024-06-05
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
334-BC2
|
Lampu TL no 3 dari belakang mati
|
Ganti lampu (Rizky, Ahmad EVE)
|
|
2024-06-05
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
334-BC1
|
Lampu TL no,5/6/9 dari belakang mati
|
Ganti lampu (Rizky,Ahmad EVE)
|
|
2024-06-04
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
414-BL1
|
Lampu area BL mati (gelap)
|
Clean up panel dan kasih kanopi (Rizky,Amun)
|
|
2024-06-03
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
394-RF4
|
Panel LCS miring, support rusak
|
Repair support tiang LCS (Rizky,Amun)
|
|
2024-06-03
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
394-RF2
|
Panel LCS miring, support rusak
|
Repair support tiang LCS (Rizky,Amun)
|
|
2024-06-03
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
IKGA-AN3-N2
|
Oksigen tinggi, kebocoran pada salah satu SV Purging
|
SV Purging 1 dilepas, tunggu order, sementara pakai Purging 2 (Yana, Rizky)
|
|
2024-05-31
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
LIFT-PH
|
Pintu lift, roller lepas dan rusak, list pintu rusak
|
Ganti roller dan list pintu (Yana, Rizky, Deden)
|
|
2024-06-10
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-CT1
|
Replace solenoid that is not work and pressure switch
|
Replace solenoid valve and pressure switch. Prepare canopy for pressure switch continue install at local ( RIZAL & ANDRI )
|
|
2024-06-10
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
PMR service medium voltage motor
|
PMR service medium voltage motor, clean up area and filter motor from dirty use instrument air supply. Measure vibration-noise and temperature free and load side motor. Add grease 10 to 15 times for free side and load side if found vibration > 4 mm/s and noise > 2 gE ( PENY )
|
|
2024-06-10
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-WS1
|
Install LCS and connect cable to motor
|
Prepare canopy of LCS. Install LCS at local ( YOGA & FIRMAN )
|
|
2024-06-10
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
completing data check sheet WBI
|
Completing data check sheet WBI
|
|
2024-06-07
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-WS1
|
Pulling cable to ER3
|
pulling cable from bottom CT to ER3 ( ALL crew )
|
|
2024-06-06
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
MAINGATE-BUILDING
|
AC mati di ruangan induksi akses kontrol
|
Disconnect sambungan untuk AC Pulling kabel baru khusus untuk AC Connect ke MCB dan stop kontak AC Test OK
|
|
2024-06-06
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
M3A-WP3
|
MC lengket
|
Perbaikan cubicle MCC Ganti MC dari ABB 80A ke LS 100A Ganti MCCB dari ABB ke Schneider, buat lubang dudukan baru Ganti kabel out MCCB ke MC
|
|
2024-06-06
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-BC7-SHUTTLE
|
Clean up panel control and PLC tripper
|
Clean up panel control and PLC tripper from dirty coal dust ( RIZAL & EVE RIZKY )
|
|
2024-06-06
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-BC7-SHUTTLE
|
Clean up motor brake, area motor and panel
|
Clean up motor brake, area motor and panel from coal dust process. Install lamp 1 each test on result ok ( PENY & FIRMAN )
|
|
2024-06-06
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-BC7
|
Clean up rail cable and tray
|
Clean up rail cable and tray also all panel at south side from coal dust process with instrument air and hand blower ( AGUS & ANDRI )
|
|
2024-06-06
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-BC5-AND-BC7
|
Check water spray
|
Test functional water spray, at L1C BC7 found contact solenoid valve is not function well, replace limit switch with spare test functional result ok. L1C BC5 test functional found stick flapper is not long enough, replace stick flapper with spare test functional result ok ( YOGA & ADI )
|
|
2024-06-05
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
MAINGATE-BUILDING
|
AC mati di ruangan induksi akses kontrol
|
Ruangan induksi di akses kontrol AC tidak bisa dinyalakan bareng (2Ea AC) Cek MCB untuk 1 ruangan (2 AC, lighting ruangan dan TV) Preparing jalur kabel untuk tarikan baru
|
|
2024-06-05
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
D3A-CP3
|
Tidak bisa loading, indikasi display sudah loading
|
Cek piston load unload belum buka cek tegangan di socket solenoid 0 Vac cek dipanel kontrol kabel untuk solenoid lepas diterminal perbaikan kabel dan kencangkan terminasi test run ok
|
|
2024-06-05
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SC1-AND-363-LQ2
|
Test run and service motor
|
Test run motor and service motor ( PENY & AGUS )
|
|
2024-06-05
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Prepare canopy motor
|
Fabrication canopy motor ( FIRMAN & ANDRI )
|
|
2024-06-05
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-CT1
|
Check pressure switch
|
Check pressure switch at local compare with CCR ( RIZAL & YOGA & Production & MUKLAS )
|
|
2024-06-05
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Complete data check sheet PMR analyzer
|
Completing data PMR analyzer check sheet ( ADI & EVE RIZKY )
|
|
2024-06-05
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Repaire and replace bearing motor. Clean up motor 30 KW
|
Repaire and replace bearing motor also clean up motor 30 KW ( FIRMAN & EVE RIZKY )
|
|
2024-06-04
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-2K1-&-463-2K1
|
PMR service analyzer
|
PMR service analyzer, such as clean up probe and flange, filter probe, sample line, membran pump, balston filter, dryer gas. Check filter humidity, replace filter if found bad condition ( RIZAL )
|
|
2024-06-04
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-HC1
|
Install AUTO lubrication
|
Install AUTO lubrication ( PENY & ANDRI )
|
|
2024-06-04
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR service CEMS
|
PMR service CEMS, such as clean up filter purge air unit dust hunter and flowsic 100. Clean up transducer A & B Flowsic 100 and swivel window transducer and reflector also reflector Dust Hunter. Clean up CEMS room and gas botle gas room also filter cabinet MCS 100 E ( YOGA )
|
|
2024-06-04
2 years ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
363-RM1
|
PMR service medium voltage motor
|
PMR service medium voltage. Clean up area and filter motor. Measure vibration, noise and temperature free and load side motor. Add grease 10 times to 30 times for free and load side motor ( AGUS )
|
|
2024-06-04
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
TRAFO-NAR2
|
Drum Oli Trafo berantakan
|
Rapihkan drum oli (pindahkan dari OTR A ke Trafo OTR B) Clean up Area Trafo dan MSS
|
|
2024-06-04
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
66B-CX4
|
Pemasangan kompresor baru
|
Commisioning dan Test Run Pressure 5,7 Bar Cek tegangan input kompresor 373 Vac Cek Arus Input kompresor 300 A - nameplate main motor 323A
- nameplate cooling fan 5.5A (2Ea)
|
|
2024-06-03
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
GENSET-NAR2
|
Banyak Ceceran Oli
|
Clean up ceceran oli di lantai dan body genset Perbaikan kebocoran oli pada baud dengan threebond dan bold tightenning
|
|
2024-06-03
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
66B-CX4
|
Pemasangan kompresor baru
|
Tie in Kabel Input breaker cubicle MCC ke Bar Pasang scun kabel tarikan LCS ke Kompresor Connect kabel di LCS dan di terminal input kompresor
|
|
2024-06-03
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
complete data wiring panel I/O area raw mill and preheater
|
Completing data wiring I/O of raw mill and preheater ( AGUS )
|
|
2024-06-03
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
Problem probe often retract but there is alarm when inside probe
|
Service analyzer, found valve safety relief late work when energize ( RIZAL )
|
|
2024-06-03
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-HS1
|
Replace lamp at room of HS
|
Replace lamp that are off with new spare lamp. Test on result ok ( ANDRI & ENDEN )
|
|
2024-06-03
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
PMR service critical motor and LSR
|
PMR service critical motor and LSR. Clean up area and filter motor, measure vibration-noise and temperature free and load side motor. Add grease from 5 times to 10 time for free and load side if found vibration > 4 mm/s also noise > 2 gE ( PENY & ADI & EVE RIZKY )
|
|
2024-06-01
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
D3A-CP3
|
Display Mati
|
Cek panel MCB kontrol trip ada bau coil MC overheat ganti main MC, test simulasi saat pindah ke delta MC delta tidak energize preparing lubang dudukan semua MC ganti semua MC dari Schneider ke LS kabel motor cooling fan dan kabel input untuk kontrol ada indikasi overheat di tapping input MC delta ganti kabel input motor cooling fan dan rewiring kabel input kontrol test run OK
|
|
2024-05-31
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
66B-CX4
|
Pemasangan kompresor baru
|
Preparing kabel 240 mm preparing kabel 95 mm pabrikasi kabel tray LCS ke Kompresor Install kabel tray pulling kabel 240 mm lcs ke kompresor ganti breaker cubicle MCC dari 400 A ke 680 A
|
|
2024-05-30
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
LIGHTING-JALAN
|
Lampu Mati
|
Lampu jalan area trucklift sampai arah reclaimer batubara mati ganti lampu 4 tiang test OK
|
|
2024-05-31
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-443-PH1
|
Completing data wiring panel Input and output
|
COmpleting data wiring panel for I/O ( AGUS & PENY )
|
|
2024-05-31
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-PLANT-BUILDING
|
Inspection electrical and welding tools
|
Inspection electrical and welding tools. Repaire cable extention cable, portable lamp, grinding machine, drilling machine, and cutting machine full fill standard company ( ADI & YOGA & EVE RIZKY )
|
|
2024-05-31
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-FA5A
|
Replace bearing motor
|
Replace bearing motor ( RIZAL & ANDRI & FIRMAN )
|
|
2024-05-29
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
WS-N2-AREA-FABRIKASI-MEKANIK
|
Butuh lampu penerangan
|
Tambah lampu penerangan
|
|
2024-05-29
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
334-BC1
|
Lampu Mati dan Tidak Terpakai
|
Bongkar Lampu (Untuk di Repair)
|
|
2024-05-29
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
334-BC2
|
Lampu Mati dan Tidak Terpakai
|
Bongkar Lampu (Untuk Di Repair)
|
|
2024-05-30
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
364-BC1
|
Motor Selalu Tertimbun Material (Sirkulasi fan abnormal)
|
Clean Up Motor dan kasih Kanopy (Penghalang)
|
|
2024-05-30
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
364-SR1
|
Socket Legrand panel 1 Phasa rusak (3 buah)
|
Ganti Socket Legrand Panel
|
|
2024-05-30
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
364-SR1
|
Lampu TL atas pompa Grease mati
|
Ganti Lampu
|
|
2024-05-30
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
INPUT-AND-OUTPUT-COOLER
|
Pulling cable profibus
|
pulling cable profibus ( ANDRI )
|
|
2024-05-30
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1-
|
PMR service analyzer
|
PMR service analyser such as clean up probe, sample line, filter probe, membran pump. balston filter, dryer gas from dust coal ( RIZAL & YOGA )
|
|
2024-05-30
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-WB1
|
Dismantle motor
|
Dismantle motor and bring to work shop ( PENY & ADI & FRIMAN & ANDRI )
|
|
2024-05-30
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-FA5-&-433-RF1
|
Prepare spare motor
|
Preparing spare motor ( PENY & ADI & FIRMAN & ANDRI )
|
|
2024-05-30
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
Replace gun grease
|
Check at local, do refilling grease and change battery for auto gun grease ( AGUS & EVE RIZKY )
|
|
2024-05-29
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FA1-2
|
Move cable I/O
|
Move cable I/O ( RIZAL & YOGA )
|
|
2024-05-29
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
TPM-463-KL1-TRYE-3
|
Assesment
|
Accompany judge for assesment TPM at work shop and local area ( YOGA & RIZAL )
|
|
2024-05-29
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-BC4
|
Replace lamp that is off
|
Replace lamp that is off. Test on result ok ( AGUS & FIRMAN )
|
|
2024-05-29
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-FN1-P1
|
Draft value showing 0
|
Check draft at local compare at CCR ( RIZAL & YOGA & EVE RIZKY )
|
|
2024-05-29
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
WBI electrical and instrumentation
|
WBI electrical and instrumentation ( PENY & EVE RIZKY )
|
|
2024-05-29
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-PLANT-BUILDING
|
Inspection electrical and welding tools
|
Inspection electrical and welding tools. Repaire cable power electrical tools such as drilling machine, extention cable, portable lamp. cutting machine to company standard ( ADI & ANDRI )
|
|
2024-05-28
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
LIGHTING-JALAN
|
Area Trucklift Lampu Mati
|
* Cek lampu jalan area trucklift - mcb tidak ada yg trip
- lampu jalan menyala hanya 1 mata dari 3 mata dan juga ada yang mati total (total lampu ada 6 tiang)
* Cek lampu jalan area office afr sebelah trucklift - lampu sorot ada yang mati
- cek panel ada yang trip, onkan mcb OK
|
|
2024-05-28
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
444-CX2
|
Indikasi Sensor Abnormal
|
* Indikasi sensor air filter bintang-bintang - cek flexible kempot saat kompresor loading
- saat diposisikan unload indikasi airfilter terbaca
* Indikasi DP separator bintang-bintang - flushing tubing
- ganti sensor
- test OK
- coba bongkar sensor dp separator ex 444-cx2, sensor basah dan kabel ada yg putus
|
|
2024-05-28
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
333-MS1
|
Oil come inside motor. Replace bearing motor metal separator
|
Clean up area motor stator and rotor use special liquid, replace bearing 6206 2 each and 6303 1 each. Install back al local ( PENY & ANDRI & FIRMAN & ADI )
|
|
2024-05-28
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR service analyzer
|
PMR service analyzer such as cleaning probe, filter probe, membran pump, filter balston, dryer gas, sample line from dirty ( YURIZAL )
|
|
2024-05-28
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
TPM-463-KL1-TYRE-3
|
Complete data TPM and make basket cage for equipment cleaning tools
|
Completing data TPM and prepare basket cage for equipment cleaning tools also painting green color ( YOGA & EVE RIZKY )
|
|
2024-05-28
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
PMR service medium voltage motor
|
PMR service medium voltage motor, clean up area and filter. Measure vibration-noise-temperature at free and load side. Add grease 20 to 30 times for free and load side if found vibration up to 4 mm/s and noise up to 2 gE ( AGUS )
|
|
2024-05-28
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-MECHANIC-NR1
|
Inspection electrical and welding tools
|
Inspection electrical and welding tools. Repaire cable for extention cable, grinding machine, cutting machine, drilling machine ( ADI & FIRMAN & ANDRI )
|
|
2024-05-28
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-TYRE-3-
|
TPM complete data absention, AM, safety, FI 2nd theme
|
Complete data absention, AM, safety and Focus Improvement and theme ( PENY & YOGA & YURIZAL )
|
|
2024-05-28
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR service CEMS
|
PMR service CEMS, such as clean up filter purge air unit, transducer A & B, swivel window T?R & R alignment dust hunter, room CEMS and bottle gas ( RIZAL )
|
|
2024-05-28
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
PMR service medium voltage motor
|
PMR service medium motor, clean up area and filter motor. Measure vibration-noise and temperature for free and load side, add grease 10 to 15 times at free and load side motor ( AGUS )
|
|
2024-05-27
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
TRAFO-NAR1_2
|
WBI
|
WBI Trafo MV OTR 2, 3, 301, 302, A, B
|
|
2024-05-27
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
M3A-WP3
|
trip breaker di MCC
|
Cek kontaktor lengket cek motor ground discouple dan disconnect kabel power motor bawa ke workshop untuk perbaikan (rewinding) drawout cubicle mcc bawa ke workshop untuk perbaikan
|
|
2024-05-27
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
M3A-WP1
|
Motor Ground
|
Install motor di lokal (setelah service rotor dan stator karena karat, ganti bearing 2 x 6214 zz, ganti cooling fan karena rusak, retapping lubang untuk baud kabel ground dan cover, perbaikan dudukan cover fan) test putaran motor cek arus noload fasa R=34 A; S=36 A; T=37 A
|
|
2024-05-24
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
M3A-WP1
|
Motor Ground
|
Discouple dan disconnect kabel power motor bawa ke workshop bongkar motor, coil motor basah panaskan motor dengan heater
|
|
2024-05-24
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
M34-WP5
|
Trip Breaker di MCC
|
Cek resistan coil motor OK Cek resistan isolasi motor OK Cek induktansi motor unbalance nilainya buka cover motor bau coil motor overheat discouple motor dan disconnect kabel power bawa ke workshop untuk di rewinding
|
|
2024-05-22
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
444-CX2
|
Arah Putaran Motor Terbalik
|
Test run setelah rewinding motor Balik arah putaran main motor test run cek tegangan saat kompresor unloading 350 Vac balance
|
|
2024-05-24
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-TYRE-3
|
TPM gemba area 5R, install sign safety
|
Clean up area 5R, install guarding shell cooling fan and sign safety ( ALL Crew Electric )
|
|
2024-05-24
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER5-&-ER6
|
Clean up ER and top panel MV, ACB and MCC
|
Clean up filter and electric room , top panel medium voltage and top panel trafo at ER5. Clean up include inside MCC and ACB ( IMAN & FIRMAN )
|
|
2024-05-24
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-GQ1
|
WBI KILN, Cooler, Burner Floor, Clinker Silo
|
WBI area KILN, COOLER, BURNER FLOOR, and CLINKER SILO ( YOGA & EVE RIZKY )
|
|
2024-05-24
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
WBI top blending, CT, Pre heater and KILN
|
WBI top blending, CT, Pre heater, and KILN ( PENY )
|
|
2024-05-24
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
PPUP-INSPECTION-ELECTRICAL-AND-WELDING-TOOLS
|
Inspection electrical and welding tools
|
Inspection electrical and welding tool of PPUP work shop ( ADI & ANDRI )
|
|
2024-05-22
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-PPUP
|
Check electrical and welding tools
|
Check electrical and welding tools, do some repaire cable for welding machine, extention cable, grinding machine, portable lamp because grounding cable are not connected ( ADI & FIRMAN & ANDRI )
|
|
2024-05-22
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
WBI electric and instrumentation
|
WBI electric and instrumentation ( PENY )
|
|
2024-05-22
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-AND-443-2K1
|
PMR service analyzer
|
PMR service analyzer such as. clean filter probe, probe, membran pum, filter baltson , dryer gas, filter humidity sesnor from dirt ( YOGA & EVE RIZKY )
|
|
2024-05-22
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1-
|
PMR service CEMS
|
PMR service CEMS such as clean up filter purge air unit, transducer A & B, swivel windows dust hunter ( YOGA & EVE RIZKY )
|
|
2024-05-22
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
Test gas NO
|
Test gas NO ( YOGA & EVE RIZKY )
|
|
2024-05-22
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
Replace vibration sensor
|
Replace vibration sensor. measure vibration at local compare with CCR ( AGUS & ANDRI )
|
|
2024-05-22
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-WI1-M3
|
Replace cable power motor 4c x 50 mm, connect cable and test run
|
Replace cable power motor, connect cable at LCS and motor, test run measure ampere motor result ok ( PENY & ADI & FIRMAN )
|
|
2024-05-21
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
ALBANNA-BUILDING
|
Lampu sorot area parkir mati
|
Ganti lampu sorot LED 2 Ea Test OK
|
|
2024-05-21
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
M04-LM1
|
Sensor belum di sambung ke I/O
|
Wiring kabel di panel PLC dan cubicle MCC Pulling kabel dari LCS M04-WP8 ke M04-WP7 Pulling kabel dari LCS M04-WP7 ke Sensor (kabel spare hanya ada 1 core di tiap LCS)
|
|
2024-05-21
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
