443-PH1-3RD-FLOOR
Wahyu Adi TrionoProblem: Air lancing observation activation
Action:
Check at side found there are air supply and cable power. Check at I/O panel 4th floor cable is ready. Advise install panel for relay at beside panel I/O 4C1-2RB-75 ( JAJAT & ADI )
Status: done
Back to report list