Detail NR1 ELEC/INST RM/KL/CM
2024-10-31
413-3B1-PG1-&-443-PH1-2ND-FLOOR
Wahyu Adi Triono
Problem: Fabrication cover solenoid valve PG and support cable at 2nd floor pre heater
Action:
Fabrication cover s/v, installing cover PG. Make support cable at 2nd floor pre heater ( RIZAL & ANDRI )

Status: done
Back to report list