RIVERPUMP-BUILDING
|
Lampu Mati
|
Ganti lampu dari HPIT ke Lampu LED 200W 1 Ea Test OK
|
|
2024-05-21
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
RIVERPUMP-BUILDING
|
cctv mati
|
CCTV area pompa M04-WP1 s.d. 4 mati Cek socket basah karena air hujan, ganti socket RJ45 install juction box masukkan kabel ke juction box test OK
|
|
2024-05-20
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
MAINGATE-BUILDING
|
CCVT gambar tidak jelas
|
Coba clean up masih sama coba ganti converter balun masih sama coba lepas camera pasang lansung di DVR OK kemungkinan kabel sudah rusak preparing ip cam dan ukur kebutuhan kabel ethernet
|
|
2024-05-20
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
TRAFO-NAR1_2
|
WBI
|
WBI Trafo MV OTR 2, 3, 301, 302, A, B
|
|
2024-05-20
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Install way of instrument air auto grease pump
|
Prepare pipe also make drut pipe( ADI & ANDRI )
|
|
2024-05-20
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-EL1
|
Replace V-belt and service limit switch door all from 1st to 8th
|
Replace v-belt, service l/s from 1st to 8th door ( PENY & FIRMAN )
|
|
2024-05-20
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
PMR service IR TAD, camera burner, T scanner and CCTV
|
PMR service IR TAD temperature, CCTV, T scanner and camera burner. Clean up lens and probe ( RIZAL )
|
|
2024-05-20
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
PMR service medium voltage motor
|
PMR service medium voltage motor. Clean up area and filter motor, measure vibration-noise-temperature load and free side. Add grease 10 time to 20 times if found vibration > 4 mm/s also noise > 2 gE ( AGUS & EVE RIZKY )
|
|
2024-05-20
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
PMR service medium voltage motor
|
PMR service medium voltage motor. Clean up area and filter motor, measure vibration-noise and temperature fix and load side motor. Add grease 5 time until 15 times if found vibration up to 4 mm/s and noise up 2 gE ( YOGA )
|
|
2024-05-17
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
EAST-HOUSING
|
Panel Listrik Mess No1 Belum ada Grounding
|
Install Grounding Rod, cek resistan 1 ohm pulling kabel panel distribusi ke grounding rod connect kabel di panel dan grounding rod Perapihan kabel
|
|
2024-05-17
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
TPM Tyre 3
|
Clean up area SGA Tyre 3 from dust use equipment cleaning tools and instrument air supply. Also tidy up cable shell cooling motor cable at cable tray (ALL CREW ELECTRIC NR1 )
|
|
2024-05-16
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
EAST-HOUSING
|
Panel Listrik Mess No1 Belum ada Grounding
|
Pasang Grounding rod baru (1 batang 4m) Cek dengan earth tester masih tinggi 5.9 Ohm
|
|
2024-05-16
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-MECHANIC
|
Install LCS roll machine
|
Install LCS for roll machine ( FIRMAN & ANDRI )
|
|
2024-05-16
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-BE1-BOTTOM
|
Check tilt sensor
|
Adjust tilt sensor position ( RIZAL & EVE RIZKY )
|
|
2024-05-16
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
Monitor functional analyzer
|
Monitor functional analyzer ( RIZAL & EVE RIZKY )
|
|
2024-05-16
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-GQ1-AND-CLINKER-SILO
|
WBI Hoist Crane
|
WBI Hoist Crane ( PENY )
|
|
2024-05-16
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-BC6-&-BC7
|
Water spray can not stop
|
Replace s/v test functional result ok ( YOGA )
|
|
2024-05-16
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SCA-AND-MV-MOTOR
|
Monitor bearing motor
|
Clean up area motor and filter.add grease if found vibrationg and noise abnormal ( AGUS )
|
|
2024-05-16
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3-AND-ER6
|
Clean up to panel MV and trafo
|
Clean up filter fan an front of ER6, also clean up room of electric rooms and top panel MV and trafo ( ADI & IMAN )
|
|
2024-05-15
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
MAINGATE-BUILDING
|
Lampu Mati
|
Ganti Lampu TL 14 Ea Ganti Lampu Ulir 3 Ea Ganti lampu tembak 100W 2Ea Ganti lampu selancar 1Ea
|
|
2024-05-15
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
581-CX1
|
trip breaker di MCC
|
Breaker trip saat pindah ke kontaktor delta Cek resistan coil dan isolasi main motor dan motor fan OK Cek finger contactor OK Cek tegangan output contactor (posisi kabel ke motor disconnect) balance 390 Vac OK Cek setting MCCB di MCC, rubah Io dari 630 A ke 400 A dan Isd dari 1.5 ke 5 Test Run OK
|
|
2024-05-15
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-BE1
|
fabrication box grease
|
fabrication box grease for bucket elevator ( AGUS & EVE RIZKY & MADIN )
|
|
2024-05-15
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
WBI camera burner and clinker silo
|
WBI camera burner and clinker silo ( PENY )
|
|
2024-05-15
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-CT1
|
Solenoid valve for water and air are not function
|
Clean up s/v for water and air, found many dirty inside membran s/v water. result test ok ( RIZAL & ANDRI )
|
|
2024-05-15
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FA1-AND-FA2
|
Install sensor RTD and vibration
|
Install sensor RTD and vibration ( RIZAL & ANDRI )
|
|
2024-05-15
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR service CEMS
|
PMR service CEMS, such as clean up transducer A & B flowsic 100, clean up swivel window dust hunter, clean up filter purge air unit, calibration zero and span FIDOR ( YOGA & ADI )
|
|
2024-05-14
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
66A-CX3
|
Kabel Output Contactor Delta Overheat
|
Coba kencangkan baud contactor dudukan kontak finger patah karena sudah getas Buat lubang dudukan untuk kontaktor Ganti contactor delta dari schneider ke LS Ganti kabel jumper untuk Output MC Delta dan Star, karena kabel existing sudah overheat Test OK
|
|
2024-05-14
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
D33-CX4
|
Main Motor Kompresor Panas
|
Install External Fan untuk pendinginan main motor Wiring kontrol untuk start stop motor fan Test OK
|
|
2024-05-14
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG
|
Clean up area room HRG and filter
|
Clean up area HRG and filter use hand blower ( JAJAT & ADI )
|
|
2024-05-14
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1
|
Clean up motor
|
Clean up area motor and filter motor, Check carbon brush condition result condition carbon brush are ok ( AGUS & EVE RIZKY )
|
|
2024-05-14
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-MD1-&-473-FN7
|
Clean up motor
|
Clean up area motor and filter motor from dust, check carbon brush condition. Result carbon brush condition are ok ( PENY & FIRMAN )
|
|
2024-05-14
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
453-PF1-AND-483-PF1
|
Check load cell and calibration pfister feeder
|
Replace load cell for 453 PF1 continue calibration zero and span pfister feeder. Check calibration zero and span 483 PF1 ( RIZAL & YOGA & ANDRI )
|
|
2024-05-14
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
PANEL-INPUT-&-OUTPUT-WEST-ALSO-EAST-BLENDING
|
Panel I/O west and east blending dirty from dust blending
|
Clean up panel I/O west and east blending from dirt of dust blending with hand blower, also clean up panel FM and PF inside east blending ( ADI )
|
|
2024-05-14
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-2RC-11
|
Panel input-output dirty
|
Clean up panel I/O from dirty dust with hand blower ( ADI )
|
|
2024-05-13
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
D33-CX4
|
Ketika distart ada indikasi Fault FC
|
Cek LCS handle patah Cek Posisi LCS masih OFF ganti handle LCS On kan LCS Test Run OK
|
|
2024-05-13
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
443-CX5
|
Pressure outlet kompresor tidak naik
|
Cek arah putaran motor terbalik Balik putaran motor dengan menukar kabel fasa S dan T\ Test Run OK
|
|
2024-05-13
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
M33-LM1
|
Pembacaan sensor kadang kadang error
|
Cek sensor, clamp sling menyentuh dinding lubang sensor perbaikan clamp sling sensor high dan low Clean up sensor high dan low buat lubang baru untuk baud dudukan sensor adjust sensor di posisi tengah tengah lubang Test OK
|
|
2024-05-10
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
M33-LM1
|
Pembacaan sensor kadang kadang error
|
Install dudukan sensor Relokasi sensor Test OK
|
|
2024-05-08
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
D34-CP4
|
Counter running hour greasing motor aktif
|
Regreasing main motor
|
|
2024-05-08
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
D3A-CP8
|
Counter running hour greasing motor aktif
|
Regreasing main motor
|
|
2024-05-08
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
561-CX1
|
Counter running hour greasing motor aktif
|
Regreasing main motor
|
|
2024-05-08
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
D3A-PQ2
|
Counter running hour greasing motor aktif
|
Regreasing main motor
|
|
2024-05-08
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
581-CX1
|
Counter running hour greasing motor aktif
|
Regreasing main motor
|
|
2024-05-13
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-RF2
|
Connect motor
|
Connect motor RF and load cell at 483 PF1 ( PENY & YOGA )
|
|
2024-05-13
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FA1-AND-FA2
|
Connect sensor RTD and vibration
|
Connect new TU at panel I/O, install RTD and vibration sensor ( RIZAL & ANDRI )
|
|
2024-05-13
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-AC1,-AC2,-AC3
|
Check and repaire TLS
|
Repaire TLS for 493 AC1,AC2,AC3 ( PENY & YOGA )
|
|
2024-05-13
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-EH3
|
Connect power hoist
|
Prepare cable power of hoist, connect power of hoist ( AGUS & FIRMAN )
|
|
2024-05-13
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
RECONDITION-MOTOR
|
Recondition motor 5.5 KW 4P and 2.2 KW 2P
|
Take motor from ware house electric behind ER5 and from ware houses 1.1 KW 2P, bring to work shop electric ( EMSI & ADI )
|
|
2024-05-13
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-FV2
|
Continue connection cable
|
Connect cable for limit switch and solenoid valve at I/O panel also box termination ( RIZAL & EVE RIZKY )
|
|
2024-05-13
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
BURNER-FLOOR
|
Connect camera
|
Prepare cable for camera, connect cable at side. Test run camera result view ok ( PENY )
|
|
2024-05-13
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
Continue install rell hoist 463 MD1
|
Install rell hoist at 463 MD1 ( FIRMAN & CIVACON )
|
|
2024-05-13
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
Tidy up cable shell cooling and install blower motor
|
Install 2 each blower motor, prepare cable blower motor at work shop continue connect cable blower motor. Test run blower blower, replace contactor for run and emergency stop ( AGUS & YOGA & ADI & IMAN )
|
|
2024-05-08
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
444-CX6
|
Counter running hour greasing motor aktif
|
Regreasing main motor
|
|
2024-05-08
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
444-CX5
|
Counter running hour greasing motor aktif
|
Regreasing main motor
|
|
2024-05-08
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
444-CX4
|
Counter running hour greasing motor aktif
|
Regreasing main motor
|
|
2024-05-08
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
444-CX3
|
Counter running hour greasing motor aktif
|
Regreasing main motor
|
|
2024-05-08
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
444-CX1
|
Counter running hour greasing motor aktif
|
Regreasing main motor
|
|
2024-05-08
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
M33-LM1
|
Pembacaan sensor kadang kadang error
|
Preparing relokasi sensor install conduit dan pulling kabel
|
|
2024-05-08
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1-
|
Connect cable incoming welding to ER4 at cable tray
|
Connected cable welding incoming to ER4 near 463 KL1 ( AGUS & FIRMAN )
|
|
2024-05-08
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-LQ2
|
Install motor liquid
|
Test run motor spare result ampere high around 15 A. Take house motor after rebushing at work shop mechanic. Install motor test run with no load result ampere 2.4 - 2.6 A ( YOGA & PENY & ADI )
|
|
2024-05-08
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-FA1-M1
|
Test run motor, measure vibration and noise motor for free side and load side
|
Do test run motor with CBM teams, 1st result vibration and noise are still high upnormal, retightening coupling motor measure vibration and noise result normal when speed 2000 RPM ( PENY )
|
|
2024-05-08
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
SLIDE-GATE-CKD
|
Install box terminal cable, Limit Switch and Solenoid Valve
|
Install box terminal cable for power and indication, also limit switch and solenoid valve and cable tray and pipe cable from limit switch ( RIZAL & EVE RIZKY & ANDRI )
|
|
2024-05-07
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
443-CX5
|
Kabel MCC to LCS Overheat
|
Lanjutan Tightenning bold di LCS dan MCC On kan Breaker cek tegangan di LCS OK
|
|
2024-05-07
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
444-CX2
|
Motor Ground
|
Install motor setelah rekondisi dan rewinding Install dan tightenning kabel power di motor dan MC
|
|
2024-05-07
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-WS1
|
Install new LCS
|
Install for new LCS ( PENY & AGUS & YOGA )
|
|
2024-05-07
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
SLIDE-GATE-CKD
|
Install box termination and cable tray. Also install limit switch and solenoid valve
|
Prepare support for box termination and limit switch and solenoid valve. Install box termination at local and limit switch and solenoid valve. Painting support with yellow color ( RIZAL & ANDRI )
|
|
2024-05-07
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-EH3
|
relocation cable hoist to avoid hot materials from grate cooler
|
Install pipe for cable power hoist. Install cable hoist from motor to LCS. Test run hoist result ok ( FIRMAN & EVE RIZKY )
|
|
2024-05-07
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-LQ1
|
Check rubber coupling
|
Do check rubber coupling. Tightening nut for coupling distance more close than before ( AGUS )
|
|
2024-05-07
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-LQ2
|
Motor vibration and noise are not normal
|
Take motor from ware house. Test run at work shop result is not good, MC power supply trip and litle smoke come out from motor. try install hose new spare motor to original motor but does not match with nut. Original motor do rebushing at work shop mechanic ( PENY & ADI & YOGA )
|
|
2024-05-06
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
443-CX5
|
Kabel MCC to LCS Overheat
|
Doubling kabel existing dengan kabel Ex 443-CX1
|
|
2024-05-06
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
TRAFO-NAR1_2
|
WBI
|
WBI trafo MV OTR 2, 3, 301, 302, A, B
|
|
2024-05-03
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
SWITCHYARD
|
Drum Oli Trafo Ex Overhoul masih ada di switchyard
|
Housekeeping pindahkan drum oli ke gudang limbah B3 dan oli baru ke MSS
|
|
2024-05-06
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-FA1-M1
|
Continue replace bearing motor
|
Replace bearing 2 each. Install bask shaft motor and motor. test run motor, measure vibration and noise result vibration free and load side are ok. Noise for free side around 1.9 gE and load side 2.6 gE. Add grease for measure noise still high up 2 gE for free side and load side ( PENY & EVE RIZKY & YOGA & FIRMAN )
|
|
2024-05-06
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
SLIDE-GATE-CKD
|
Pulling cable 4 limit switch dan 2 solenoid valve
|
Take cable indication and power for limit switch and solenoid valve at ware house electric around green cable 35 meter and black cable 100 meter. Pulling cable from site slide gate CKD to panel i/O at 363 FN2. Prepare box termination cable at work shop ( RIZAL & ADI & ANDRI )
|
|
2024-05-02
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
443-CX2
|
Reaktifasi kompresor setelah kebakaran
|
Install panel kontrol kompresor Install display controller Install Emergency pushbutton
|
|
2024-05-02
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
GENSET-NAR2
|
Genset tidak bisa di start
|
Test run setelah recharging OK
|
|
2024-04-30
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
443-CX2
|
Reaktifasi kompresor setelah kebakaran
|
rewiring control kompresor simulasi dengan display kontroller
|
|
2024-04-30
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
GENSET-NAR2
|
Genset tidak bisa di start
|
Cek baterai, skun baterai kendor disisi kabel jumper ganti skun/clamp recharge baterai
|
|
2024-04-29
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
GENSET-NAR
|
WBI
|
WBI dan tes run genset nar 1, nar 2 dan packhouse nar 2 genset nar 2 kiln tidak bisa di start
|
|
2024-04-29
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
TRAFO-NAR1_2
|
WBI
|
WBI Trafo MV OTR 2, 3, 301, 302, A, B
|
|
2024-05-03
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-FA1-M1
|
Check bearing condition
|
Dismantle motor 483 FA1 M1, dismantle bearing motor and clean up around body motor from dust shaft motor from grease ( PENY & ADI & FIRMAN )
|
|
2024-05-03
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-BV1
|
Check indication compare from CCR and local
|
Replace card analog with new card. Test run from CCR, set 0 % actual already close but indication available, set 100 % actual open full but indication 70 % ( RIZAL & ANDRI )
|
|
2024-04-26
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
443-CX2
|
Reaktifasi kompresor setelah kebakaran
|
Install support panel Wiring kontrol panel kompresor
|
|
2024-04-26
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
6G1-CX1
|
Kompresor tidak bisa di start
|
Lanjutan Cek valve solenoid EX Kompresor valve jenis NO sedangkan valve gantinya jenis NC Modifikasi wiring dengan menambah relay dan coil solenoid lewat kontak NC relay Test Run OK Normal
|
|
2024-04-25
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
443-CX2
|
Reaktifasi kompresor setelah kebakaran
|
Pabrikasi support untuk panel kompresor pulling kabel LCS to MC
|
|
2024-04-25
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
6G1-CX1
|
Kompresor tidak bisa di start
|
- Install display kontroller di kompresor - Install trafo kontrol 380V-220V-24V - Cek wiring MC ada kesalahan wiring seharusnya kontak NC MC delta untuk terminal A2 MC Star dan kontak NC MC Star untuk terminal A2 MC Delta, Koreksi wiring - Test simulasi tanpa beban motor OK - Pasang kabel motor test run, kompresor run - Saat loading fuse kontrol putus - Cek kabel solenoid ada kabel yg lepas dari terminal soket dan short, perbaikan kabel dan ganti soket - Ganti solenoid+valve karena posisi coil diganjel baud - Cek indikasi pressure out kompresor tidak naik, Ganti sensor pressure Test run OK - Kompresor kadang kadang high temperatur, cek kabel RTD ada sambungan yang kadang kadang short, perbaikan kabel - Saat starting putaran motor berat....... lanjut
|
|
2024-04-24
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
443-CX2
|
Reaktifasi kompresor setelah kebakaran
|
Pull back kabel LCS to MC Buat 2 lubang di panel untuk exhaust fan dan sirkulasi udara
|
|
2024-04-24
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
6G1-CX1
|
Kompresor tidak bisa di start
|
Lanjutan Coba ganti Trafo Tes run kondisi MC masih tidak bisa ON Lepas display kontroller, simulasi di workshop test simulasi OK
|
|
2024-04-23
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
6G1-CX1
|
Motor tidak bisa start
|
cek tahanan gulungan motor dan tahanan isolasi OK cek fuse input dan output trafo putus, ganti fuse simulasi tanpa beban motor MC star dan mc delta abnormal (kadang energize kadang tidak) saat distart trafo kontrol berasap
|
|
2024-05-03
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CABLE-WELDING-INCOMING-TO-ER4
|
Connected cable incoming welding to ER4
|
Connected cable welding to ER4 ( AGUS & YOGA & FIRMAN)
|
|
2024-05-02
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
453-AGITATOR-M1
|
Replace bearing and install at local
|
Replace bearing 2 each for agitator, install motor at local ( PENY & ADI & ANDRI & GEMAN )
|
|
2024-05-23
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
