Detail NR ELEC/INST CR/RE/UTILITY & WORKSHOP
2024-01-10
M04-WP8
Bayu Kiln Saputro
Problem: Scun Kabel Beda Ukuran Dengan Terminal (penggantian pompa dan motor)
Action:
Pull Back Kabel Existing LCS To Motor (4x50mm = 2tarikan)
Pulling kabel 150mm LCS To Motor
Pasang Scun di kabel arah LCS
Connect kabel di LCS

Status: done