Detail NR1 ELEC/INST RM/KL/CM
2023-11-23
363-RM1-CHECK-PANEL-LIGHTING-&-WELDING,-MCC-DOOR-ROOM-MUST-BE-LOCK,-ALSO-PANEL-INPUT-OUTPUT-PANEL-MUST-BE-LOCK-CHECK-EMERGENCY-LAMP-ER3-
Wahyu Adi Triono
Problem: Panel lighting and welding not lock tight worry water and dust come inside. MCC door also is not lock properly, functional lamp emergency is off
Action:
Do check panel lighting & welding for area Raw Mill and feed bin already lock properly, MCC panel door also lock, functional emergency lamp at ER3 is on when power supply dismantle

Status: done
Back to report list