CBM-BUILDING
|
Lampu Mati
|
Ganti Lampu TL LED 8 Ea
|
|
2024-05-23
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
EAST-HOUSING
|
Hub ethernet rusak dugaan petir
|
cek grounding panel hasil 10 ohm kabel grounding hanya sampai panel lama, tidak ada grounding rod
|
|
2024-04-23
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
TRAFO-NAR2
|
Cek Oli Trafo Rutin
|
Pengambilan sample oil trafo OTR-A dan OTR-B by quadro
|
|
2024-04-23
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
GENSET-NAR
|
WBI
|
WBI dan test run genset Nar 1 dan packhouse nar 2
|
|
2024-04-22
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
WORKSHOP-BUILDING
|
Lampu Mati
|
Ganti lampu TL ulir 2 Ea ruangan SI Electric
|
|
2024-04-22
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
CBM-BUILDING
|
Lampu Mati
|
Ganti lampu TL LED 2 Ea
|
|
2024-04-22
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
WORKSHOP-BUILDING
|
Tempat pemasangan kamera kurang pas
|
Relokasi kamera CCTV 1 Ea
|
|
2024-04-22
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
443-CX2
|
Reaktifasi kompresor setelah kebakaran
|
Install main motor kompresor Wiring panel kontrol
|
|
2024-04-22
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
TRAFO-NAR1_2
|
WBI
|
WBI Trafo MV OTR A, B, 2, 3, 301, 302
|
|
2024-04-19
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
WORKSHOP-BUILDING
|
Kamera CCTV belum terpasang
|
Install kamera CCTV 4 Ea dan MMC 2 Ea
|
|
2024-04-19
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
443-CX2
|
Reaktifasi kompresor setelah kebakaran
|
preparing kabel LCS to MC dan MC to motor
|
|
2024-04-19
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
EAST-HOUSING
|
Hub ethernet rusak dugaan petir
|
cek grounding komrel office 3 titik nilai resistance dibawah 5 ohm OK
|
|
2024-04-18
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
66B-CX3
|
Display Blank
|
Cek display kontroller Ex kompresor 66B-CX3 display blank karena ada komponen overheat di PCB mainboard
|
|
2024-04-18
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
D34-CPA
|
Sensor DP separator error
|
Service sensor DP separator Ex kompresor D34-CPA
|
|
2024-04-18
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
LIGHTING-JALAN
|
Lighting Jalan Raya Narogong Mati
|
Ganti lampu jalan 8 Ea resetting timer karena penunjukkan jam sudah bergeser test OK
|
|
2024-04-17
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-2
|
Indikasi di panel receiving fan trip
|
cek lokal fan radiator trafo trip 5 Ea dan noise 1 Ea disconnect kabel dan lepas motor 6 Ea bawa ke workshop
|
|
2024-04-17
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
MSS-BUILDING
|
Lighting Jalan Area MSS mati
|
Perapihan kabel tambal bekas bobokan beton
|
|
2024-04-30
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CABLE-INGOMING-WELDING-TO-ER4
|
Cable incoming welding to ER4 that is burned
|
Replace cable incoming welding that is burned to ER4 near 463 KL1 with spare cable ( AGUS & FIRMAN )
|
|
2024-04-30
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L93-RF1-AND-L93-SC5
|
Seal leakage at rotary feeder and motor abnormal at screw conveyor
|
Replace seal for L93 RF1 and replace bearing 6208 2Z 2 each for L93 SC5 ( PENY & HARYANTO & RAMA & ANDRI )
|
|
2024-04-30
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-TYRE-3
|
TPM prepare dash board, report FA, AM, and Safety
|
Prepare dash board for TPM 463 KL1 Trye 3, make report for FA, AM and Safety. Print out report and laminating. Install report at dash board ( YOGA & RIZAL & ADI & EVE RIZKY )
|
|
2024-04-29
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-FN1
|
Report for precomissioing drive
|
Clean up panel drive at ER4 and make report for precomissioing drive ( PENY )
|
|
2024-04-17
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
D3A-PQ4
|
trip breaker di MCC
|
Info shift motor cooling fan 1.1 OL disconnect kabel power cek ulang tahanan coil motor dan tahanan isolasi OK balance cek nilai induktance OK balance coba reconnect kabel test ampere 2,8A, setting eocr 2.75 naikkan setting eocr ke 3A test run OK
|
|
2024-04-17
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
561-CX1
|
Saat starting muncul indikasi open phase fault
|
Open phase muncul saat pindah ke MC delta cek timer star 15s rubah ke 10s cek parameter open phase 10s rubah ke 3s test OK
|
|
2024-04-16
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
MSS-BUILDING
|
Lampu jalan area MSS mati
|
Cek kabel kemungkinan ada yang putus pulling kabel baru dari Luar MSS building ke lampu jalan test OK
|
|
2024-04-29
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1
|
Prepare pulling cable for indication temperature motor
|
Pulling cable for indication temperature motor ( AGUS & EVE RIZKY )
|
|
2024-04-29
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
FIELD-NEW-INPUT-OUTPUT
|
Pulling profibus cable
|
Pulling profibus cable for new filed I/O ( RIZAL & ANDRI )
|
|
2024-04-29
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FA1-AND-FA2
|
Continue install cable vibration and RTD
|
Install cable for vibration and RTD ( RIZAL & ANDRI )
|
|
2024-04-29
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L93-SC4-
|
Continue service cable power
|
Move cable power from L93 RF3 to L93 SC4 also connected cable to L93 SC4. Test on result ok ( YOGA & AGUS & ADI & FIRMAN )
|
|
2024-04-29
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WARE-HOUSE
|
Check motor 463 MD1
|
Check motor 463 MD1 at ware house ( AGUS )
|
|
2024-04-29
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L93-SC4
|
pulling cable power
|
Pulling cable power, but we find spare cable at L93 RF3 ( YOGA & PENY & EVE RIZKY & FIRMAN )
|
|
2024-04-26
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FA1-AND-FA2
|
continue install sensor RTD and vibration
|
Install sensor RTD and vibration ( RIZAL & ANDRI )
|
|
2024-04-16
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
66B-CX3
|
Display Blank
|
Coba ganti LCD Test 4 jam (hanya ON display) masih buram cek temperatur display overheat ganti display spare 1 set test OK
|
|
2024-04-16
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
D34-CPA
|
Indikasi DP oil separator abnormal
|
Ganti sensor DP Separator Test OK
|
|
2024-04-15
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
BATTERY-CHARGER-MSS
|
Air aki low
|
Tambah Air aki
|
|
2024-04-15
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
HANDAK-BUILDING
|
Lighting mati
|
Ganti lampu 200 W 2 Ea
|
|
2024-04-15
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
TRAFO-NAR1_2
|
WBI
|
wbi trafo mv OTR 2, 3, 301, 302, A, B
|
|
2024-04-25
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L93-SC4
|
Cable grounded
|
Measure with meger at ER4 at LCS result cable bad condition. Cable to motor disconnect, run motor from CCR result motor is not available. Advise pulling cable from ER4 to LCS L93 SC4 ( YOGA & ADI & FIRMAN & EVE RIZKY )
|
|
2024-04-25
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER5-UPS-AND-HYDROLIC-PLC
|
Replace cable power PLC
|
Replace cable power PLC ( AGUS & PENY )
|
|
2024-04-25
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
INPUT-OUTPUT-493-AC1
|
Connecting new I/O
|
Connecting new I/O for 493 AC1 ( PENY & YOGA )
|
|
2024-04-25
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-LQ1,-LQ2,-LQ3
|
Continue install motor at local
|
Install motor at local also replace coupling motor. Adjust position coupling for all motor. Test run motor measure vibration and noise LQ1 Vertical: 0.9 mm/s o.64 gE- Horizontal: 0.0 mm/s 0.7 gE, LQ2 Vertical: 5.0 mm/s 1.9 gE Horizontal: 1.5 mm/s 1.4 gE, LQ3 Horizontal: 1.2 mm/s 0.75 gE,, Vertical: 1.0 mm/s 0.68 gE ( ADI & FIRMAN & EVE RIZKY )
|
|
2024-04-25
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FA1-AND-FA2
|
Continue install sensor RTD and vibration
|
Install sensor for RTD and vibration ( RIZAL & ANDRI )
|
|
2024-04-24
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FA1-AND-FA2
|
Prepare cable for RTD and Vibration
|
Prepare box for connection cable RTD and vibration. Install box at local 9 RIZAL & ANDRI )
|
|
2024-04-24
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM
|
continue install I/O
|
Install I/O for 363 RM1 ( PENY )
|
|
2024-04-24
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG
|
Replace MC incoming
|
Replace MC incoming ( AGUS & EVE RIZKY )
|
|
2024-04-24
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-LQ1-LQ2-LQ3
|
LQ3 discouple coupling or replace bearing motor vibration 4.4 m/s noise 1.6 gE, LQ2 discouple motor& test noise 2.3 gE, LQ1 discouple & test noise 3.6 gE
|
Discouple motor 463 LQ1-LQ2-LQ3, clean up body motor from dust also replace bearing motor. Install motor at work shop for 463 LQ1-LQ2-LQ3( YOGA & ADI & FIRMAN )
|
|
2024-04-23
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-LQ2-M1-TO-M2-AND-463-LQ1-TO-LQ3
|
check condition bearing motor
|
Check condition bearing motor for 363 LQ1-LQ2 vibration normal but noise already 1 ge. 463 LQ1 - LQ3 check vibration are abnormal and noise motor are abnormal ( AGUS )
|
|
2024-04-23
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-HC1-
|
Continue install sensor bearing
|
Reinstall sensor vibration, test run motor 473 EH1 from CCR, measure vibration from local and CCR. Differential 0.30 mm/s ( RIZAL & EVE RIZKY )
|
|
2024-04-23
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-EH3
|
Relocation power hoist
|
Relocation power for HOIST from hot material grate cooler ( FIRMAN & ANDRI )
|
|
2024-04-23
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
Relocation relay panel I/O
|
Relocation relay panel I/O 363 RM1. Install MCB and terminal distribution 3 each. Connecting cable ( PENY & ADI )
|
|
2024-04-22
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER6
|
Replace battery charging 12 VDC
|
Replace charging battery 12 VDC 2 each for number 7 & 8. Test on result ok. measure voltage good ( EMIS & ADI )
|
|
2024-04-22
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-PANEL-INPUT-OUTPUT
|
Move relay I/O
|
Move relay I/O 363 RM1 ( PENY & FIRMAN )
|
|
2024-04-22
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-HC1
|
pulling cable vibration sensor and make conduit way to vibration sensor
|
Clean up conduit from I/O panel to 473 Hc1, pulling cable vibration sensor from panel I/O to sensor vibration ( YOGA & ADI & EVE RIZKY & ANDRI & FIRMAN )
|
|
2024-04-19
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
453-PF1
|
continue install load cell
|
Install load cell 453 PF1 ( RIZAL & ANDRI )
|
|
2024-04-19
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM
|
continue check I/O
|
Check I/O for 363 RM ( PENY )
|
|
2024-04-19
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-EL1
|
Continue replace bearing motor door at north side
|
Replace bearing motor door for north side ( OENY & FIRMAN )
|
|
2024-04-19
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
FM-NR2
|
Continue calibration protection relay
|
Calibration protection relay ( AGUS & YOGA )
|
|
2024-04-19
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
KALENESIA
|
Check inspection electrical and welding tools
|
Inspection electrical and welding tools of PT KALENESIA at main gate ( ADI & IMAN )
|
|
2024-04-18
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
453-PF1
|
continue install convensator
|
Replace bearing for convensator 2 each. Install convensator at 453 PF1 ( RIZAL & ANDRI )
|
|
2024-04-18
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
FM-NR2
|
Calibration protection relay
|
Do calibration protection relay ( AGUS & IMAN )
|
|
2024-04-18
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-EL1
|
Repaire elevator
|
Check elevator found nut for inside door 1 nut is loos, install nut of inside door. Test functional from 8th to 1st floor. Result ok ( PENY & ADI & FIRMAN )
|
|
2024-04-05
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
PUMP-NAR2
|
WBI
|
WBI Pompa line Nar 2 Regreasing motor pompa
|
|
2024-04-05
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
KOMPRESOR-NAR2
|
WBI
|
WBI kompresor Line Nar 2 Regreasing main motor
|
|
2024-04-04
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
474-CX2
|
NFB Trip di MCC
|
Cek MC 170A rusak ganti MC 170A perbaikan kabel output MC main (kabel Motor getas) test OK
|
|
2024-04-03
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
GUDANG-HANDAK
|
Power di office gudang handak mati
|
Perbaikan kabel power (sambungan) test OK
|
|
2024-04-03
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
GUDANG-HANDAK
|
Lighting mati
|
Cek kabel ada yang kegaruk excavator di tiang no 4 perbaikan kabel tiang no 4
|
|
2024-04-02
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
WORKSHOP-BUILDING
|
Area electric workshop berantakan
|
Housekeeping area elektrik workshop
|
|
2024-04-02
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
GUDANG-APAR
|
Ruangan Gelap
|
Cek lampu banyak yang mati ganti lampu TL 2 Ea perlu tarik kabel baru, kabel netral ada yang putus
|
|
2024-04-01
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
WORKSHOP-BUILDING
|
Cross Check motor spare cooling fan trafo OTR-B
|
Clean up dan Cross Check motor spare cooling fan trafo OTR-B 5 Ea
|
|
2024-04-01
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
TRAFO-NAR1_2
|
WBI
|
WBI trafo MV OTR A, B, 2, 3, 301, 302 thermograf DS dan bushing trafo
|
|
2024-03-28
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
ER-7B
|
Ketersediaan Stop Kontak Kurang
|
Install Stop kontak 1 Ea pulling kabel connect to kabel power ke stop kontak test OK
|
|
2024-03-28
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
ER-7A
|
Selector On-OFF Fire supression belum ada
|
Install Selector Switch on-off Pulling kabel selector switch to panel FM200 Test OK
|
|
2024-03-28
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
ER-7B
|
Selector On-OFF Fire supression belum ada
|
Install selector On-Off pulling kabel selector switch to panel FM200 test OK
|
|
2024-03-28
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
ER-7B
|
Verifikasi kWHmeter
|
Verifikasi kWHmeter ER-7B
|
|
2024-03-27
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
444-CX4
|
Kompresor Trip Indikasi DP Air Filter
|
Cek indikasi sensor DP air filter OK Cek flexible rubber kempot Ganti flexible rubber (Ambil dari 444-CX2) (Info mekanik flexible rubber barang baru dan meterialny lebih tipis)
|
|
2024-03-26
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
LIGHTING-JALAN
|
Lighting Jalan Area MSS mati
|
Ganti Lampu jalan 4 Ea test OK
|
|
2024-03-26
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
444-CX4
|
Kompresor Trip Indikasi DP Air Filter
|
Ganti kabel + socket sensor pressure Ganti Sensor DP Air Filter Test OK
|
|
2024-03-25
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
ER-7B
|
Verifikasi kWHmeter
|
Verifikasi kWHmeter ER-7B
|
|
2024-03-25
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
TRAFO-NAR1_2
|
WBI
|
WBI Trafo OTR 2, 3, 301, 302, A, B
|
|
2024-03-25
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-2
|
Manuver Power
|
Manuver power OTR-2 Open all Outgoing Open Bustie OTR-2 Open Bustie MSS - ER-7B Close Incoming OTR-2 Close all outgoing
|
|
2024-03-22
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
ER-7B
|
Verifikasi kWHmeter
|
Verifikasi kWHmeter ER-7B
|
|
2024-03-22
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
LIGHTING-JALAN
|
Lampu Logo SBI mati
|
pasang sangkar untuk lampu tembak pasang lampu tembak 200W pulling kabel untuk lampu tembak connect kabel power test OK
|
|
2024-03-22
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
WAREHOUSE-BUILDING
|
Handpallet rusak
|
Perbaikan handpallet ganti all oil seal test OK
|
|
2024-04-09
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-BE1
|
Replace bright lamp that are of
|
Replace bright lamp that are off with new bright lamp 2 each at 363 BE1, test functional result ok ( ADI & ANDRI )
|
|
2024-04-09
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER-3
|
Continue install door siren and lamp emergency
|
Install siren and lamp emergency at ER 3, test functional result ok ( AGUS & FIRMAN )
|
|
2024-04-09
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-BC1
|
Replace bright lamp are off
|
Replace bright lamp 4 each with new bright lamp at 363 BC1, test functional ok lamp are on ( ADI & ANDRI )
|
|
2024-04-08
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-BC1
|
Replace bright lamp are off
|
Replace bright lamp off with new spare ( ADI & ANDRI )
|
|
2024-04-08
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-EH3
|
Relocation power
|
Relocation power for hoist at 473 Eh3 from hot material from under grate cooler ( AGUS & FIRMAN )
|
|
2024-04-08
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-BC7
|
Continue install bright lamp
|
Install bright lamp at L1C BC7 3 each. Do test functional of lamp result ok all bright are on ( ADI & ANDRI )
|
|
2024-04-05
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L33-BC1
|
Interlock BD is not connecting, cross check
|
Cross check interlock BD at L33 BC1, continue connected cable BD to interlock at systems ( RIZAL & GEMAN TRUBA )
|
|
2024-04-05
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-BF2-TOP-DUST-BIN
|
Replace regulator filter
|
Do replace for regulator filter ( RIZAL & GEMAN TRUBA )
|
|
2024-04-05
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-HS1
|
Continue install panel I/O
|
Install panel I/O for 363 HS1 ( PENY & FIRMAL-MUL CIVACON)
|
|
2024-04-05
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
433-BF2
|
test run equipment
|
Test functional for 433 BF2 ( PENY )
|
|
2024-04-05
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1&-473-EH3
|
tidy up all cable shell cooling fan put inside cable tray and cable power is burn also install scafolding
|
Supervision contractor install scafolding at 473 EH3 cut cable power that is burning from hot materials advise make another way of cable tray avoid hot material from great cooler ( AGUS & ADI )
|
|
2024-04-04
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER4-AND-ER5-CLEAN-UP-ER-AND-FILTER-DRIVE
|
Electric room and filter drive are not clean up yet
|
Clean up electric room and filter drive ( IMAN )
|
|
2024-04-04
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-WS1-CONTINUE-INSTALL-PANEL-AND-WIRING-
|
Panel is not install yet
|
Fabrication support panel hagger, do wiring. Install panel at local ( AGUS & CIVA )
|
|
2024-04-04
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
453-PF1-BRING-DOWN-COMPENSATOR
|
Compensator is not bring down yet
|
Bring down compensator 453 PF1 to work shop ( RIZAL & YOGA & ANDRI )
|
|
2024-04-04
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
433-DG1-CHECK-AND-TEST-RUN-SIGNAL-KTDR-TO-CCR
|
Signal KTDR from I/O panel to CCR is not check yet
|
Check and test run signal KTDR from panel I/o to CCR. Result ok ( PENY & ADI )
|
|
2024-04-04
2 years ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
433-BF2-&-433-FN2-PREPARE-INPUT-OUTPUT-AND-TEST-RUN
|
I/O are not ready yet
|
Connect cable power and control 433 BF2 and 433 FN2, do test run from panel I/O to CCR result ok ( PENY & ADI )
|
|
2024-04-03
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-WS1-PREPARE-INSTALL-HAGGER-BOX
|
Box hagger is not prepare yet
|
Prepare box hagger at work shop ( AGUS & FIRMAN )
|
|
2024-04-03
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-WS1-CONTINUE-SOLENOID-VALVE-ALSO-PREPARE-CABLE-POWER-AND--CABLE-CONTROL
|
S/V, cable power and control are not install and prepare yet
|
take cable at ware house bring to ER3 bottom, prepare LCS 2 each for 363 WS1 ( PENY & ADI )
|
|
2024-04-03
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-BC7-CONTINUE-INSTALL-LAMP
|
Lamp off are not install yet
|
Install bright lamp at L1C BC7 ( YOGA & ANDRI )
|
|
2024-04-02
2 years ago
|
NR.EL-01
|
emis supadma
|
493-AC2
|
breaker tdk bisa di reset
|
breaker 225A Hyundai , ganti dengan breaker 225A LS
|
|
2024-04-01
2 years ago
|
NR.SHIFT
|
emis supadma
|
L33-BC2-BELT-DRIVE-SOUTH-SIDE-MOTOR-IS-NOT-ACTIVE
|
BD south motor is not check yet
|
Activated BD south motor L33 BC2 ( RIZAL & ANDRI )
|
|
2024-04-02
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TR1-INSTALL-LAMP-ALL-BC-
|
Lamp off are not replace yet
|
Install lamp for all belt conveyor at L1C TR1 ( ANDRI )
|
|
2024-04-02
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER4-MCC-LOAD-FOR-ACB-AND-MCC
|
