Detail NR1 ELEC/INST RM/KL/CM
2024-12-05
WORK-SHOP
Wahyu Adi Triono
Problem: Fabrication or prepare welding point, cable position at coal mill. Cover PG at blending
Action:
Fabrication welding point install at 463 KL1 and install cover PG at blending ( ANDRI & FIRMAN & MUHAIMIN & EVE IQBAL )

Status: done
Back to report list