Detail NR1 ELEC/INST RM/KL/CM
2025-09-17
WORK-SHOP
Wahyu Adi Triono
Problem: Prepare box and PS 12 VDC 20A
Action:
Prepare box for power supply 12 VDC 20A, install power supply and cable power input bring panel to CCR server room give to Mr.Muklas ES ( MUHAIMIN & ADI )

Status: done
Back to report list