Area MCC of ACB & MCC are not check yet
|
Check MCC load for ACB and MCC at ER4 ( PENY )
|
|
2024-04-02
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-AND-443-2K1-PMR-SERVICE-ANALYZER
|
Flange probe, probe, filter probe, sample line, membran pump, filter balston, dryer gas dirt by dust process
|
Clean flange probe, probe, filter probe, sample line, membran pump. disposable filter, dryer gas from dust process ( RIZAL )
|
|
2024-04-02
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1-PMR-SERVICE-ANALYZER
|
Sample line, filter, flange probe full material of coal, also filter balston
|
Clean up flange probe, sample line, filter probe, membran pump also disposable filter from dust coal process. Clean dryer gas and check filter humidity sensor replace filter with spare filter ( AGUS )
|
|
2024-04-02
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1-&-L1C-TR1-&-L3C-RE1-WBI-ELECTRIC-AND-INSTRUMENTATION
|
Area motor, reclaimer and tripper dirty by dust coal process
|
Measure vibration-noise and temperature for free side and load side ( YOGA & ADI )
|
|
2024-04-01
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-WS1
|
install new s/v
|
Install solenoid valve 363 WS1 ( RIZAL & ANDRI )
|
|
2024-04-01
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L33-BC1-ACTIVATED-BD-IS-NOT-STANDARD-FOR-TRIP-IS-NOT-ACTIVE--AND-PULLING-CABLE
|
BD is activated yet
|
Activated BD and trip do setting normal also pulling cable ( PENY & YOGA )
|
|
2024-04-01
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-REPLACE-AND-INSTALL-BRIGHT-LAMP
|
Lamp is off not replace yet and mew instalation lamp is not resy yet
|
Replace bright lamp at east stair with spare bright lamp and install bright lamp at 463 KL1 ( AGUS & ADI & FIRMAN )
|
|
2024-04-01
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-EH1-&-EH4-MOVE-POWER-TO-EMERGENCY-BOX
|
Power hoist are not move yet at ER5
|
Move power hoist 493 EH1 to emergency box ( AGUS & ADI & FIRMAN )
|
|
2024-03-28
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3-MCC-LOAD-ACB-AND-THERMOGRAPHY-MCC
|
Thermography MCC and Load MCC ACB are not do at Electric Room
|
Do MCC load ACB and thermography MCC ( PENY )
|
|
2024-03-28
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-MD1-AUDIT-TPM
|
Audit TPM 463 MD1 is not do at site
|
Accompany judge for AUDIT TPM 463 MD1 ( PENY & RIZAL & YOGA )
|
|
2024-03-28
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-COMPLETING-DATA-TPM.-AM-AND-SAFETY-ALSO-DASH-BORAD
|
Data TPM for AM, Safety and Dash Board are complete yet
|
Complete data TPM 463 MD1 for AM-Safety also Dash Board ( YOGA & RIZAL )
|
|
2024-03-28
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FA7,-FA8,-FA9-INSTALL-MEMO-LUBE-OR-AUTO-GREASE
|
Auto grease or memo lube are not install yet at motor
|
Install memo lube or AUTO GREASE at 473 FA7-FA8-FA9 ( AGUS & FIRMAN & ANDRI )
|
|
2024-03-28
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1-PMR-SERVICE-ANALYZER
|
Filter probe, sample line, membran pump, balston filter, dryer gas dirt of coal
|
Clean up sample line, flange probe, filter probe, membran pump, disposable filter, dryer gas from dirt of coal process. Check filter humidity sensor, service sensor replace filter if found bad condition ( ADI & ANDRI )
|
|
2024-03-27
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-COMPLETING-DATA-TPM
|
Data TPM is not complete yet
|
Complete data TPM and save at computer ( RIZAL & YOGA )
|
|
2024-03-27
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-WBI-KILN,-COOLER,-CLINKER-SILO
|
Area kiln, cooler, clinker silo dirty from dust and coal process
|
Clean up area kiln, cooler, clinker silo from dust and coal process ( PENY )
|
|
2024-03-27
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-WBI-TOP-BLENDING,-PREHEATER,-CT-AND-KILN
|
Area top blending, PH, CT and kiln dirty from dust process
|
Clean up top blending, PH, CT and kiln from dirty dust process. Measure vibration-noise-temperature. Add grease 5 to 10 times ( AGUS & EVE RAGIL )
|
|
2024-03-27
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-MD1-TPM-HOUSE-KEEPING-AND-PAINTING
|
Area TPM dirty and fence,pipe,also need be repainting green and grey color
|
Clean up pipe cable also base plate motor, repainting pipe green color and support motor grey color ( ADI & EVE RIZKY & ANDRI )
|
|
2024-03-25
2 years ago
|
NR.SHIFT
|
emis supadma
|
463-2K1
|
Rell utk probe sdh rusak sehingga roller juga ikut cepat rusak
|
ganti rell dan roller ( Yurizal , firman , andri )
|
|
2024-03-23
2 years ago
|
NR.EL-01
|
emis supadma
|
393-CN1-CYCLONE-RM
|
lampu mati semua
|
ganti lampu OSRAM 5 pcs ( Firman & Andri )
|
|
2024-03-26
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-UTILITY-TRAINING-PLC
|
PLC is not training yet for employee
|
Do training PLC at work shop utility ( RIZAL & YOGA )
|
|
2024-03-26
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-AND-442-2K1-PMR-SERVICE-ANALYZER
|
Flange probe, probe, filter probe, sample line, membran pump, filter balston, dryer gas dirt by dust process
|
Clean up flange probe, probe, filter probe, sample line, membran pump, filter balston, dryer gas from dust process. Check filter humidity sensor replace with spare if found bad condition ( AGUS )
|
|
2024-03-26
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1-PMR-SERVICE-CEMS
|
Filter purge air unit for dust hunter and flowsic, swivel window dust hunter, transducer flowsic, CEMS room dirty from dust procecc
|
Clean up purge air unit dust hunter and flowsic, clean swivel windows transceiver/receiver and reflector dust hunter do alignment dust hunter, clean up transducer flowsic, clean filter cabinet MCS 100 E ( PENY )
|
|
2024-03-26
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-MD1-TPM-CLEAN-AND-PAINTING
|
Area TPM still dirty from dust process and fence also cover motor still need to be repainting
|
Clean up area TPM and repainting yellow and grey color for fence also cover motor also install sign motor and safety ( ADI & EVE RIZKY & FIRMAN & ANDRI )
|
|
2024-03-25
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-PMR-SERVICE-MOTOR
|
Area and filter motor are dirty from dust process
|
Clean up area and filter motor use instrument air suplly. Measure vibration-noise and temperature for free and load side, add grease for 15 to 30 times for free and load side ( PENY )
|
|
2024-03-25
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-PMR-SERVICE-MOTOR
|
Area and filter motor dirt from dust process
|
Clean up area and filter motor use instrument air supply, measure vibration-noise and temperature free and load side. Add grease from 15 times to 100 times for free side and load side ( AGUS )
|
|
2024-03-25
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-REPLACE-ROOLER-PROBE
|
Roller bad condition and rell probe are not replace yet
|
Replace roller with spare unit, also replace rell probe use spare one ( RIZAL & EVE RIZKY & FIRMAN & ANDRI )
|
|
2024-03-25
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-PMR-SERVICE-TEMPERATURE-TAD,-T-SCANNER,-CCTV,-CAMERA-BURNER
|
Area lens temperature TAD, T scanner, CCTV and camera burner ( pyrometer ) dirty from dust process
|
Clean up flange and lens temperature TAD, T scanner, CCTV, area room camera burner also control from dust process use instrument air supply and use equipment cleaning tools ( ADI & EVE RAGIL )
|
|
2024-03-18
2 years ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
ER3-INSTALL-LIMIT-SWITCH-AND-PULLING-CABLE
|
Limit switch and cable are not ready at ER3
|
Install limit switch and pulling cable ( RIZAL & ANDRI )
|
|
2024-03-18
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FA1-REPLACE-BEARING-MOTOR
|
Bearing bad condition is not replace yet
|
Replace bearing motor, install back motor at local. Test run result ok ( YOGA & EVE RIZKY & EVE RAGIL & FIRMAN )
|
|
2024-03-22
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-PMR-SERVICE-MEDIUM-VOLTAGE-MOTOR
|
Area motor dirty, filter motor, measure vibration, noise, temperature motor for free side and load side
|
Clean up area and filter motor. Replace auto grease for 363 MD1 at load side. Measure vibration-noise and temperature load and free side. add grease LS and FS 15 times to 100 times ( AGUS & ADI )
|
|
2024-03-22
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3-INSTALL-HORN-OF-DOOR
|
HORN of door at ER3 is not install yet
|
Install HORN for door,test functional resulr ok ( AGUS & ANDRI )
|
|
2024-03-22
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-CYCLONE-ALL-LAMP-OFF
|
Lamp is off still not replace yet
|
Replace lamp off at cyclone 363 RM1 ( PENY & FIRMAN )
|
|
2024-03-22
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-PMR-SERVICE-IR-TAD-TSCANNER-PYROMETER-CCTV
|
Flange probe, probe, sample line, filter probe,membran pump, dryer gas filter balston dirty
|
Clean up lens of TAD temperature sensor, lens CCT- Tscanner also pyrometer or camera burner ( YOGA )
|
|
2024-03-22
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1-PMR-SERVICE-ANALYZER-
|
Flange probe, sample line, filter probe,membran pump dirt of dust coal
|
Clean up flange probe, filter probe, sample line, diaphragma pump, disposable filter, dryer gas from dust coal process. Check and clean up filter humidity sensor replace with spare filter if found bad condition ( ADI & EVE RIZKY )
|
|
2024-03-22
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-&-463-MD1-GEMBA-TPM
|
Area TPM need to be clean and repainting for yellow color for fence and cover motor
|
Dismantle unuse ducting, put items at garbage tank. Clean up area conduit near inching motor kiln, repainting yellow color for fence near dash board TPM , also cover motor 463 MD1 and inching motor kiln ( PENY & AGUS & ADI & YOGA & EVE RIZKY & FIRMAN & ANDRI )
|
|
2024-03-21
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
474-CX1
|
Finger Contactor Rusak
|
Preparing penggantian MC Preparing kabel Power ke MC star dan delta Preparing kabel Jumper output MC delta ke star
|
|
2024-03-21
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
MSS-BUILDING
|
Verifikasi kWHmeter
|
Verifikasi kWHmeter MV-21, MV-23B, MV-24B, MV-25B, MV-26B, MV-27 Verifikasi ulang kWHmeter MV-16A, MV-24B dan MV-21
|
|
2024-03-20
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
474-CX1
|
Finger Contactor Rusak
|
Preparing penggantian MC Preparing kabel Power ke MC star dan delta Preparing kabel Jumper output MC delta ke star
|
|
2024-03-20
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
MSS-BUILDING
|
Verifikasi kWHmeter
|
Verifikasi kWHmeter MV-11, MV-13A, MV-14A, MV-15A, MV-16A, MV-17A, MV-22
|
|
2024-03-19
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
444-CX2
|
Indikasi overload motor
|
Bongkar mainmotor bawa ke workshop untuk di rewinding
|
|
2024-03-19
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
474-CX1
|
Indikasi di display Host Overload
|
Coba test run noload tanpa screw OK cek MC delta dan star fingerny sudah rusak preparing penggantian MC Buat lubang dudukan MC (diganti dengan LS, sebelumnya Schneider)
|
|
2024-03-21
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3-INSTALL-DOOR-HORN
|
Horn at ER3 is not install yet
|
Install HORN Door at ER3, test functional result ok ( AGUS & FIRMAN )
|
|
2024-03-21
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-CYCLONE--LAMP-ALL-OFF-AND-363-RM1-P3-DP-RM-INDICATION-HIGH
|
Lamp off are not replace yet and Indication DP RM are not check
|
Replace lamp off at Cyclone Raw Mill, and check DP service sample line and flange result DP local at CCR same ( PENY & EVE RIZKY-EVE RAGIL )
|
|
2024-03-21
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-CONTINUE-REPLACE-ROLLER-
|
Roller for probe is not replace yet
|
Replace roller probe at 463 2K1 because probe need to more center to get more gas for indication at analyzer ( RIZAL & YOGA & ANDRI )
|
|
2024-03-21
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-COMPLETE-DATA-CALIBRATION-OF-ANALYZER
|
Data for analyzer are not complete yet
|
Complete data PMR service analyzer, scan data PMR year 2023 and 2024 and save at computer ( EMIS & ADI )
|
|
2024-03-20
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-CYCLONE-4-REPAIRE-TUBING
|
Tubing bad condition is not repaire yet
|
Repaire tubing at 443 PH1 Cyclone 4 ( RIZAL & EVE RIZKY & ANDRI )
|
|
2024-03-20
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3-INSTALL-DOOR-HORN
|
Door horn is not install yet at ER3
|
Install Door Horn at ER3, test functional result ok ( RIZAL & EVE RIZKY & ANDRI )
|
|
2024-03-20
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-BL7-AND-BL9--REPLACE-AUTO-GREASE
|
Auto grease is not replace yet
|
Replace for AUTO GREASE with new spare, setting time test functional AUTO GREASE result ok ( AGUS & ANDRI )
|
|
2024-03-20
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-HC1-INSTALL-VIBRATION-SENSOR
|
Vibration sensor is not ready at site
|
Installing vibrations sensor for 473 HC1 ( PENY & FIRMAN )
|
|
2024-03-20
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-AND-43-2K1-PMR-SERVICE-ANALYZER
|
Flange probe, probe, filter probe, sample line, membran pump, filter balston, dryer gas dirt by dust process
|
Clean up flange probe, probe, filter probe, sample line, membran pump, filter disposable, dryer gas from dust process. Check filter humidity sensor replace with spare if found bad condition ( PENY & EVE RAGIL )
|
|
2024-03-20
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-SCAN-DATA-CALIBRATION-AND-SCHEDULE-CALIBRATION
|
Data calibration and schedule calibration are not ready for scanning
|
Scanning data calibration and schedule calibration year 2024 and save at file ( EMIS & ADI )
|
|
2024-03-18
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
474-CX1
|
Indikasi overload motor
|
cek kabel motor di ouput MC overheat semuanya perbaikan kabel yang overheat dan ganti scun cek screw (diputar dengan tangan) berat kemungkinan kabel overheat karena ampere motor tinggi dari screw yang berat
|
|
2024-03-18
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
444-CX2
|
Indikasi overload motor
|
Cek resistan isolasi (dari output MC) OK cek resistan coil motor putus 1 gulungan (dari output MC) cek terminal motor kabel arah coil terbakar
|
|
2024-03-18
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
444-CX1
|
Indikasi sensor temperatur elemen outlet fault
|
Cek kabel sensor putus cek sensor rusak ganti kabel dan sensor RTD PT1000 test run OK
|
|
2024-03-15
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
444-CX2
|
Indikasi sensor DP Separator Oil Fault
|
cek sensor basah oli clean up tubing sensor ganti sensor dengan spare rekondisi test run OK
|
|
2024-03-15
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
444-CX1
|
Trip Overload
|
Coba start cek ampere motor OK run normal
|
|
2024-03-15
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-302
|
Motor Fan Radiator Trafo Noise
|
Ganti motor 1 set dengan spare bongkar motor dan ganti bearing 2x 6203 2RS
|
|
2024-03-14
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-301
|
Motor Fan Radiator Trafo Noise
|
Ganti Fan 1 set dengan spare bongkar motor existing ganti bearing 2x 6203 2RS cek winding sudah rusak (getas) rewinding motor ke vendor
|
|
2024-03-14
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-2
|
Yearly Maintenance (OH)
|
Cek level oil main tank dan OLTC pakai selang function test PRD setelah penggantian dari ex OTR-A Masukkan DS Onkan OCB
|
|
2024-03-19
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1-P2-DRUFT-PRESSURE-OFTEN-HIGH-AROUND-25-MMH2O
|
Actual pressure at local are not check yet use portable sensor pressure
|
Do cross check actual pressure, clean up probe pressure found pressure increase from 19.1 to 25.6 so same at CCR reading ( YOGA & ADI )
|
|
2024-03-19
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-2K1-SERVICE-ANALYZER-COMPLAIN-CO-READING-FLUCTAUIC-OFTEN-HIGH
|
Flowmeter at low position, fllange-sample line, and filter probe are not service yet
|
Clean up sample line, flange probe, filter probe, filter disposable from dirt of coal process. Result after cleaning indication ball flowmeter increase result trusted at CCR ( YOGA & ADI )
|
|
2024-03-15
2 years ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
443-WI1-M3-REPLACE-BEARING-MOTOR
|
Bearing motor bad are not replace yet
|
Replace bearing motor with spare bearing. Install motor test functional motor result ok ( FIRMAN & ANDRI )
|
|
2024-03-15
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1,-GCT,-463-KL1,-423-EP1-WBI-ELECTRICAL-&-INSTRUMENTATION
|
Area electrical and Instrumentation are not clean up yet
|
Do clean up area electrical and instrumentation for 443 PH1, 423 EP1, GCT, and 463 KL1 ( YOGA )
|
|
2024-03-15
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
LA3-VA1-&-VA3-CALIBRATION-SENSOR-IDO
|
Sensor IDO are not calibrated yet
|
Calibrated sensor IDO LA3 VA1 and VA3 ( RIZAL & EVE RIZKY )
|
|
2024-03-15
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-GEMBA-TPM-5R
|
Area TPM are dirty are not clean up yet, unuse ducting still at location
|
Clean up area TPM use equipment tools, dismantle unuse ducting ( ALL CREW & FIRMAN & ANDRI & IMAN )
|
|
2024-03-19
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-BF1-INSTALL-OIL-FILTER
|
Filter oil is not install yet at location
|
Installing filter oil at 423 BF1 ( RIZAL & FIRMAN & ANDRI )
|
|
2024-03-19
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3-INSTALL-LIMIT-SWITCH-AND-PULLING-CABLE
|
Limit switch is not insall yet
|
Install limit switch and pulling cable at ER3. Test functional limit switch result ok ( RIZAL & FIRMAN & ANDRI )
|
|
2024-03-19
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-&-473-CC1-PMR-SERVICE-CRITICALMOTOR-AND-LSR
|
Area and filter motor dirt by dust
|
Clean up area and filter motor use instrument air supply. Measure vibration-noise for free side and load side, add grease free and load side 15 times to 30 times ( AGUS & EVE RIZKY )
|
|
2024-03-19
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1-PMR-SERVICE-CEMS
|
Filter purge air unit for dust hunter and flowsic, swivel window dust hunter, transducer flowsic, CEMS room dirty from dust procecc
|
Clean up motor and filter purge air unit of dust hunter also flowsic, swivel windows dust hunter, transducer flowsic from dust process. Do alignment dust hunter, clean up CEMS room use equipment cleaning tools. Clean up filter cabinet MCS 100E use instrument air supply ( YOGA & ADI )
|
|
2024-03-18
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3-INSTALL-LIMIT-SWITCH-AND-PULLING-CABLE
|
Limit switch and cable are not ready at ER3
|
Install limit switch and pulling cable and ER3. Test functional result ok ( RIZAL & ANDRI )
|
|
2024-03-18
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FAC-REPALCE-BEARING-MOTOR
|
Bearing motor bad are not replace yet
|
Replace bearing motor. Install back at location test run result ok ( YOGA & FIRMAN & EVE RIZKY-RAGIL )
|
|
2024-03-18
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-AND-L63-RM1-PMR-SERVICE-CRITICAL-MOTOR--AND-LSR
|
Area and filter motor dirty from dust process
|
Clean up area and filter motor. Measure vibration-noise and temperature free also load side. Add grease from 20 times and 100 times. Replace AUTO GREASE for load side at 363 MD1 with EASY LUBE setting auto grease every 2 hour ( AGUS & ADI )
|
|
2024-03-18
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-DISMANTLE-UNUSE-DUCTING
|
unuse ducting still at location
|
Dismantle unuse ducting ( FIRMAN & ANDRI )
|
|
2024-03-18
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
LA3-VA1-&-VA3-CALIBRATION-SENSOR-IDO
|
Sensor IDO are not calibrated yet
|
Calibration sensor IDO ( RIZAL & RIZKY )
|
|
2024-03-18
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
TPM-GEMBA-5R
|
Area GEMBA 5R are not clean up yet
|
Do clean up area GEMBA 5R ( ALL CREW )
|
|
2024-03-18
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1,-GCT,-EP,-463-KL1-WBI-ELECTRICAL-AND-INSTRUMENTASI-
|
Electrical / Instrumentation are not check yet
|
WBI area PH-GCT-EP-KILN for electrical and instrumentation ( YOGA )
|
|
2024-03-14
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
FLOWMETER-IDO-CALIBRATION
|
IDO flowmeter is not calibration yet
|
Calibration flowmeter IDO at preheater and burner floor. drop test IDO. Result ok ( RIZAL & YOGA )
|
|
2024-03-14
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1-R4-REPLACE-THERMOCOUPLE
