Detail NR1 ELEC/INST RM/KL/CM
2024-12-31
443-EL1-&-SUMP-PUMP-EL1
Wahyu Adi Triono
Problem: PMR service elevator and WBI sump pump
Action:
PMR service elevator, clean up elevator room and door for every floor from dirty of dust. Test run elevator from 8th to 1st floor result ok ( MUHAIMIN & ADI )

Status: done
Back to report list