Detail NR1 ELEC/INST RM/KL/CM
2024-02-06
ER3-INSTALL-CONTROL-START-AND-STOP-VCB
Wahyu Adi Triono
Problem: Control start and stop VCB is not install yet for panel
Action:
Do install panel control start and stop VCB. Prepare cable tray and cable power ( AGUS & ANDRI )

Status: done
Back to report list