|
Thermocouple is not replace yet
|
Replace thermocouple at L63 RM1 T4. Check indication at CCR for temperature result ok ( YOGA & ANDRI )
|
|
2024-03-14
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-EL1-PMR-SERVICE-ELEVATOR
|
Elevator is not service yet
|
PMR service at 433 EL1, clean up control VSD at 8th floor, also clean up every floor for safety sensor, Do test operation elevator every floor. Result ok ( PENY & EVE RIZKY )
|
|
2024-03-14
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
433-BE1-REPLACE-AUTO-GREASE
|
Auto grease is not replace yet
|
Replace AUTO GREASE for 433 BE1 ( AGUS )
|
|
2024-03-14
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-EB1-REPLACE-LAMP-AT-BOTTOM-BLENDIG
|
Lamp off is not replace
|
Replace lamp at bottom blending. Do test on result ok ( FIRMAN & ANDRI )
|
|
2024-03-14
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1-PMR-SERVICE-ANALYZER
|
Sample line, filter, flange probe full material of coal, also filter balston
|
Clean up filter probe, flange, sample line, membran pump, filter balston from dust coal use instrument air. Check filter humidity sensor result still ok ( ADI & EVE RAGIL )
|
|
2024-03-13
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-2
|
Sensor pressure relief maintank rusak
|
Cek sensor tidak bisa simulasi kontak Ganti box terminal dan limit switch dengan spare (ex OTR-A) Test OK
|
|
2024-03-13
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
444-CX1
|
Indikasi fault
|
Cek d display indikasi sensor dp separator error Cek dan flushing tubing ok Service sensor dp separator Test OK
|
|
2024-03-13
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-3B1-REPLACE-LAMP-OF-BOTTOM-BLENDING
|
Lamp off are not replace yet
|
Replace lamp at bottom blending, test on result ok ( ANDRI & FIRMAN )
|
|
2024-03-13
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-REPORT-EFFICIENCY-ENERGY
|
Report efficiency energy are not ready yet
|
Make report efficiency energy at work shop ( PENY )
|
|
2024-03-13
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-WF1-CHECK-LAMP-INSIDE-WEIGHT-FEEDER-IS-OFF
|
Lamp off is not replace yet
|
Replace lamp off at L63 WF1. Test on result ok ( PENY )
|
|
2024-03-13
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
BURNER-FLOOR-&-493-3B1-WBI-CRANE
|
Crane are not check yet for move up and down also move south-north or west-east
|
Do WBI for crane at burner floor and clinker silo. Test crane move up and down also move north-south or west-east ( EVE RIZKY )
|
|
2024-03-13
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-COMPLETE-DATA-CALIBRATION
|
Data calibration are not complete yet
|
Complete data calibration at work shop ( YOGA & RIZAL )
|
|
2024-03-13
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
433-BE1-CHECK-SPEED-SENSOR
|
Speed sensor is not check yet
|
Check speed sensor at 433 BE1. Result ok ( RIZAL & YOGA )
|
|
2024-03-13
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-2K1-&-443-2K1-PMR-SERVICE-ANALYZER
|
Probe, flange, filter probe, filter humidity sensor are not clean up yet from dirty dust process
|
Clean up probe, flange, filter probe, filter humidity sensor from dirty dust process. for 463 2K1 do adjust probe to be center at flange, cover end probe make to close and do zero calibration for CO zero before -.0.065 vol % zero after -0.012 vol % ( AGUS & ADI & EVE RAGIL )
|
|
2024-03-12
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-2
|
Yearly maintenance (OH)
|
Test function trafo Indikasi high level oil maintank bareng dengan suddent pressure maintank Cek wiring, sensor level dengan pressure di paralel untuk indikasi sedangkan untuk sensor pressure kabel untuk indikasi tidak di wiring Normalkan wiring untuk indikasi level di terminal X2.1 11 dan 12 no kabel 207, sedangkan untuk indikasi sudden press di terminal X2.2 11 dan 12 no kabel 218
|
|
2024-03-12
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
464-MD1
|
Pengukuran harmonik
|
Pengukuran harmonic trafo vsd maindrive kiln nar2 hasilny harmonic current 7%
|
|
2024-03-12
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
ALBANNA-BUILDING
|
Lampu mati
|
Ganti lampu 18 Ea
|
|
2024-03-08
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
ALBANNA-BUILDING
|
Lampu mati
|
Ganti lampu TL 5 Ea
|
|
2024-03-08
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-2
|
Yearly Maintenance (OH)
|
Function Test Protection Trafo
|
|
2024-03-12
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-MD1-CLEAN-AREA-MOTOR-AND-FILTER-MOTOR
|
Area and filter motor are not clean up yet
|
Do clean up area and filter motor. Check spark at carbon brush before and after clean up ( PENY & ADI )
|
|
2024-03-12
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1-7-443-PH1-WBI-CRANE
|
Crane are not test yet for move up and down also south-north or west-east
|
Do test carne move up and down also move north and south or west and east ( YOGA & ADI )
|
|
2024-03-12
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-AND-473-CC1-PMR-CRITICAL-MOTOR-&-LSR
|
Area motor and filter motor are not clean up yet
|
Do clean up area motor and filter motor. Measure vibration-noise-temperature for free side and load side. Add grease from 10 times to 15 times for free side and load side ( AGUS & FIRMAN )
|
|
2024-03-12
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1-PMR-SERVICE-CEMS
|
Filter PAU, swivel windows Dust Hunter, transducer Flowsic 100, filter cabinet MCS are dirt from dust process
|
Do clean up filter purge air unit dust hunter and flowsic 100, clean up swivel wndows transducer/reflector and reflector unit Dust Hunter, clean up transducer A & B of Flowsic 100, clean up filter cabinet MCS 100 E, clean up CEMS room ( YOGA & EVE RIZKY & ANDRI )
|
|
2024-03-12
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
FEED-BIN-WBI-ELECTRICAL-AND-INSTRUMENTATION-CHECK-INPUT-OUTPUT-PANEL
|
i/O panel area feed are dirty from dust process
|
Do clean up panel I/O area feed bin use hand blower ( PENY & ADI )
|
|
2024-03-12
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1-PMR-SERVICE-TEMPERARUE-TAD-&-T-SCANNER-&-CCCTV-AND-CAMERA-BURNER
|
Lens of temperature TAD-Tscanner-CCTV and camera burner are not clean up yet
|
Do clean up lens of temperature TAD, CCTV, T scanner, camera burner from dirt dust proses ( PENY & ADI )
|
|
2024-03-08
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-CV2
|
Often speed failure
|
Do modification support flange of probe speed sensor. Test run 363 CV2 result ok ( PENY & ADI & FIRMAN-WIKAN CIVACON )
|
|
2024-03-08
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-LD2
|
Can not close 0 %
|
Do check at local at CCR wheter direct close 0% is available. Result ok ( RIZAL & EVE RAGIL )
|
|
2024-03-08
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-EH5-CONNECT-TO-LCS-NEAR-483-BL7
|
Cable for power 473 EH5 is not connect yet
|
Do connect power cable 473 EH5 to LCS near 483 BL7 ( FIRMAN & WIKAN CIVACON )
|
|
2024-03-08
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
453-PF1-MONITOR
|
Problem 453 PF1 still exist
|
Do monitor 453 PF1, use load at local and change CF ( RIZAL & EVE RAGIL )
|
|
2024-03-08
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-CV1-&-363-CV2
|
Often speed failure
|
Do check at pre amplifier for 363 CV1 and 363 CV2 found cable are not tighten. Use lug cable for cable, tighten result ok ( PENY - ADI - EVE RIZKY )
|
|
2024-03-07
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
RIVERPUMP-BUILDING
|
Kabel Lan tarikan baru (utk PC dan telepon) masih berantakan
|
Rapihkan kabel (masukkan ke pit dan kabel tray) Test OK
|
|
2024-03-07
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
RIVERPUMP-BUILDING
|
Motor pompa domestik belum ada panel start stop
|
Install panel start stop motor pompa air domestik Pulling kabel dari panel welding ke panel start stop Rapihkan kabel arah motor (masukkan ke pit) dalam MCC Test OK
|
|
2024-03-07
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
RIVERPUMP-BUILDING
|
Area water intake pencahayaan kurang
|
Install lampu tembak 2 Ea test OK
|
|
2024-03-07
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
TENT-OH-LAMP-LIGHT-INSIDE
|
Lamp light inside tent OH are not dismantle yet
|
Do dismantle lamp light and power dispenser inside tent ( YOGA & ADI & ANDRI )
|
|
2024-03-07
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1,-363-SR1,-463-MD1,473-FA2,-483-BL9,-433-W1-M3,-473-FN1-FN3-FN6
|
Monitoring motor are not action yet
|
Do measure vibration-noise and temperature free and load side add grease from 10 times to 20 times ( YOGA & EVE RAGIL - EVE RIZKY )
|
|
2024-03-07
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-EH5-AND-493-EH1
|
Move power to new panel are not ready yet
|
Do move power to new panel for 473 EH5 and 493 EH1 ( AGUS & FIRMAN & RAGIL-RIZKY EVE )
|
|
2024-03-07
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
433-FA1,-5,5-KW-MOTOR-AND-45-KW-MOTOR-
|
Motor 433 FA1 is not move to ware house, motor 5,5 KW is not move to Mr. Dwiyan wh, motor 45 KW is not move from WS Electric Nr2 to WS Electric Nr1
|
Do move motor 433 FA1 to WH, also motor 5.5 KW move to Mr. Dwiyan work shop, and move motor 45 KW from WS Electric Nr2 to WS Electric Nr1 ( ADI & ANDRI )
|
|
2024-03-06
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
M3A-WP1
|
Kabel LCS ke Motor banyak yang lecet
|
Preparing kabel, scun, gland kabel dan fabrilkasi holder gland kabel cek motor ground (hasil megger 0,5 ohm)
|
|
2024-03-06
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-301
|
Cooling fan trafo Noise
|
Ganti Cooling fan dengan cooling fan spare 1 set test OK
|
|
2024-03-06
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-2
|
Yearly Maintenance (OH)
|
Supervisi PT Quadro
|
|
2024-03-04
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
363-MD1
|
N1OH 2024
|
Install, wiring, test new vibration sensor pinion axial & vertical
|
|
2024-03-04
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
473-FAA
|
N1OH 2024
|
Replace bearing temperature free side
|
|
2024-03-04
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
473-SC1
|
N1OH 2024
|
Setting ppm & delay motion detector
|
|
2024-03-04
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
473-HC1
|
N1OH 2024
|
Commisioning & test signal motion detector
|
|
2024-03-03
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
473-HC1
|
N1OH 2024
|
Modif & activation motion detector
|
|
2024-03-03
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
453-PF1
|
N1OH 2024
|
Recallibration PF & PreHopper Dynamic zerro also with blower
|
|
2024-03-03
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
483-PF1
|
N1OH 2024
|
Recallibration PF & PreHopper Dynamic zerro also with blower
|
|
2024-03-03
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
473-FA3-4-5-6-7-8-9-A
|
N1OH 2024
|
Cek & service all temperature sensor & vibrasion sensor
|
|
2024-03-03
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
BURNER-FLOOR-NAR1
|
N1OH 2024
|
Disconnect power cable PT Sinagawa from welding panel
|
|
2024-03-03
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
473-SC1-2-3-4-5
|
N1OH 2024
|
Commisioning all screw and test safety device
|
|
2024-03-03
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
483-BV2
|
N1OH 2024
|
Replave & modif SV from 24vdc to 110VAC, Change power in IO panel
|
|
2024-03-06
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
453-PF1-MONITOR
|
Monitor functional 453 PF1
|
Do monitoring functional of 453 PF1 ( RIZAL & EVE RIZKY )
|
|
2024-03-06
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-FX2-M2
|
Replace motor
|
Do replace motor for 463 FX2 M2 ( YOGA & FIRMAN & ANDRI )
|
|
2024-03-06
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1-AND-363-SR1
|
Temperature bearing over heat
|
Do measure vibration-noise-temperature for free and load side, add grease 10 times to 20 times ( AGUS & EVE RAGIL )
|
|
2024-03-06
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-MD1,-473-FA8,-483-BL9,-473-FN1-FN3-FN6
|
Do monitoring bearing motor
|
Do measure vibration-noise and temperature free side also load side, Add grease 5 times-7 times-10 times for free side and load side ( PENY & ADI )
|
|
2024-03-05
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-2
|
Yearly Maintenance (OH)
|
Supervisi PT Quadro
|
|
2024-03-05
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
M03-WT3
|
Yearly Maintenance (OH)
|
Install Motor di lokal after replacement bearing
|
|
2024-03-05
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
D3A-CP3
|
Indikasi Loading, aktual tidak Loading
|
Cek relay loading energize cek socket OK cek solenoid OK coba tukar tubing valve OK Piston bisa posisi nonjok
|
|
2024-03-05
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3-ER4--ER5-SETTING-MOTOR-DT
|
Motor much can not start because setting DT are abnormal
|
Setting DT motor at ER3-ER4 and ER5, test run result ok ( AGUS & ADI )
|
|
2024-03-05
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-INLET-KILN-GAS-ANALYZER
|
Reading O2 is abnormal
|
Do service analyzer such as clean up flange, filter probe. Also calibration O2 for zero and span ( RIZAL & ANDRI & RAFLI EVE )
|
|
2024-03-05
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1-CYCLONE-4-TEMPERATURE-SHOW-AND-453-PF1-AMPERE-HIGH-MOTOR
|
Temperature cyclone 4 material and gas are show abnormal, Ampere motor 453 PF1 is abnormal
|
Do cross check temperature at cyclone for material and gas make same reading at CCR. Also do recalibration 453 PF1 for zero and span ( RIZAL & YOGA & RAFLI EVE & ANDRI CIVACON )
|
|
2024-03-05
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-FN5-&-HGA-SYSTEM
|
393 FN5 is indication ampere also vibration high. HGA system is not start yet
|
Do check vibration and ampere at 393 FN5 and do tighten base plate result ampere and vibration are normal. Do start HGA system al location ( PENY & FIRMAN & RAGIL-FARHAN EVE )
|
|
2024-03-05
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3-363-SR1
|
Indication ready at CCR Operator is not appear
|
Do connect cable for indication ready, KW at ER3 bottom ( AGUS & ADI & FARHAN-RIZKY-RAGIL EVE )
|
|
2024-02-21
2 years ago
|
NR.N1-OH
|
Wahyu Adi Triono
|
MCC-ER3-ACB
|
Peremajaan ACB
|
Ganti ACB ER 3 atas 3 unit
|
|
2024-02-26
2 years ago
|
NR.N1-OH
|
Wahyu Adi Triono
|
ER3-SWITCH-GEAR
|
Peremajaan VCS to VCB
|
ganti VCS to VCB 3TR 301 , 2TR 301 , 363 SR1
|
|
2024-03-04
2 years ago
|
NR.N1-OH
|
Wahyu Adi Triono
|
L33-FN1
|
motor grouded
|
ganti mtr dgn 7,5KW / 4P ( WIG ) Check no load , 6A , 6,4A , 6,2A
|
|
2024-03-04
2 years ago
|
NR.N1-OH
|
Yoga Permana
|
433-PF1
|
OH-N1 2024
|
-kalibrasi 433-PF1 -393-FA7 repair fan nosie -393-3E1 West sensor level error, done -393-BF1 tubing leaking, done -393-PG9 done -463-KL1 install camera -463-2K1 ready dan kalibeasi -443-ZA3 error, done
|
|
2024-03-04
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
423-CX2
|
Indikasi Air Press Rendah (tidak sesuai aktual)
|
Saat di run sempet ada indikasi overload main motor Indikasi Air Press Rendah (tidak sesuai aktual) Coba ganti sensor transducer 4-20 mA 0-16 Bar, masih abnormal cek kabel OK coba ganti controller Test OK (indikasi air press sesuai aktual)
|
|
2024-03-04
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
474-CX2
|
indikasi temperature discharge high 130 derajat
|
cek sensor rtd OK, indikasi tidak jumping cek vsd run di 30 Hz terus coba inject vsd dengan kalibrator 4-20 mA OK cek 4-20 mA output controller pin 13 dan 21 tidak ada ganti controller Test OK
|
|
2024-03-04
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
D33-CX1
|
Indikasi overload motor
|
Coba turunkan setting press load (dari 7.0 bar ke 6.3 bar) unload (dari 7.5 bar ke 6.8 bar) test OK
|
|
2024-03-04
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER-5-TO-PLC-COOLER-PULLING-CABLE
|
Cable for PLC Cooler are not ready at site
|
Do pulling cable 2 rools from ER5 to PLC Cooler ( ADI & RAGIL-FARHAN EVE & ANDRI-OHA-DEDI-EKO-JOKO-RIDWAN-RIAN-SADDAM-MAHPUDIN-SYAHRI-ALDIAN-RAHMAT-RAMANDA-IQBAL CIVACON )
|
|
2024-03-02
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
443-CX4
|
Yearly Maintenance (OH)
|
Reconnect kabel main motor 160 kW test OK
|
|
2024-03-02
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
D33-CX5
|
Yearly Maintenance (OH)
|
- Buat Lubang dudukan MC (Main, Star dan delta) - Buat kabel jumper Output MC Delta dan Star - Ganti MC ke LS 3 Ea - Ganti Kabel motor cooling fan 5,5kW (kabel 4 mm) dan 1,1kW (kabel 1,5 mm) - Test Run OK
|
|
2024-03-02
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
ER-7A
|
Manuver Power
|
Normal Power OTR-301 - OFF Outgoing OTR-301 All - OFF Bustie 16, Rack Out ACB - OFF Bustie 17, Rack Out ACB - Rack In ACB Incoming OTR-301, ON ACB - ON Outgoing OTR-301 All
* Saat ON ACB Incoming OTR-301, OCB OTR-301 OFF * Relay 86 di panel incoming trip, Reset relay 86 * Hanya ada indikasi Alarm di Vamp, Reset * Turunkan OLTC ke posisi tap 3 * ON OCB OTR-301, tunggu tegangan sampai 6300V * ON ACB Incoming OTR-301
|
|
2024-03-02
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
ER-7B
|
Manuver Power
|
Manuver Power Outgoing OTR-2 ke MSS - OFF outgoing OTR-2 All - OFF Incoming OTR-2, Rack Out ACB - Rack In ACB Bustie OTR-2 ON Bustie OTR-2 - ON Outgoing OTR-2 All Manuver Power Outgoing OTR-3 dari MSS ke OTR-3 - OFF Outgoing OTR-3 All - OFF Bustie OTR-3, Rack Out ACB - Rack In ACB Incoming OTR-3, ON ACB - ON Outgoing OTR-3 All
|
|
2024-03-03
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-BV2,-473-HS1,473-CV1,473-CV2,473-CV3,-473-CV4,473-CV5
|
Install S/V BV2, check miltronic sensor are not ready yet
|
Do install S/V of 483 BV2 110 VAC also modification power supply, check settingan sensor miltronic for 473 CV1-CV5 and modification support flange probe 473 HS1 ( ADE & ADi & ALDI CIVACON )
|
|
2024-03-03
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
L63-WF1
|
OH nar1
|
Kalibrasi
|
|
2024-03-03
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
4D3-FM1
|
OH nar1
|
Kalibrasi
|
|
2024-03-03
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
4D3-AE2
|
OH nar1
|
Cek dan tes
|
|
2024-03-03
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
4D3-AE1-
|
OH nar1
|
Cek dan tes
|
|
2024-03-02
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
483-PF1
|
N1OH 2024
|
Cek & adjust loadcell, Baru hard callibration
|
|
2024-03-02
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
GUN-BURNER-NAR1
|
N1OH 2024
|
Install all pressure gauge, ada beberapa yg rusak, sudah di infokan
|
|
2024-03-02
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
483-BL9
|
N1OH 2024
|
Commisioning, cek signal temperature & vibration sensor Vibrqtion signal error, sudah diperbaiki
|
|
2024-03-02
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
483-BL7
|
N1OH 2024
|
Commisioning, cek signal temperature & vibration sensor
|
|
2024-03-02
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
483-FN1
|
N1OH 2024
|
Commisioning, cek signal temperature & vibration sensor
|
|
2024-03-02
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
483-BV2
|
N1OH 2024
|
Test open close belum mau open, ada masalah di solenoid valve
|
|
2024-03-02
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
483-BV1
|
N1OH 2024
|
Test open close sudah bagus,
|
|
2024-03-02
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
473-SC5
|
N1OH 2024
|
Perbaikan panel pre-amp Perbaikan connection & probe installation
|
|
2024-03-02
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
L63-FN1
|
N1OH 2024
|
Cek signal all temperature & vibration bearing fan
|
|
2024-03-02
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
473-SC4
|
N1OH 2024
|
Modif safety device, replace probe motion detector, test signal
|
|
2024-03-01
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
473-SC5
|
N1OH 2024
|
Prepare perbaikan box pre-amp & connection
|
|
2024-03-01
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
SCREW-MULTICYCLONE-COOLER-NAR1
|
N1OH 2024
|
Continue modif, adjust & test safety device 473-SC4 replace card miltronic
|
|
2024-03-01
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
L64-RM1
|
N1OH 2024
|
Install temperature roller R1 & R2
|
|
2024-03-02
2 years ago
|
NR.N1-OH
|
AGUS SUMIAJI SARBINI
|
363-MD1.M1
|
Motor Maintenance
|
# Blow out winding, rotor & termination box. # Measure rotor insulation. ( K-11,9....L-10,8....M-10,9 MOhm) # Measure carbon brush lenght. # Replace carbon brush ( 2 eah, RC73).
