443-Z2B-P1-&-443-Z4A-&-443-Z4B-
Wahyu Adi TrionoProblem: Repare tubing and extend pipe draft
Action:
Repare tubing for sample pressure at cyclone 2. Do extend pipe draft of sample line pressure at cyclone 4 result ok ( RIZAL & ANDRI )
Status: done
Back to report list