Detail NR1 ELEC/INST RM/KL/CM
2026-10-02
443-EL1
Wahyu Adi Triono
Problem: Continue fabrication door-prepare cover of wall-tidy up elevator control
Action:
Fabrication door also install cover of wall and di tidy up elevator control use brush and equipment cleaning tools ( JAJAT & AGUS & RIZAL &  ANDRI & MUHAIMIN & DADANG )

Status: done
Back to report list