|
|
2024-03-02
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
423-BV5
|
OH N1
|
Ganti Proximity Open dan Close
|
|
2024-03-02
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
423-BV3
|
OH N1
|
Ganti Proximity Open
|
|
2024-03-02
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
423-SG6
|
OH N1
|
Ganti Proximity, clean up area SlideGate
|
|
2024-03-02
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
423-SG5
|
OH N1
|
Cek Proximity dan cleanup area SlideGate
|
|
2024-03-02
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
423-SG4
|
OH N1
|
Cek Proximity dan cleanup area SlideGate
|
|
2024-03-02
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
423-SG3
|
OH N1
|
Cek Proximity dan cleanup area SlideGate
|
|
2024-03-02
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
423-SG2
|
OH N1
|
Cek Proximity dan cleanup area SlideGate
|
|
2024-03-02
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
423-SG1
|
OH N1
|
Ganti Proximity, clean up area SlideGate
|
|
2024-03-02
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
423-BF1-PT07
|
OH N1
|
Ganti Presure Transduser
|
|
2024-03-02
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
423-BF1-PT06
|
OH N1
|
Ganti Presure Transduser
|
|
2024-03-02
2 years ago
|
NR.N1-OH
|
Yoga Permana
|
443-PH1
|
OH-N1 2024
|
-Perbaikan termocouple tertarik 443-ZA1 T2 -Ganti transmiter 443-ZA2 T2 -Pasang filter udara 433-PG1 -Calibrasi 443-FM1
|
|
2024-03-01
2 years ago
|
NR.EL-01
|
Yurizal Rachman
|
413-AE2-V1-16
|
Check dan service
|
Check dan service solenoid Check dan service actuator Check indikasi pada I/O
|
|
2024-03-01
2 years ago
|
NR.EL-01
|
Yurizal Rachman
|
413-PG-A-F
|
Check dan service
|
Check open close Adjust mekanikal stik Adjust indikasi
|
|
2024-03-01
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
423-BF1-T4
|
OH N1
|
Cek dan Tes
|
|
2024-03-01
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
423-BF1-T3
|
OH N1
|
Cek dan Tes
|
|
2024-03-01
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
423-BF1-T2
|
OH N1
|
Cek dan Tes
|
|
2024-03-01
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
423-BF1-T1
|
OH N1
|
Cek dan Tes
|
|
2024-02-29
2 years ago
|
NR.EL-01
|
Yurizal Rachman
|
413-AE1-V1-16
|
Check dan service
|
Check dan service actuator Check dan service solenoid Check indikasi di I/O
|
|
2024-02-29
2 years ago
|
NR.EL-01
|
Yurizal Rachman
|
413-PG5-8
|
Service damper
|
Check open close Adjust mekanikal stik Adjust indikasi
|
|
2024-03-01
2 years ago
|
NR.N1-OH
|
AGUS SUMIAJI SARBINI
|
403-3E1
|
4P3-1M3 MCC Maintenance
|
# Service Main Contactor (100%) # Test OCR/EOCR (100%) # 413-BL4.M1 Ganti MC & MCCB (100%) # 393-FA5A.M1 Rewiring (100%)
|
|
2024-03-01
2 years ago
|
NR.N1-OH
|
AGUS SUMIAJI SARBINI
|
403-3E1
|
4P3-1M4 MCC Maintenance
|
# Service Main Contactor (100%) # Test OCR/EOCR (100%)
|
|
2024-03-01
2 years ago
|
NR.N1-OH
|
AGUS SUMIAJI SARBINI
|
403-3E1
|
4P3-1M5 MCC Maintenance
|
# Service Main Contactor (100%) # Test OCR/EOCR (100%)
|
|
2024-03-01
2 years ago
|
NR.N1-OH
|
Yoga Permana
|
BLENDINGSILO-N1
|
OH-N1 2024
|
-kalibrasi 413-PGE,PGF,PGG,PG9 -kalibrasi 433-PG1 -Service air filter 433-PG1 -Replace gear 413-PG9
|
|
2024-03-01
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-301
|
Yearly Maintenance (OH)
|
Supervisi PT Megavolt - Test DIRANA, Tan Delta, PI - Connect kabel HV dan LV - Function Test
|
|
2024-03-01
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
443-CX4
|
Yearly Maintenance (OH)
|
Install motor
|
|
2024-03-01
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
D33-CX5
|
Yearly Maintenance (OH)
|
Install mainmotor, cooling fan 1.1kW dan 5.5kW
|
|
2024-03-01
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
423-BV-K
|
OH nar1
|
Cek dan tes
|
|
2024-03-01
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
423-BV-J
|
OH nar1
|
Cek dan tes
|
|
2024-03-01
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
423-BV-I
|
OH nar1
|
Cek dan tes
|
|
2024-03-01
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
423-BV-H
|
OH nar1
|
Cek dan tes
|
|
2024-03-01
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
423-BV-G
|
OH nar1
|
Cek dan tes
|
|
2024-03-01
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
423-BV-F
|
OH nar1
|
Cek dan tes
|
|
2024-03-01
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
423-BV-E
|
OH nar1
|
Cek dan tes
|
|
2024-03-01
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
423-BV-D
|
OH nar1
|
Cek dan tes
|
|
2024-03-01
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
423-BV-C
|
OH nar1
|
Cek dan tes
|
|
2024-03-01
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
423-BV-B
|
OH nar1
|
Cek dan tes
|
|
2024-03-01
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
423-BVA
|
OH nar1
|
Cek dan tes
|
|
2024-03-01
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
423-BV9
|
OH nar1
|
Cek dan tes
|
|
2024-03-01
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
423-BV8
|
OH nar1
|
Cek dan tes
|
|
2024-03-01
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
423-BV7
|
OH nar1
|
Cek dan tes
|
|
2024-03-01
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
423-BV6
|
OH nar1
|
Cek dan tes
|
|
2024-03-01
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
423-BV5
|
OH nar1
|
Cek dan tes
|
|
2024-03-01
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
423-BV4
|
OH nar1
|
Cek dan tes
|
|
2024-03-01
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
423-BV3
|
OH nar1
|
Cek dan tes
|
|
2024-03-01
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
423-BV2
|
OH nar1
|
Cek dan tes
|
|
2024-03-01
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
423-BF1-PT7
|
OH nar1
|
Ganti presure tranduser
|
|
2024-03-01
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
423-BF1-PT6
|
OH nar1
|
Ganti presure tranduser
|
|
2024-03-01
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-3S3-AND-393-3S4-CLEAN-UP-LCS-AND-MOTOR
|
LCS and motor are dirty by dust process and not clean up yet
|
Do clean up panel LCS for west blending and east blending 413 FN2-413 FX2-413 FA2-413 BF2 C1-413 FA4-413 BL6,BL7,BL8,BL9,BLC-433 FA5-4D3 FA1-433 PF1,PF2-483 SC4-413 FA1-413 BF1 C1-413 FX1-413 BE1 M1,M2-413 FN1,FN4-413 BF3 C1-433 SG4. Replace handle LCS also INS 40 A for 413 BL6 ( ADI & DIDIN )
|
|
2024-03-01
2 years ago
|
NR.N1-OH
|
AGUS SUMIAJI SARBINI
|
403-3E1
|
4P3-1M4 MCC Maintenance
|
# Service Main Contactor (100%) (by FM Crews) # Test OCR/EOCR (100%)
|
|
2024-03-01
2 years ago
|
NR.N1-OH
|
AGUS SUMIAJI SARBINI
|
403-3E1
|
4P3-1M5 MCC Maintenance
|
# Service Main Contactor (100%) (by FM Crews) # Test OCR/EOCR (100%)
|
|
2024-03-01
2 years ago
|
NR.N1-OH
|
AGUS SUMIAJI SARBINI
|
403-3E1
|
LP3-1M1 MCC Maintenance
|
# Service Main Contactor (100%) (by FM Crews) # Test OCR/EOCR (100%)
|
|
2024-02-29
2 years ago
|
NR.N1-OH
|
AGUS SUMIAJI SARBINI
|
403-3E1
|
LP3-1M2 MCC Maintenance
|
# Service Main Contactor (100%) (by FM Crews) # Test OCR/EOCR (100%) # 453-BL2.M1 Rewiring (100%)
|
|
2024-02-29
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
SCREW-MULTICYCLONE-COOLER-NAR1
|
N1OH 2024
|
Cek, repair, service & modification safety devices (motion detector & control) all screw conveyor multicyclone nar1
|
|
2024-02-29
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
LEVEL-UNDERGRATE
|
N1OH 2024
|
Cek level under grate diatas 473-FV4 (info sensor level masih trial dan belum di fungsikan)
|
|
2024-02-28
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
GUN-BURNER-NAR1
|
N1OH 2024
|
Service all pressure gauge (manometer) gun burner Nar1
|
|
2024-02-28
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
FAN-COOLER-NAR1
|
N1OH 2024
|
Install pressure transmitter & flushing line sampling 473-FA3,4,5,6,7,8,9,A
|
|
2024-02-28
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
BURNER-FLOOR-NAR1
|
N1OH 2024
|
Install & flushing line sampling all pressure transmitter area burner floor nar1
|
|
2024-02-29
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-301
|
Yearly Maintenance (OH)
|
Supervisi PT Megavolt - Ganti silica gel - cek kebocoran oli di bushing LV dan HV - Purifikasi Oli trafo - BDV test
|
|
2024-02-29
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-3
|
Yearly Maintenance (OH)
|
Supervisi PT Quadro - Function test
* ON GCB OTR-3 * Energize trafo OTR-3
|
|
2024-02-29
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
483-CX1
|
Yearly Maintenance (OH)
|
Service MC bold tighten all terminal clean up panel
|
|
2024-02-29
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
423-CX2
|
Yearly Maintenance (OH)
|
Service MC clean up panel
|
|
2024-02-29
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
423-CX1
|
bearing motor lifetime
|
Install main motor dan fan service MC mc delta KM2 rusak buat lubang dudukan untuk MC baru ganti MC delta KM2 (dari siemens 115A ke LS 130A clean up panel
|
|
2024-02-29
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
363-MW1
|
OH N1
|
Cek dan Service 363MW1
|
|
2024-02-29
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
2C1-2RC.11
|
KDT NR1
|
Replace CI Replace MTU
|
|
2024-02-29
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
333-BC2
|
OH N1
|
Cek dan Service Safety Device 333BC1
|
|
2024-02-29
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
333-BC1
|
OH N1
|
Cek dan Service Safety Device 333BC1
|
|
2024-02-28
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
CO2-SYSTEM
|
KDT NR1
|
Install pressure transmitter Test release CO Replace solenoid valve
|
|
2024-02-29
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
483-PF1
|
KDT NR1
|
Service and calibration Clean up and replace bearing counter weigh
|
|
2024-02-29
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
333-SX2
|
OH N1
|
Cek dan Service Safety Device 333SX2
|
|
2024-02-29
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
333-SX1
|
OH N1
|
Cek dan Service Safety Device 333SX1
|
|
2024-02-29
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
313-3B1-BIN-LIMESTONE
|
OH nar1
|
Kalibrasi
|
|
2024-02-29
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
323-3B2-BIN-SHALE
|
OH nar1
|
Kalibrasi
|
|
2024-02-29
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
323-3B3--BIN-SILIKA
|
OH nar1
|
Kalibrasi
|
|
2024-02-29
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
333-WF4
|
OH nar1
|
Kalibrasi
|
|
2024-02-29
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
333-WF3
|
OH nar1
|
Kalibrasi
|
|
2024-02-29
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
333-WF2
|
OH nar1
|
Kalibrasi
|
|
2024-02-29
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
333-WF1
|
OH nar1
|
Kalibrasi
|
|
2024-02-29
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CLEAN-UP-PANEL-INPUT-OUTPUT-AREA-443-PH1-AND-BLENDING
|
Panel I/O are not clean up yet
|
Do clean up panel I/O area pre heater and west blending also east blending, replace CI 4C1-2RA-31 from CI 830 to CI 801 ( ADI & DIDIN & EKO CIVACON )
|
|
2024-02-28
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
333-WF4
|
OH N1
|
Cek dan Service Safety Device 333WF4
|
|
2024-02-28
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
333-WF3
|
OH N1
|
Cek dan Service Safety Device 333WF3
|
|
2024-02-28
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
333-WF2
|
OH N1
|
Cek dan Service Safety Device 333WF2
|
|
2024-02-28
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
333-WF1
|
OH N1
|
Cek dan Service Safety Device 333WF1
|
|
2024-02-28
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
PDT2002
|
OH N1
|
Pasang Kembali Transmiter PDT2002
|
|
2024-02-28
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
PDT2001B
|
OH N1
|
Pasang Kembali Transmiter PDT2001B
|
|
2024-02-28
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
PDT2001A
|
OH N1
|
Pasang Kembali Transmiter PDT2001A
|
|
2024-02-28
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
324-BF1P2
|
OH N1
|
Pasang Kembali Transmiter 324 BF1 P2
|
|
2024-02-28
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
324-BF1P1
|
OH N1
|
Pasang Kembali Transmiter 324 BF1 P1
|
|
2024-02-28
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
363-RM1P1,363-RM1P3,363-RM1P4
|
OH N1
|
Pasang Kembali Transmiter 363 RM1 P1, 363 RM1 P3, 363 RM1 P4
|
|
2024-02-28
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-301
|
Yearly Maintenance (OH)
|
Supervisi PT Megavolt - repair baud bushing LV - ganti butterfly valve - filling oil - purifikasi main tank
|
|
2024-02-28
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-3
|
Yearly Maintenance (OH)
|
Supervisi PT Quadro - ganti valve radiator - ganti silica gel OLTC - ganti silika gel maintank - filling oil
|
|
2024-02-28
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
M03-WT3
|
Yearly Maintenance (OH)
|
Lepas motor bongkar motor clean up dan cat ulang motor ganti bearing
|
|
2024-02-28
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
M03-WT2
|
Yearly Maintenance (OH)
|
Install motor di lokal setelah rekondisi bearing
|
|
2024-02-28
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
D33-CX2
|
Yearly Maintenance (OH)
|
Service panel kontrol service MC cek terminal box motor
|
|
2024-02-28
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
D33-CX1
|
Yearly Maintenance (OH)
|
Pasang motor fan (setelah rekondisi bearing) Service panel kontrol service MC cek terminal box motor
|
|
2024-02-28
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
D33-CX4
|
Indikasi emergency stop
|
cek wiring cek resistance kontak K10 kontak jelek, ganti dengan relay 8 pin test
|
|
2024-02-28
2 years ago
|
NR.N1-OH
|
Yoga Permana
|
413-PG6
|
OH-N1 2024
|
-Kalibrasi 413-PG6, PG5, PG4, PG3. -Konek sensor reducer RAW MILL
|
|
2024-02-26
2 years ago
|
NR.EL-01
|
Yurizal Rachman
|
443-PH1
|
Relokasi Thermocouple
|
Instal new thermocouple Buat jalur piping cable Tarik kabel thermocouple
|
|
2024-02-27
2 years ago
|
NR.EL-01
|
Yurizal Rachman
|
443-Z4B-T2
|
Transmitter rusak
|
Instal new transmitter Buat support transmitter
|
|
2024-02-27
2 years ago
|
NR.EL-01
|
Yurizal Rachman
|
363-RM1
|
Support blackout
|
Support blackout Lepas jumperan acb
|
|
2024-02-28
2 years ago
|
NR.EL-01
|
Yurizal Rachman
|
443-PH1
|
Flexible dan tubing rusak
|
Repair flexible 443 Z3A T2 Replace selang tubing
|
|
2024-02-28
2 years ago
|
NR.EL-01
|
Yurizal Rachman
|
413-PG1-4
|
Check open close
|
Check open close Inject setpoint Check indikasi Repair mekanikal stuck
|
|
2024-02-28
2 years ago
|
NR.EL-01
|
Yurizal Rachman
|
363-RM1
|
Connect cable
|
Connect cable temperature dan vibrasi Instal new rtd thrust pad
|
|
2024-02-28
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
4D3-SG2
|
OH nar1
|
Ganti kinetrol dan limit switch
|
|
2024-02-28
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CLEAN-UP-LCS-AND-MOTOR-AREA-BURNER-FLOOR
|
LCS and motor area burner floor are still dirty by dust process
|
Do clean up LCS for 473 FN1-FN2-FN3-FN4-FN5-FN6 also replace handle door 2 each-handle LCS 3each and emergency bottom 4 each. Clean up LCS and motor for 473 EH1-473 EH5-483 LQ1-473 FAB-483 BL5-483 BL9-483 FA1-483 FA2-473 LD1 C1-483 LQ1 replace handle LCS 3 each for 483 BL7-483 BL9-483 LQ1. Install stick for handle LCS 473 EH5 ( ADI & DIDIN & FARHAN EVE & RAHMAT-EKO CIVACON )
|
|
2024-02-28
2 years ago
|
NR.N1-OH
|
AGUS SUMIAJI SARBINI
|
403-3E2
|
4P3-1MA MCC Maintenance
|
# Service Main Conntactor (100%) # Replace OCR with EOCR (100%) # Test OCR/EOCR (100%)
|
|
2024-02-28
2 years ago
|
NR.N1-OH
|
AGUS SUMIAJI SARBINI
|
403-3E2
|
4P3-1M9 MCC Maintenance
|
# Service Main Conntactor (100%) # Replace OCR with EOCR (100%) # Test OCR/EOCR (100%)
|
|
2024-02-28
2 years ago
|
NR.N1-OH
|
AGUS SUMIAJI SARBINI
|
403-3E2
|
4P3-1M8 MCC Maintenance
|
# Service Main Conntactor (100%) # Replace OCR with EOCR (100%) # Test OCR/EOCR (100%)
|
|
2024-02-28
2 years ago
|
NR.N1-OH
|
AGUS SUMIAJI SARBINI
|
403-3E2
|
4P3-1M7 MCC Maintenance
|
# Service Main Conntactor (100%) # Replace OCR with EOCR (100%) # Test OCR/EOCR (100%)
|
|
2024-02-28
2 years ago
|
NR.N1-OH
|
AGUS SUMIAJI SARBINI
|
403-3E2
|
4P3-1M6 MCC Maintenance
|
# Main Contactor Service (100%) # Replace OCR with EOCR (100%) # Test EOCR (100%)
|
|
2024-02-27
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
473-FA2.P1
|
N1OH 2024
|
Install pressure transmitter & clean up line sampling
|
|
2024-02-27
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
473-FA1.P1
|
N1OH 2024
|
Install pressure transmitter, clean up line sampling
|
|
2024-02-27
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
