Detail NR1 ELEC/INST RM/KL/CM
2023-12-01
443-PH1-TPM-PAINTING-TANK-INSTUREMENT-AIR-PIPE-WAY,-HSUPPORT-PANEL-BASE-PLATE-LA3-VA1-AND-INSTALL-SIGN-SAFTEY-METERIAL-HOTAND-RAIL-
Wahyu Adi Triono
Problem: Tank instrument air and pipe are not yet painting with blue color, support panel also base plate LA3 VA1 are not painting with grey color
Action:
Do clean up area tank instrument air and pipe continue repainting blue, hand rail repainting yellow color, support panel and base plate LA3 VA1 with grey color. Install sign safety meterial hot positive from ducting pre heater 2 each

Status: done
Back to report list