Detail NR1 ELEC/INST RM/KL/CM
2024-01-15
473-EH4-CONTINUE-INSTALATION-POWER-HOIST
Wahyu Adi Triono
Problem: Power HOIST is not install yet
Action:
Do instalation power HOIST and connecting at LCS. Do test functional of HOIST result ok (FIRMAn & ANDRI)

Status: done
Back to report list