473-GQ1.T2,T3
|
N1OH 2024
|
Replace temperature undergrate cooler
|
|
2024-02-27
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
473-GQ1.P1,2,3,3B,4,5,6,7,8,9,A
|
N1OH 2024
|
Install & cek indication all pressure transmitter undergrate cooler
|
|
2024-02-27
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
M03-WT2
|
bearing motor lifetime
|
ganti bearing motor Rakit motor
|
|
2024-02-27
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-301
|
Yearly Maintenance (OH)
|
- Supervisi PT Megavolt * Ganti gasket bushing HV dan LV
|
|
2024-02-27
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-3
|
Yearly Maintenance (OH)
|
Supervisi PT Quadro - Ganti valve radiator 4 set
|
|
2024-02-27
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-302
|
Yearly Maintenance (OH)
|
- ukur kapasitor bank OTR-302 all (36Ea) - Kapasitor bank no 2 nilai kapasitansinya 1.5 nF (seharusnya 50.5uF) - Geser kapasitor no 1 ke no 2 - Fabrikasi dudukan untuk pengganti kapasitor - Ganti kapasitor ambil dari kapasitor OTR 301
|
|
2024-02-27
2 years ago
|
NR.EL-02
|
Hariyanto
|
483-BL9--473-FN1--473-FN3--473-HS4--993-FN2
|
pasang motor
|
Pasang motorsetelah di rekondisi
|
|
2024-02-27
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
4D3-BF1
|
OH N1
|
Cek dan Service 4D3BF1
|
|
2024-02-27
2 years ago
|
NR.SHIFT
|
Rizky Fauzy Ramadhan
|
393-BF1
|
OH N1
|
Cek dan Service 393BF1
|
|
2024-02-27
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
363-BC1
|
OH N1
|
Las Support LCS 363BC1
|
|
2024-02-27
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
363-BE1M2
|
OH N1
|
Las Support LCS 363BE1 M2 (LCS Inching)
|
|
2024-02-27
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
363-BF1
|
OH N1
|
Cek dan Service 363BF1
|
|
2024-02-27
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
L63-SR1.T1
|
KDT NR1
|
Replace cable sensor Replace temp transmitter Replace sensor RTD
|
|
2024-02-27
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
L93-BF1.C1
|
KDT NR1
|
Service solenoid purging Ganti box panel
|
|
2024-02-27
2 years ago
|
NR.N1-OH
|
Yoga Permana
|
443-PH1
|
OH-N1 2024
|
-Blackout Normalisasi replace VCB Er3 dan ACB Er3 -Install pressure transmiter
|
|
2024-02-27
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER5-CLEAN-UP-MCC-ALSO-REPLACE-TOR-TO-EOCR
|
TOR still applied at ER5
|
Do clean up MCC and replace TOR to EOCR for 493 FN4 and 493 AC2 ( ADI & DIDIN )
|
|
2024-02-27
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER-3-NORMALISATION-CABLE-JUMPERE-ACB-AND-VCB
|
Cable jumpered for ACB and VCB still connecting at ER 3
|
Do disconnected cable jumpered ACB and VCB at ER3 top and bottom ( EMIS-PENY-RIZAL-YOGA-ADI )
|
|
2024-02-27
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
4D3-PG1
|
OH nar1
|
Cek dan tes
|
|
2024-02-27
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
363-BE1
|
OH nar1
|
Ganti sensor level matrial ,las suport LCS inching
|
|
2024-02-27
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
443-CT1-V3
|
OH nar1
|
Cek dan tes
|
|
2024-02-27
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
443-CT1-VA2
|
OH nar1
|
Cek dan tes
|
|
2024-02-26
2 years ago
|
NR.EL-02
|
Hariyanto
|
493-FN2-473-FN3--473-FN1--473-HS4--443-W1M3
|
bawa motor ke lokasi br datang rekondisi
|
Bawa motor ke lokasi baru datang rekondisi
|
|
2024-02-26
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-301
|
Yearly Maintenance (OH)
|
- Supervisi PT Megavolt * Service OLTC * Purifikasi Oli * Top up oli baru OLTC * Service oil level indicator OLTC
|
|
2024-02-26
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
D33-CX4
|
Test run
|
Test run kompresor setelah rewinding main motor saat running normal kadang kadang muncul indikasi Emergency Stop, Ganti Push button emergency stop test
|
|
2024-02-26
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
M03-WT2
|
bearing motor lifetime
|
Lepas motor bongkar, clean up dan cat ulang motor
|
|
2024-02-26
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
D33-CX1
|
bearing motor lifetime
|
Lepas Motor Exh fan Kompresor Bongkar, clean up dan cat ulang motor Ganti bearing rakit motor
|
|
2024-02-25
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-3
|
Yearly Maintenance (OH)
|
- Supervisi PT Quadro * Bolt tightening OTR-3 * Turn Ratio Test * Insulation Test * Reconnect kabel HV dan LV
|
|
2024-02-25
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-301
|
Yearly Maintenance (OH)
|
- Supervisi PT Megavolt * Clean Up Trafo dan bushing HV dan LV * Preparing Gasket - Supervisi PT Quadro * Clean up bushing OCB
|
|
2024-02-25
2 years ago
|
NR.EL-01
|
Yurizal Rachman
|
443-PH1
|
Replace thermocouple
|
Replace thermocouple cyclone 1-4
|
|
2024-02-26
2 years ago
|
NR.EL-01
|
Yurizal Rachman
|
423-BF2
|
Sevice purging
|
Replace solenoid Check timer cycle Clean up box panel
|
|
2024-02-26
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
493-AC1.T1
|
KDT NR1
|
Service temperaturen clinker
|
|
2024-02-26
2 years ago
|
NR.EL-01
|
Yurizal Rachman
|
413-BF1
|
Service purging
|
Replace solenoid Check timer cycle Clean up box panel
|
|
2024-02-26
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
493-BF3
|
KDT NR1
|
Replace solenoid Valve Test cycle purging
|
|
2024-02-26
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
493-BF4
|
KDT NR1
|
Replace solenoid Valve Test cycle purging
|
|
2024-02-26
2 years ago
|
NR.EL-01
|
Yurizal Rachman
|
443-PH1
|
Instal new TE
|
Instal new relocation TE, Instal pipa conduit Instal pipa housing
|
|
2024-02-26
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
493-AC4.M1
|
KDT NR1
|
Check and simulation safety device Ganti sling pull cord
|
|
2024-02-26
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
443-CT1-VA1
|
OH nar1
|
Pasang dan set proporsional valve
|
|
2024-02-26
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
493-AC3.M1
|
KDT NR1
|
Check and simulation safety device
|
|
2024-02-26
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
494-AC2.M1
|
KDT NR1
|
Check and simulation safety device
|
|
2024-02-26
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ACCES-CONTROL-INSPECTION-ELECTRICAL-AND-WELDING-TOOLS-OF-CONTRACTOR
|
Tools for electrical and welding are already expired tagging
|
Do inspection check for electrical and welding tools of MENARA BUKIT LUBUKELI-JANTAN SETIA SAKTI-TRUBA JAGA CITA-MEGAVOLT PERKASA ( ADI & MARPAUNG - SUTRI TRUBA JAGA CITA )
|
|
2024-02-26
2 years ago
|
NR.N1-OH
|
Yoga Permana
|
443-PH1
|
OH-N1 2024
|
-install pressure transmiter PH
|
|
2024-02-24
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-301
|
Yearly Maintenance (OH)
|
- Ukur kapasitor bank (24Ea) - Supervisi PT Megavolt * Lepas kabel HV dan LV * Pengukuran karakteristik trafo before service
|
|
2024-02-24
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
ER-7B
|
Yearly Maintenance (OH)
|
- Load Outgoing OTR-2 All Open - Bustie OTR-2 Open, Rack Out ACB - OCB OTR-2 Close - Incoming OTR-2 Rack In ACB, Close ACB - Load Outgoing OTR-2 All Close
|
|
2024-02-24
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-2
|
Yearly Maintenance (OH)
|
Energize Trafo
|
|
2024-02-24
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
ER-7A
|
Yearly Maintenance (OH)
|
Manuver power from MSS to OTR-302 - Load Outgoing all Open - Bustie OTR 301/302 ER-7B Open - Bustie 16 dan 17 open - OCB OTR-302 Close - Incoming 302 Rack In ACB, Close ACB - Bustie 16 dan 17 Close - Load Outgoing All Close
|
|
2024-02-24
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-3
|
Yearly Maintenance (OH)
|
- Supervisi PT Quadro (Characteric Test Trafo After Service) * Dirana Test * Tan Delta * Winding Resistance * Dynamic Resistance * Leakage Test
|
|
2024-02-23
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-302
|
Yearly Maintenance (OH)
|
- Bolt tightening dan tambal cover trafo yang rembes - Bolt tightening kabel arrester 70 kV - Function Test protection trafo * Indikasi Bukholz 1 stage Alarm tidak ada di panel RCP, cek relay kerja, lampu indikasi mati * Indikasi OLTC Oil Low Level aktif terus, cek kabel OK, cek kontak level switch rusak, sementara di lepas kabelnya -Energize Trafo - Supervisi PT Megavolt * Insulation Test After service * Pasang kabel sisi HV dan LV * Function Test
|
|
2024-02-25
2 years ago
|
NR.EL-02
|
Hariyanto
|
393RF6--363FA2--363MD1--393RF4
|
rekondisi dan pasang motor
|
Bongkar dan pasang motor
|
|
2024-02-25
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
493-AC3
|
N1OH 2024
|
Reposisi box amplifier motion Clean up panel miltronic AC1, 2, 3 & 4
|
|
2024-02-25
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
493-AC2
|
N1OH 2024
|
Modif, wiring & test safety device (R5) Service motion sensor
|
|
2024-02-25
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
493-AC1
|
N1OH 2024
|
Service motion sensor
|
|
2024-02-25
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
483-AE1
|
N1OH 2024
|
Replace T-joint yang pecah
|
|
2024-02-25
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
COAL-MILL-AREA
|
N1OH 2024
|
Install all pressure transmitter after callibration
|
|
2024-02-25
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
493-BF4
|
N1OH 2024
|
Service solenoid purging
|
|
2024-02-25
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
493-BF2
|
N1OH 2024
|
Service solenoid purging
|
|
2024-02-25
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
SILO-BESI-NAR-1
|
N1OH 2024
|
Service level sensor
|
|
2024-02-25
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
493-AC1
|
N1OH 2024
|
Service sensor temperature clinker (cont) Replace air regulator (done)
|
|
2024-02-25
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
323-3B1
|
OH nar1
|
Cek dan tes matrial level
|
|
2024-02-25
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
323-3B4
|
OH nar1
|
Cek dan tes matrial level
|
|
2024-02-25
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
323-3B3
|
OH nar1
|
Cek dan tes matrial level
|
|
2024-02-25
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
323-3B2-
|
OH nar1
|
Ganti sensor matrial level
|
|
2024-02-24
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
493-AC2
|
N1OH 2024
|
Modif, wiring & test safety device (TLS R6)
|
|
2024-02-24
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
493-AC3
|
N1OH 2024
|
Modif, wiring & test safety device (TLS R5 dan R6)
|
|
2024-02-24
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
493-AC1
|
N1OH 2024
|
Modif, wiring & test safety device (TLS R4)
|
|
2024-02-24
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
ER3-N1
|
N1OH 2024
|
Clean up Trafo ER3 Nar1 Insulation test kabel input Insulation test trafo (sisi primer)
|
|
2024-02-24
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
473-LD7.M1
|
KDT NR1
|
Service and check open/close
|
|
2024-02-24
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
473-LD6.M1
|
KDT NR1
|
Service and check open/close
|
|
2024-02-24
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
473-LD5.M1
|
KDT NR1
|
Service and check open/close
|
|
2024-02-24
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
473L-LD4.M1
|
KDT NR1
|
Service and check open/close
|
|
2024-02-24
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
473-LD3.M1
|
KDT NR1
|
Service and check open/close
|
|
2024-02-24
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
473-LD2.M1
|
KDT NR1
|
Service and check open/close
|
|
2024-02-24
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
473-LD1.M1
|
KDT NR1
|
Service and check open/close
|
|
2024-02-23
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-3
|
Yearly maintenace (OH)
|
- Service DS-F 70 kV OTR-3 - Supervisi PT Quadro * Ganti Gasket Bushing Netral * Ganti baud OLTC dan tutup cover OLTC * Purifikasi * Cleaning isolator OCB 302 * Vacum Maintank * Pasang bukhols relay * Oil Filling
|
|
2024-02-24
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
473-CC1.T1
|
KDT NR1
|
Service and clean up temperature sensor clinker
|
|
2024-02-24
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
L63-BV3.M1
|
KDT NR1
|
Service and recondisi motor Test damper hanya mampu 50% - 80% Mekanikalnya berat
|
|
2024-02-24
2 years ago
|
NR.EL-02
|
Hariyanto
|
413FN2--L63LQ1--L63HS1--463FA2-393RF4
|
rekondisi motor
|
Bongkar motor untuk di rekondisi ke luar
|
|
2024-02-24
2 years ago
|
NR.N1-OH
|
Yoga Permana
|
PREHEATER-N1
|
OH-N1 2024
|
-replace termocouple area preheater n1 -service draft line preheater n1
|
|
2024-02-24
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
423-BF1L6-BF1SG6-BF1HE6
|
OH N1
|
Cek dan Service 423 BF1 L6, atas bawah, 423 BF1 SG6 atas bawah, BF1 HE6
|
|
2024-02-24
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
423-BF1L5-BF1SG5-BF1HE5
|
OH N1
|
Cek dan Service 423 BF1 L5, atas bawah, 423 BF1 SG5 atas bawah, BF1 HE5
|
|
2024-02-24
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
423-BF1L4-BF1SG4-BF1HE4
|
OH N1
|
Cek dan Service 423 BF1 L4, atas bawah, 423 BF1 SG4 atas bawah, BF1 HE4
|
|
2024-02-24
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
423-BF1L3-BF1SG3-BF1HE3
|
OH N1
|
Cek dan Service 423 BF1 L3, atas bawah, 423 BF1 SG3 atas bawah, BF1 HE3
|
|
2024-02-24
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
423-BF1L2-BF1SG2-BF1HE2
|
OH N1
|
Cek dan Service 423 BF1 L2, atas bawah, 423 BF1 SG2 atas bawah, BF1 HE2
|
|
2024-02-24
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
423-BF1L1-BF1SG1-BF1HE1
|
OH N1
|
Cek dan Service 423 BF1 L1, atas bawah, 423 BF1 SG1 atas bawah, BF1 HE1
|
|
2024-02-23
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
443-CT1
|
OH nar1
|
Ganti selenoid valve untuk tangki air
|
|
2024-02-23
2 years ago
|
NR.SHIFT
|
Yana Yuhana
|
423-BV1V1
|
OH nar1
|
Cek dan tes buka tutup ok
|
|
2024-02-23
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
363-LD2
|
OH nar1
|
Pasang motor dan tes buka tutup
|
|
2024-02-23
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
363-LD1
|
OH nar1
|
Pasang motor dan tes buka tutup
|
|
2024-02-23
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
L63-BV2.M1
|
KDT NR1
|
Replace motor beck actuator Signal test open close from CCR
|
|
2024-02-23
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
L63-BV1.M1
|
KDT NR1
|
Service and replace motor actuator Test open close from CCR
|
|
2024-02-23
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
493-AC1
|
N1OH 2024
|
Replace TLS (R1, R2, R3)
|
|
2024-02-23
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
473-GQ1.L1
|
N1OH 2024
|
Pulling cable dan konek (level sensor & io)
|
|
2024-02-23
2 years ago
|
NR.EL-02
|
Hariyanto
|
463FA2,-473FA1,-413BLC,-363FA2393FA6,7,-433FAA
|
rekondisi mltor
|
bongkar motor untuk di rekpndisi keluar
|
|
2024-02-23
2 years ago
|
NR.N1-OH
|
Yoga Permana
|
443-KL1
|
OH-N1 2024
|
-replace socket sesor bearing tire kilen dan isntall conduit cable -cek sensor tacho kiln
|
|
2024-02-23
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3-SERVICE-MCC-AND-REPLACE-TOR-TO-EOCR
|
TOR are not replace yet to EOCR at MCC ER3
|
Do service MCC at ER3 top floor, and replace TOR to EOCR for 363 BE1 M1-363 HS1 M1 7 M2- 363 HS2 M1, 363 FA1 ( ADI & AGUS & DIDIN )
|
|
2024-02-23
2 years ago
|
NR.EL-01
|
Yurizal Rachman
|
463-KL1
|
Check dan repair
|
Check dan repair sensor vibrasi pinion gear Repair pipa conduit
|
|
2024-02-22
2 years ago
|
NR.EL-01
|
Yurizal Rachman
|
463-KL1
|
Check and repair
|
Check dan repair sensor temperature tire kiln
|
|
2024-02-23
2 years ago
|
NR.N1-OH
|
AGUS SUMIAJI SARBINI
|
303-3E2
|
3P3-1M2 MCC Maintenance
|
# Service Main Conntactor (100%) # Replace OCR with EOCR (100%) # Test OCR/EOCR (100%)
|
|
2024-02-23
2 years ago
|
NR.N1-OH
|
AGUS SUMIAJI SARBINI
|
303-3E2
|
MCC MAINTENANCE
|
3P3-1M4 MCC Maintenance # Service Main Contactor (100%) # Test OCR/EOCR (100%)
|
|
2024-02-22
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
TRAFO-ER4-N1
|
Manuver power
|
Clean up trafo Test insulation kabel input Test insulation input trafo Normalkan power area ER4 N1
|
|
2024-02-21
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
COOLER-&-BURNER-FLOOR
|
N1OH 2024
|
Service pressure transmitter under grate Service pressure transmitter area burner floor
|
|
2024-02-22
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
494-AC1
|
N1OH 2024
|
Check function rope switch Prepare ganti switch 4pcs
|
|
2024-02-22
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
473-GQ1.L1
|
N1OH 2024
|
Check & service level sensor, prepare tarik kabel baru, kabel lama kena kebakaran
|
|
2024-02-22
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
483-BV2
|
N1OH 2024
|
Test functuon BV, kondisi mekanikal berat
|
|
2024-02-22
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
483-BV1
|
N1OH 2024
|
Test function BV, kondisi mekanikal berat
|
|
2024-02-22
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
474-CN1.T1
|
N1OH 2024
|
Replace Thermocouple Replace Flexible Conduit
|
|
2024-02-22
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-301
|
OCB tidak bisa ON
|
Cek indikasi di RCP masih ada fault coba reset di panel RCP coba posisi lokal tidak bisa coba posisi remote OK
|
|
2024-02-22
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-302
|
OCB tidak bisa ON
|
Cek indikasi di RCP masih ada fault reset di relay bukholz coba reset di panel RCP masih blm hilang faultnya coba reset power MCB kontrol 110 Vdc indikasi fault hilang coba posisi lokal tidak bisa coba posisi remote OK
|
|
2024-02-22
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-3
|
GCB tidak bisa ON
|
- Cek tegangan kontrol dan motor spring charger 0 V - Posisi trafo CPT OTR-2 dan OTR-3 OFF - Inject tegangan 220 V dari receptacle ER-7B ke panel ATS CPT OTR-2 / OTR-3 ke output MCCB untuk kontrol GCB - Test OK
|
|
2024-02-22
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-3
|
Yearly Maintenance (OH)
|
Supervisi PT Quadro - Pengukuran keserempakan dan resistance contact GCB - Ganti O ring dan gasket Bushing HV
|
|
2024-02-22
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-302
|
Yearly Maintenance (OH)
|
Supervisi PT Megavolt - Pengukuran karakteristik Trafo
Supervisi PT Quadro - Pengukuran keserempakan dan resistance contact OCB
|
|
2024-02-22
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
MCC-COOLING-TOWER-NAR1
|
Yearly Maintenance (OH)
|
Clean up trafo MV (6,3 kV) to LV (400 V) - Ukur tahanan isolasi sisi HV to ground RST to ground = 12,8 Gohm ; 14,6 Gohm ; 15,1 Gohm (inject 5000 V) - Ukur tahanan isolasi sisi LV to ground = 520 Mohm (inject 500 V) - Ukur tahanan isolasi sisi HV terhadap sisi LV = 63,3 Gohm (inject 2500 V)
|
|
2024-02-22
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
ER-7B
|
Yearly Maintenance (OH)
|
Power PLN 70 kV ke Nar1 OFF Manuver Power dari trafo OTR-2 ke MSS Aux Mill 1, 2, dan main office open Incoming OTR-2 Open Bustie OTR-2 Close Aux Mill 1, 2, dan main office close
|
|
2024-02-22
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
ER-7A
|
Yearly Maintenance (OH)
|
Power PLN 70 kV ke Nar1 OFF Manuver Power dari trafo OTR-301 ke MSS ER-3, ER-4, ER-5, ER-6, ER-8, Cooling Tower Open Incoming OTR-301 Open Bustie 16 dan 17 ER-7A Open Bustie 301-302 ER-7B Close Bustie 16 dan 17 ER-7A Close ER-3, ER-4, ER-5, ER-6, ER-8, Cooling Tower Close
|
|
2024-02-22
2 years ago
|
NR.EL-02
|
Hariyanto
|
393FA1,FA2,FA3,-433FA1,FA2,FA3,RF1-413FA1,FA22
|
bongkar motor untuk di rekondisi
|
Bongkar motor untuk di rekondisi ke luar
|
|
2024-02-22
2 years ago
|
NR.N1-OH
|
Yoga Permana
|
433-BE1,-ER4
|
OH-N1 2024
|
-Replace speed sensor 433-BE1 dan repair clamping beltdrift -Insulation testing all trafo TR ER4
|
|
2024-02-22
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ACCES-CONTROL-INSPECTION-ELECTRICAL-AND-WELDING-TOOLS-OF-CONTRACTOR
|
Tools for electrical and welding are already expired tagging
|
Do inspection electrical and welding tools of contractor INDOPORLEN-KALOPER-MAGNA INDONESIA-MENARA BUKIT LUBUKELI ( ADI & MARPAUNG TRUBA JAGA CITA )
|
|
2024-02-22
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
ER4-NR1
|
KDT NR1
|
Service and clean up trafo Meger kabel incoming
|
|
2024-02-23
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
L3A.BC1.ML1
|
KDT NR1
|
Replace baling2 sensor
|
|
2024-02-23
2 years ago
|
NR.SHIFT
|
Titok Pangesti Aji
|
L3A-BC1.M1
|
KDT NR1
|
Simulation and test safety device
|
|
2024-02-23
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
L3A-BC2.M1
|
KDT NR1
|
Simulation and test safety device replace ropeswitch
|
|
2024-02-22
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
L33-BC1.M1
|
KDT NR1
|
Simulation and test safety device
|
|
2024-02-22
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
L33-BC2.M1
|
KDT NR1
|
Simulation and test safety device
|
|
2024-02-22
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
L33-3B1.W1
|
KDT NR1
|
Clean up sensor
|
|
2024-02-22
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
L33-3B1.L1
|
KDT NR1
|
Service and test simulation
|
|
2024-02-22
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
L33-BF1
|
KDT NR1
|
Service and test purging
|
|
2024-02-22
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
L63-RM1.P1
|
KDT
|
Replace tubing sample
|
|
2024-02-21
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-302
|
Yearly Maintenance (OH)
|
+ Clean up Capasitor bank
Supervisi PT Megavolt - Overhoul OLTC - Ganti O ring valve radiator
|
|
2024-02-21
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-3
|
Yearly Maintenance (OH)
|
Supervisi PT Quadro - Ganti drain dan filling valve maintank - Ganti drain dan filling valve OLTC - Ganti drain valve conservator OLTC dan Maintank - Ganti gasket manhole consevator - Ganti gasket oil level maintank - Cleaning HV bushing - Overhoul OLTC
|
|
2024-02-21
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
D3A-CP3
|
Display Mati
|
Cek Fuse 2A untuk kontrol putus Coba ganti fuse Lepas output main motor dan cooling fan Test saat setelah MC delta energize mau ke posisi loading Fuse putus Ganti fuse dengan MCB 2A Lepas solenoid untuk loading unloading Test Simulasi OK Pasang kabel main motor dan cooling fan Ganti Solenoid Load Unload Test OK
|
|
2024-02-21
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
D33-CX3
|
bearing motor lifetime
|
Lepas motor Exh fan Ganti Bearing Pasang Motor Test Putaran OK
|
|
2024-02-21
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
D33-CX2
|
bearing motor lifetime
|
Pasang motor exh fan (after replacement bearing)
|
|
2024-02-20
2 years ago
|
NR.N1-OH
|
Radifan Almas Sudaryadi
|
4C2-2RC.11
|
Overhaul(Yearly Maintenance)
|
Clean up dan rapihkan kabel
|
|
2024-02-20
2 years ago
|
NR.SHIFT
|
Radifan Almas Sudaryadi
|
4C2-2RC.23
|
Overhaul(Yearly Maintenance)
|
Clean up dan rapihkan kabel
|
|
2024-02-20
2 years ago
|
NR.N1-OH
|
Radifan Almas Sudaryadi
|
4C2-2RC.22
|
Overhaul(Yearly Maintenance)
|
Clean Up panel dan rapihkan kabel
|
|
2024-02-22
2 years ago
|
NR.N1-OH
|
AGUS SUMIAJI SARBINI
|
303-3E2
|
MCC MAINTENANCE
|
3P3-1M3 MCC Maintenance # Service Main Contactor (100%) # Replace OCR with EOCR (100%) # Test OCR/EOCR (100%)
|
|
2024-02-22
2 years ago
|
NR.N1-OH
|
AGUS SUMIAJI SARBINI
|
303-3E2
|
MCC MAINTENANCE
|
4P3-1M1 MCC Maintenance # Service Main Contactor (100%) # Test OCR/EOCR (100%) # Replace OCR with EOCR (100%)
|
|
2024-02-21
2 years ago
|
NR.N1-OH
|
Yoga Permana
|
433-BE1,-443-RF1,-443-RF2,-433-BF1
|
Service, test
|
-Test proteksi 433-BE1 -Test sensor speed 443-RF1, 443-RF2 -Test 433-BF1
|
|
2024-02-21
2 years ago
|
NR.EL-02
|
Rizky Fauzy Ramadhan
|
474-EP1
|
F2B1, sering trip
|
Ganti modul card trafo (mA,kV)
|
|
2024-02-21
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
363-LD1,363-LD2
|
OH N1
|
Ganti bearing motor (LS,FS)
|
|
2024-02-20
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-3
|
Yearly Maintenance (OH)
|
Supervisi PT Quadro - Bongkar panel radiator - Bongkar dan repair ganti o ring NBR upper bottom valve radiator - Ganti gasket radiator 20 pcs - ganti gaslet blind flange pipa junction panel radiator - ganti gasket manhole 4 set - ganti gasket LV bushing 4 set - ganti gasket bushing stabilizing/tertier 2 set
|
|
2024-02-20
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-302
|
Yearly Maintenance (OH)
|
Supervisi PT Megavolt - Purifying - Clean up trafo
|
|
2024-02-20
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
D33-CX2
|
bearing motor lifetime
|
Bongkar motor exh fan ganti bearing (6002zz dan 6002zz)
|
|
2024-02-20
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
443-CX4
|
bearing motor lifetime
|
Bongkar main motor bawa ke workshop
|
|
2024-02-20
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
423-CX1
|
bearing motor lifetime
|
bongkar motor fan 4 kw pasang motor fan ex 423-CX2 (sudah ganti bearing baru) cek putaran OK
|
|
2024-02-21
2 years ago
|
NR.N1-OH
|
Yoga Permana
|
BURNER-NAR1
|
N1OH 2024
|
Service pressure transmitter dan temperature sensor area burner floor
|
|
2024-02-21
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
L63-2K3
|
KDT NR1
|
Service and calibration
|
|
2024-02-21
2 years ago
|
NR.N1-OH
|
Yoga Permana
|
COOLER-NAR1
|
N1OH 2024
|
Melanjutkan service pressure transmitter area fan cooler dan under grate
|
|
2024-02-21
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
L63-2K2
|
KDT NR1
|
Service and calibration
|
|
2024-02-21
2 years ago
|
NR.EL-01
|
Titok Pangesti Aji
|
L63-2K1
|
KDT NR1
|
Service and calibration
|
|
2024-02-21
2 years ago
|
NR.EL-02
|
Hariyanto
|
493-AC3,-493-FN2,-473-HS4,-443-WI1M3,-413-FN2,-413-FA2
|
rekondisi motor
|
Bongkar mptor untuk di rekondisi keluar
|
|
2024-02-21
2 years ago
|
NR.EL-01
|
Yurizal Rachman
|
433-BF1
|
Check dan service
|
Check dan service solenoid purging
|
|
2024-02-21
2 years ago
|
NR.EL-01
|
Yurizal Rachman
|
443-RF2
|
Check dan service
|
Check dan servoce motion detector
|
|
2024-02-21
2 years ago
|
NR.EL-01
|
Yurizal Rachman
|
443-RF1
|
Check dan service
|
Check dan service motion detector
|
|
2024-02-21
2 years ago
|
NR.EL-01
|
Yurizal Rachman
|
433-SG7,8-DAN-9
|
Check and service
|
Check and service solenoid dan damper
|
|
2024-02-21
2 years ago
|
NR.N1-OH
|
Yoga Permana
|
433-BE1
|
Safety device
|
Check,repair and replace safety device
|
|
2024-02-20
2 years ago
|
NR.N1-OH
|
Radifan Almas Sudaryadi
|
4C2-2RC.21
|
Overhaul(Yearly Maintenance)
|
Clean Up, rapihkan kabel,
|
|
2024-02-20
2 years ago
|
NR.N1-OH
|
Radifan Almas Sudaryadi
|
4W3-1NE
|
Overhaul(Yearly Maintenance)
|
Clean Up dan cek panel power dan welding
|
|
2024-02-21
2 years ago
|
NR.SHIFT
|
Radifan Almas Sudaryadi
|
473-FA9
|
Overhaul(Yearly Maintenance)
|
Clean up LCS, cek box motor dan winding
|
|
2024-02-20
2 years ago
|
NR.SHIFT
|
Radifan Almas Sudaryadi
|
473-FAA
|
Overhaul(Yearly Maintenance)
|
Clean Up LCS, Box power motor dan box winding
|
|
2024-02-19
2 years ago
|
NR.N1-OH
|
Radifan Almas Sudaryadi
|
493-BF3
|
Overhaul(Yearly Maintenance)
|
Clean up dan cek LCS serta kontrol BF
|
|
2024-02-21
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ACCES-CONTROL-INSPECTION-ELECTRICAL-AND-WELDING-TOOLS-OF-CONTRACTOR
|
Tagging for electrical and welding tools of contractor already expire date and month
|
Do inspection electrical and welding tools of KAJIAN LOGAM PERSADA-MENARA BUKIT LUBUKELI-ARCA SEMESTA ( ADI & FAHRUL MARPAUNG TRUBA JAGA CITA )
|
|
2024-02-19
2 years ago
|
NR.N1-OH
|
Radifan Almas Sudaryadi
|
493-BF2
|
Overhaul(Yearly Maintenance)
|
Clan Up dan cek LCS serta control BF
|
|
2024-02-19
2 years ago
|
NR.N1-OH
|
Radifan Almas Sudaryadi
|
493-FN4
|
Overhaul(Yearly Maintenance)
|
Clean Up LCS dan Box Motor
|
|
2024-02-19
2 years ago
|
NR.N1-OH
|
Radifan Almas Sudaryadi
|
493-FN3
|
Overhaul(Yearly Maintenance)
|
Clean Up LCS dan Box Motor
|
|
2024-02-19
2 years ago
|
NR.N1-OH
|
Radifan Almas Sudaryadi
|
493-FN2
|
Overhaul(Yearly Maintenance)
|
Clean Up LCS dan Box Motor
|
|
2024-02-19
2 years ago
|
NR.N1-OH
|
Radifan Almas Sudaryadi
|
493-FN1
|
Overhaul(Yearly Maintenance)
|
Clean Up LCS dan Box Motor
|
|
2024-02-19
2 years ago
|
NR.N1-OH
|
Radifan Almas Sudaryadi
|
493-EH1
|
Overhaul(Yearly Maintenance)
|
Clean Up LCS dan ganti Switch INS 63
|
|
2024-02-19
2 years ago
|
NR.N1-OH
|
Radifan Almas Sudaryadi
|
493-AC4
|
Overhaul(Yearly Maintenance)
|
Clean Up LCS dan Box Motor Pengecekan dan clean Up PCS (kiri dan kanan)
|
|
2024-02-19
2 years ago
|
NR.N1-OH
|
Radifan Almas Sudaryadi
|
493-AC3
|
Overhaul(Yearly Maintenance)
|
Tidak bisa buka dan clean up LCS dan box motor karena sedang ada pekerjaan mekanik Pengecekan dan clean up safety device PCS 1(atas) dan PCS2(bawah)
|
|
2024-02-21
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
393-BF3
|
OH N1
|
Cek dan Service 393-BF3
|
|
2024-02-21
2 years ago
|
NR.N1-OH
|
Rizky Fauzy Ramadhan
|
393-BF2
|
OH N1
|
Cek dan Service 393-BF2
|
|
2024-02-20
2 years ago
|
NR.EL-01
|
Yurizal Rachman
|
443-PH1
|
Calibration pressure tx
|
Lepas dan kalibras pressure transmitter area preheater
|
|
2024-02-19
2 years ago
|
NR.SHIFT
|
Ade Mulyadi
|
ALL-PRESSURE-TRANSMITTER-COOLER-NAR1
|
KDT Nar1 2024
|
Dismantle pressure transmitter
|
|
2024-02-19
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
M03-WT1
|
bearing motor lifetime
|
Bongkar motor clean up motor ganti bearing 6312 ZZ dan 6212 ZZ rakit motor dan repainting
|
|
2024-02-19
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-302
|
Kaca counter arrester buram
|
Clean up kaca counter arrester modif frame kaca counter
|
|
2024-02-19
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
TRAFO-NAR1_2
|
WBI
|
WBI Trafo OTR A, B, 2, 3, 301, 302
|
|
2024-02-18
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-3
|
Yearly Maintenance (OH)
|
Supervisi PT Quadro - Insulation Resistance Test (Before) - Polarization Index (Before) - Drain Oil maintank - Inject Nitrogen Maintank - Drain Oil OLTC - Ganti Gasket OLTC - Bolt Tightening OLTC - Filling Oil Maintank
|
|
2024-02-18
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-302
|
Yearly Maintenance (OH)
|
Supervisi PT Megavolt - Drain Oli - Ganti gasket LV bushing, gasket oil level dan gasket butterfly valve atas bukholz
|
|
2024-02-17
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-302
|
Yearly Maintenance (OH)
|
Supervisi PT Megavolt - Lepas Koneksi HV dan LV - Test Tan Delta (Before) - DIRANA (Before) - Turn Ratio Test (Before) - Winding Resistace Test (Before) - Dynamic Resistance (Before)
|
|
2024-02-17
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
OTR-3
|
Yearly Maintenance (OH)
|
Supervisi PT Quadro - Pembuatan Gasket OLTC - Test Tan Delta (Before) - DIRANA (Before) - Turn Ratio Test (Before) - Winding Resistace Test (Before) - Dynamic Resistance (Before)
|
|
2024-02-17
2 years ago
|
NR.EL-03
|
Bayu Kiln Saputro
|
214-TR1
|
trip indikasi VSD GF (ground fault)
|
214-TR1 Motor Travel coba discouple motor test noload ampere 80A ada noise di motor beberapa saat GF lagi di VSD turunkan motor, riwinding by Sigma
|
|
2024-02-20
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
483-2K1
|
KDT
|
Service and calibration analyzer
|
|
2024-02-21
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
483-AE1
|
KDT
|
Service purging solenoid Test simulation purging
|
|
2024-02-20
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
453-AE1
|
KDT
|
Service membrane solenoid
|
|
2024-02-20
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
L63-LD1
|
KDT
|
Test open / close dari CCR
|
|
2024-02-20
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
393.-BE1
|
OH nar1
|
Service safety device
|
|
2024-02-20
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
393-3S3
|
OH nar1
|
Service level matrial
|
|
2024-02-20
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
393-3S2
|
OH nar1
|
Service level matrial
|
|
2024-02-20
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
393-3S1
|
OH nar1
|
Service level matrial
|
|
2024-02-20
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
393-AE2
|
OH nar1
|
Cek dan service selenoid
|
|
2024-02-20
2 years ago
|
NR.EL-02
|
Yana Yuhana
|
393-AE1
|
OH nar1
|
Cek dan service selenoid
|
|
2024-02-20
2 years ago
|
NR.EL-02
|
Hariyanto
|
363-SR1,473-FN1,473-FN3,473-FA8
|
rekondisi motor
|
Bongkar motor untuk di rekondisi ke pt mesindo dan cigma
|
|
2024-02-20
2 years ago
|
NR.N1-OH
|
Yoga Permana
|
463-2K1,-443-PH1
|
Overhaul
|
-Replace proximity IKGA -Remove Transmiter Preheater
|
|
2024-02-20
2 years ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ACCES-CONTROL-INSPECTION-ELECTRICAL-AND-WELDING-TOOLS-OF-CONTRACTOR
|
Tagging for electrical and welding tools of contractor already expired
|
Do inspection electrical and welding tools of MESINDO-MENARA BUKIT LUBUKELI-INDOPORLEN-MAGNA INDONESIA ( ADI & FAHRUL MARPAUNG TRUBA JAGA CITA )
|
|
2024-02-19
2 years ago
|
NR.EL-02
|
Hariyanto
|
483-BL9
|
Rekondisi motor
|
Bongkar motor
|
|
2024-02-19
2 years ago
|
NR.EL-01
|
Titok Pangesti Aji
|
L63-RM1
|
KDT NR1
|
Turunkan semua pressure transmitter area coalmill
|
|
2024-02-19
2 years ago
|
NR.EL-02
|
Titok Pangesti Aji
|
444-2K2
|
oxigen tinggi
|
Ada kebocoran di sample line dan membran solenoid valve
|